Schedule III - Real Estate and Accumulated Depreciation - Real Estate and Accumulated Depreciation, by Property (Details) - USD ($)
|
Dec. 31, 2024 |
Dec. 31, 2023 |
Dec. 31, 2022 |
Dec. 31, 2021 |
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
$ 30,000,000
|
|
|
|
| Land |
590,000,000
|
|
|
|
| Buildings and Improvements |
5,053,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,072,000,000
|
|
|
|
| Buildings and Improvements |
21,194,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,662,000,000
|
|
|
|
| Buildings and Improvements |
26,247,000,000
|
|
|
|
| Accumulated Depreciation |
(9,639,000,000)
|
$ (9,089,000,000)
|
$ (8,095,000,000)
|
$ (7,275,000,000)
|
| Taxable basis in aggregate initial cost |
34,000,000,000
|
|
|
|
| Operating lease |
|
|
|
|
| Total Costs |
|
|
|
|
| Initial cost |
0
|
|
|
|
| Americas | AT1 ATLANTA (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
309,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
309,000,000
|
|
|
|
| Accumulated Depreciation |
(116,000,000)
|
|
|
|
| Americas | AT4 ATLANTA (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
31,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
51,000,000
|
|
|
|
| Accumulated Depreciation |
(21,000,000)
|
|
|
|
| Americas | BG1 BOGOTÁ (METRO), COLOMBIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Accumulated Depreciation |
(8,000,000)
|
|
|
|
| Americas | BG2 BOGOTÁ (METRO), COLOMBIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
46,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
46,000,000
|
|
|
|
| Accumulated Depreciation |
(3,000,000)
|
|
|
|
| Americas | BO2 BOSTON (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
30,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
(1,000,000)
|
|
|
|
| Buildings and Improvements |
44,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
74,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| Americas | CH1 CHICAGO (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
122,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
122,000,000
|
|
|
|
| Accumulated Depreciation |
(90,000,000)
|
|
|
|
| Americas | CH2 CHICAGO (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
90,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
90,000,000
|
|
|
|
| Accumulated Depreciation |
(37,000,000)
|
|
|
|
| Americas | CH3 CHICAGO (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
10,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
357,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
10,000,000
|
|
|
|
| Buildings and Improvements |
357,000,000
|
|
|
|
| Accumulated Depreciation |
(184,000,000)
|
|
|
|
| Americas | CH4 CHICAGO (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
148,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
148,000,000
|
|
|
|
| Accumulated Depreciation |
(32,000,000)
|
|
|
|
| Americas | CH7 CHICAGO (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| Americas | CL1 CALGARY (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| Americas | CL2 CALGARY (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
14,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| Americas | CL3 CALGARY (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
69,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
55,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
124,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| Americas | CU1 CULPEPER (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Accumulated Depreciation |
(24,000,000)
|
|
|
|
| Americas | CU2 CULPEPER (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
48,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
65,000,000
|
|
|
|
| Accumulated Depreciation |
(30,000,000)
|
|
|
|
| Americas | CU3 CULPEPER (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
53,000,000
|
|
|
|
| Accumulated Depreciation |
(23,000,000)
|
|
|
|
| Americas | CU4 CULPEPER (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
28,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
39,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
67,000,000
|
|
|
|
| Accumulated Depreciation |
(22,000,000)
|
|
|
|
| Americas | DA1 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
74,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
74,000,000
|
|
|
|
| Accumulated Depreciation |
(45,000,000)
|
|
|
|
| Americas | DA2 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
84,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
84,000,000
|
|
|
|
| Accumulated Depreciation |
(43,000,000)
|
|
|
|
| Americas | DA3 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
103,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
103,000,000
|
|
|
|
| Accumulated Depreciation |
(53,000,000)
|
|
|
|
| Americas | DA4 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Accumulated Depreciation |
(13,000,000)
|
|
|
|
| Americas | DA6 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
191,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
212,000,000
|
|
|
|
| Accumulated Depreciation |
(76,000,000)
|
|
|
|
| Americas | DA7 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
33,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
33,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| Americas | DA9 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
24,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| Americas | DA11 DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
69,000,000
|
|
|
|
| Buildings and Improvements |
440,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
69,000,000
|
|
|
|
| Buildings and Improvements |
440,000,000
|
|
|
|
| Accumulated Depreciation |
(48,000,000)
|
|
|
|
| Americas | INFOMART BUILDING DALLAS (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
24,000,000
|
|
|
|
| Buildings and Improvements |
338,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
28,000,000
|
|
|
|
| Buildings and Improvements |
372,000,000
|
|
|
|
| Accumulated Depreciation |
(74,000,000)
|
|
|
|
| Americas | DC1 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| Americas | DC2 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
191,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
191,000,000
|
|
|
|
| Accumulated Depreciation |
(101,000,000)
|
|
|
|
| Americas | DC3 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
57,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
94,000,000
|
|
|
|
| Accumulated Depreciation |
(62,000,000)
|
|
|
|
| Americas | DC4 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
42,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
49,000,000
|
|
|
|
| Accumulated Depreciation |
(30,000,000)
|
|
|
|
| Americas | DC5 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
47,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
52,000,000
|
|
|
|
| Accumulated Depreciation |
(29,000,000)
|
|
|
|
| Americas | DC6 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
95,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
100,000,000
|
|
|
|
| Accumulated Depreciation |
(67,000,000)
|
|
|
|
| Americas | DC7 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Accumulated Depreciation |
(17,000,000)
|
|
|
|
| Americas | DC10 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
65,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
110,000,000
|
|
|
|
| Accumulated Depreciation |
(101,000,000)
|
|
|
|
| Americas | DC11 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
189,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
194,000,000
|
|
|
|
| Accumulated Depreciation |
(98,000,000)
|
|
|
|
| Americas | DC12 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
102,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
84,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
186,000,000
|
|
|
|
| Accumulated Depreciation |
(66,000,000)
|
|
|
|
| Americas | DC13 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
29,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
54,000,000
|
|
|
|
| Accumulated Depreciation |
(23,000,000)
|
|
|
|
| Americas | DC14 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
19,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
53,000,000
|
|
|
|
| Accumulated Depreciation |
(21,000,000)
|
|
|
|
| Americas | DC15 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
210,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
210,000,000
|
|
|
|
| Accumulated Depreciation |
(45,000,000)
|
|
|
|
| Americas | DC16 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
341,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
341,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| Americas | DC21 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
324,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
324,000,000
|
|
|
|
| Accumulated Depreciation |
(37,000,000)
|
|
|
|
| Americas | DC97 WASHINGTON, D.C. (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Americas | DE1 DENVER (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| Americas | DE2 DENVER (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
23,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
60,000,000
|
|
|
|
| Accumulated Depreciation |
(27,000,000)
|
|
|
|
| Americas | HO1 HOUSTON (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
24,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
62,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| Americas | KA1 KAMLOOPS (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
47,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
74,000,000
|
|
|
|
| Accumulated Depreciation |
(15,000,000)
|
|
|
|
| Americas | LA1 LOS ANGELES (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
112,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
112,000,000
|
|
|
|
| Accumulated Depreciation |
(88,000,000)
|
|
|
|
| Americas | LA2 LOS ANGELES (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Accumulated Depreciation |
(10,000,000)
|
|
|
|
| Americas | LA3 LOS ANGELES (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
57,000,000
|
|
|
|
| Accumulated Depreciation |
(52,000,000)
|
|
|
|
| Americas | LA4 LOS ANGELES (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
138,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
63,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
201,000,000
|
|
|
|
| Accumulated Depreciation |
(105,000,000)
|
|
|
|
| Americas | LA7 LOS ANGELES (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
58,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
92,000,000
|
|
|
|
| Accumulated Depreciation |
(29,000,000)
|
|
|
|
| Americas | LM1 LIMA (METRO), PERU |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
14,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Americas | MI1 MIAMI (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
127,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
218,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
345,000,000
|
|
|
|
| Accumulated Depreciation |
(120,000,000)
|
|
|
|
| Americas | MI2 MIAMI (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Accumulated Depreciation |
(18,000,000)
|
|
|
|
| Americas | MI3 MIAMI (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Accumulated Depreciation |
(27,000,000)
|
|
|
|
| Americas | MI6 MIAMI (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
23,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
14,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Accumulated Depreciation |
(17,000,000)
|
|
|
|
| Americas | MO1 MONTERREY (METRO), MEXICO |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| Americas | MT1 MONTREAL (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
77,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
34,000,000
|
|
|
|
| Buildings and Improvements |
72,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
34,000,000
|
|
|
|
| Buildings and Improvements |
149,000,000
|
|
|
|
| Accumulated Depreciation |
(31,000,000)
|
|
|
|
| Americas | MT2 MONTREAL (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
58,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
95,000,000
|
|
|
|
| Accumulated Depreciation |
(13,000,000)
|
|
|
|
| Americas | MX1 MEXICO CITY (METRO), MEXICO |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
54,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
53,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
107,000,000
|
|
|
|
| Accumulated Depreciation |
(22,000,000)
|
|
|
|
| Americas | MX2 MEXICO CITY (METRO), MEXICO |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
118,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
134,000,000
|
|
|
|
| Accumulated Depreciation |
(14,000,000)
|
|
|
|
| Americas | NY1 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
75,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
75,000,000
|
|
|
|
| Accumulated Depreciation |
(56,000,000)
|
|
|
|
| Americas | NY2 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
18,000,000
|
|
|
|
| Buildings and Improvements |
209,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
18,000,000
|
|
|
|
| Buildings and Improvements |
209,000,000
|
|
|
|
| Accumulated Depreciation |
(144,000,000)
|
|
|
|
| Americas | NY3 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
38,000,000
|
|
|
|
| Buildings and Improvements |
391,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
38,000,000
|
|
|
|
| Buildings and Improvements |
391,000,000
|
|
|
|
| Accumulated Depreciation |
(15,000,000)
|
|
|
|
| Americas | NY4 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
387,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
387,000,000
|
|
|
|
| Accumulated Depreciation |
(243,000,000)
|
|
|
|
| Americas | NY5 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
324,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
324,000,000
|
|
|
|
| Accumulated Depreciation |
(139,000,000)
|
|
|
|
| Americas | NY6 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
104,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
104,000,000
|
|
|
|
| Accumulated Depreciation |
(34,000,000)
|
|
|
|
| Americas | NY7 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
149,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
174,000,000
|
|
|
|
| Accumulated Depreciation |
(141,000,000)
|
|
|
|
| Americas | NY9 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
59,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
59,000,000
|
|
|
|
| Accumulated Depreciation |
(32,000,000)
|
|
|
|
| Americas | NY11 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
59,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
141,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
200,000,000
|
|
|
|
| Accumulated Depreciation |
(44,000,000)
|
|
|
|
| Americas | NY13 NEW YORK (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
32,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
39,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| Americas | OT1 OTTAWA (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
39,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
42,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| Americas | PH1 PHILADELPHIA (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Accumulated Depreciation |
(28,000,000)
|
|
|
|
| Americas | RJ1 RIO DE JANEIRO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| Americas | RJ2 RIO DE JANEIRO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
85,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
87,000,000
|
|
|
|
| Accumulated Depreciation |
(31,000,000)
|
|
|
|
| Americas | RJ3 RIO DE JANEIRO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
49,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
49,000,000
|
|
|
|
| Accumulated Depreciation |
0
|
|
|
|
| Americas | SE2 SEATTLE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
31,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
31,000,000
|
|
|
|
| Accumulated Depreciation |
(28,000,000)
|
|
|
|
| Americas | SE3 SEATTLE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
102,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
104,000,000
|
|
|
|
| Accumulated Depreciation |
(83,000,000)
|
|
|
|
| Americas | SE4 SEATTLE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
13,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
85,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
98,000,000
|
|
|
|
| Accumulated Depreciation |
(23,000,000)
|
|
|
|
| Americas | SJ1 SAINT JOHN (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
14,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| Americas | SP1 SÃO PAULO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
24,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Accumulated Depreciation |
(23,000,000)
|
|
|
|
| Americas | SP2 SÃO PAULO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
48,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
48,000,000
|
|
|
|
| Accumulated Depreciation |
(34,000,000)
|
|
|
|
| Americas | SP3 SÃO PAULO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
73,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
172,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
245,000,000
|
|
|
|
| Accumulated Depreciation |
(72,000,000)
|
|
|
|
| Americas | SP4 SÃO PAULO (METRO), BRAZIL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
92,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
114,000,000
|
|
|
|
| Accumulated Depreciation |
(35,000,000)
|
|
|
|
| Americas | ST1 SANTIAGO (METRO), CHILE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
13,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Accumulated Depreciation |
(6,000,000)
|
|
|
|
| Americas | ST2 SANTIAGO (METRO), CHILE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
50,000,000
|
|
|
|
| Accumulated Depreciation |
(3,000,000)
|
|
|
|
| Americas | ST3 SANTIAGO (METRO), CHILE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
19,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| Americas | ST4 SANTIAGO (METRO), CHILE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Americas | SV1 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
16,000,000
|
|
|
|
| Buildings and Improvements |
153,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
16,000,000
|
|
|
|
| Buildings and Improvements |
153,000,000
|
|
|
|
| Accumulated Depreciation |
(113,000,000)
|
|
|
|
| Americas | SV2 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
161,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
161,000,000
|
|
|
|
| Accumulated Depreciation |
(120,000,000)
|
|
|
|
| Americas | SV3 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
82,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
82,000,000
|
|
|
|
| Accumulated Depreciation |
(51,000,000)
|
|
|
|
| Americas | SV4 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
113,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
113,000,000
|
|
|
|
| Accumulated Depreciation |
(43,000,000)
|
|
|
|
| Americas | SV5 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
99,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
109,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
208,000,000
|
|
|
|
| Accumulated Depreciation |
(118,000,000)
|
|
|
|
| Americas | SV8 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
158,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
158,000,000
|
|
|
|
| Accumulated Depreciation |
(61,000,000)
|
|
|
|
| Americas | SV10 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
13,000,000
|
|
|
|
| Buildings and Improvements |
124,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
97,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
13,000,000
|
|
|
|
| Buildings and Improvements |
221,000,000
|
|
|
|
| Accumulated Depreciation |
(75,000,000)
|
|
|
|
| Americas | SV11 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
235,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
235,000,000
|
|
|
|
| Accumulated Depreciation |
(28,000,000)
|
|
|
|
| Americas | SV14 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| Americas | SV15 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
23,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
30,000,000
|
|
|
|
| Accumulated Depreciation |
(15,000,000)
|
|
|
|
| Americas | SV16 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
19,000,000
|
|
|
|
| Accumulated Depreciation |
(10,000,000)
|
|
|
|
| Americas | SV17 SILICON VALLEY (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Accumulated Depreciation |
(19,000,000)
|
|
|
|
| Americas | TR1 TORONTO (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
81,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
81,000,000
|
|
|
|
| Accumulated Depreciation |
(39,000,000)
|
|
|
|
| Americas | TR2 TORONTO (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
94,000,000
|
|
|
|
| Buildings and Improvements |
145,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
94,000,000
|
|
|
|
| Buildings and Improvements |
166,000,000
|
|
|
|
| Accumulated Depreciation |
(50,000,000)
|
|
|
|
| Americas | TR4 TORONTO (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
14,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Accumulated Depreciation |
(14,000,000)
|
|
|
|
| Americas | TR5 MARKHAM (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(14,000,000)
|
|
|
|
| Americas | TR6 BRAMPTON (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
9,000,000
|
|
|
|
| Buildings and Improvements |
59,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
97,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
11,000,000
|
|
|
|
| Buildings and Improvements |
156,000,000
|
|
|
|
| Accumulated Depreciation |
(15,000,000)
|
|
|
|
| Americas | TR7 BRAMPTON (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
9,000,000
|
|
|
|
| Buildings and Improvements |
72,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
28,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
9,000,000
|
|
|
|
| Buildings and Improvements |
100,000,000
|
|
|
|
| Accumulated Depreciation |
(29,000,000)
|
|
|
|
| Americas | VA1 BURNABY (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| Americas | WI1 WINNIPEG (METRO), CANADA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
57,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
63,000,000
|
|
|
|
| Accumulated Depreciation |
(8,000,000)
|
|
|
|
| Americas | OTHERS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
87,000,000
|
|
|
|
| Buildings and Improvements |
55,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
154,000,000
|
|
|
|
| Buildings and Improvements |
337,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
241,000,000
|
|
|
|
| Buildings and Improvements |
392,000,000
|
|
|
|
| Accumulated Depreciation |
(70,000,000)
|
|
|
|
| EMEA | OTHERS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
56,000,000
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
272,000,000
|
|
|
|
| Buildings and Improvements |
381,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
328,000,000
|
|
|
|
| Buildings and Improvements |
399,000,000
|
|
|
|
| Accumulated Depreciation |
(46,000,000)
|
|
|
|
| EMEA | AB1 ABIDJAN (METRO), CÔTE D'IVOIRE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Accumulated Depreciation |
(1,000,000)
|
|
|
|
| EMEA | AC1 ACCRA (METRO), GHANA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| EMEA | AD1 ABU DHABI (METRO), UNITED ARAB EMIRATES |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
76,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
76,000,000
|
|
|
|
| Accumulated Depreciation |
(34,000,000)
|
|
|
|
| EMEA | AM1 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
85,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
85,000,000
|
|
|
|
| Accumulated Depreciation |
(53,000,000)
|
|
|
|
| EMEA | AM2 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
78,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
78,000,000
|
|
|
|
| Accumulated Depreciation |
(39,000,000)
|
|
|
|
| EMEA | AM3 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
121,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
148,000,000
|
|
|
|
| Accumulated Depreciation |
(79,000,000)
|
|
|
|
| EMEA | AM4 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
206,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
206,000,000
|
|
|
|
| Accumulated Depreciation |
(64,000,000)
|
|
|
|
| EMEA | AM5 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
92,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
100,000,000
|
|
|
|
| Accumulated Depreciation |
(46,000,000)
|
|
|
|
| EMEA | AM6 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
51,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
91,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
142,000,000
|
|
|
|
| Accumulated Depreciation |
(50,000,000)
|
|
|
|
| EMEA | AM7 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
153,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
160,000,000
|
|
|
|
| Accumulated Depreciation |
(49,000,000)
|
|
|
|
| EMEA | AM8 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Accumulated Depreciation |
(8,000,000)
|
|
|
|
| EMEA | AM11 AMSTERDAM (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
13,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
19,000,000
|
|
|
|
| Accumulated Depreciation |
(7,000,000)
|
|
|
|
| EMEA | BA1 BARCELONA (METRO), SPAIN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
28,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| EMEA | BA2 BARCELONA (METRO), SPAIN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
52,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
52,000,000
|
|
|
|
| Accumulated Depreciation |
0
|
|
|
|
| EMEA | BX1 BORDEAUX (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
95,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
99,000,000
|
|
|
|
| Accumulated Depreciation |
(6,000,000)
|
|
|
|
| EMEA | DB1 DUBLIN (METRO), IRELAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Accumulated Depreciation |
(6,000,000)
|
|
|
|
| EMEA | DB2 DUBLIN (METRO), IRELAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
33,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| EMEA | DB3 DUBLIN (METRO), IRELAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
54,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
79,000,000
|
|
|
|
| Accumulated Depreciation |
(35,000,000)
|
|
|
|
| EMEA | DB4 DUBLIN (METRO), IRELAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
47,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| EMEA | DU1 DÜSSELDORF (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Accumulated Depreciation |
(19,000,000)
|
|
|
|
| EMEA | DX1 DUBAI (METRO), UNITED ARAB EMIRATES |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
96,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
96,000,000
|
|
|
|
| Accumulated Depreciation |
(66,000,000)
|
|
|
|
| EMEA | DX2 DUBAI (METRO), UNITED ARAB EMIRATES |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Accumulated Depreciation |
(1,000,000)
|
|
|
|
| EMEA | DX3 DUBAI (METRO), UNITED ARAB EMIRATES |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
74,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
74,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| EMEA | EN1 ENSCHEDE (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
39,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
39,000,000
|
|
|
|
| Accumulated Depreciation |
(25,000,000)
|
|
|
|
| EMEA | FR2 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
17,000,000
|
|
|
|
| Buildings and Improvements |
582,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
17,000,000
|
|
|
|
| Buildings and Improvements |
582,000,000
|
|
|
|
| Accumulated Depreciation |
(207,000,000)
|
|
|
|
| EMEA | FR4 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
11,000,000
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
102,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
11,000,000
|
|
|
|
| Buildings and Improvements |
111,000,000
|
|
|
|
| Accumulated Depreciation |
(51,000,000)
|
|
|
|
| EMEA | FR5 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
30,000,000
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
13,000,000
|
|
|
|
| Buildings and Improvements |
252,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
13,000,000
|
|
|
|
| Buildings and Improvements |
252,000,000
|
|
|
|
| Accumulated Depreciation |
(82,000,000)
|
|
|
|
| EMEA | FR6 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
133,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
133,000,000
|
|
|
|
| Accumulated Depreciation |
(54,000,000)
|
|
|
|
| EMEA | FR7 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
44,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
47,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
91,000,000
|
|
|
|
| Accumulated Depreciation |
(47,000,000)
|
|
|
|
| EMEA | FR8 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
58,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
172,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
230,000,000
|
|
|
|
| Accumulated Depreciation |
(17,000,000)
|
|
|
|
| EMEA | FR13 FRANKFURT (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
105,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
105,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| EMEA | GN1 GENOA (METRO), ITALY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
20,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| EMEA | GV1 GENEVA (METRO), SWITZERLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| EMEA | GV2 GENEVA (METRO), SWITZERLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
83,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
83,000,000
|
|
|
|
| Accumulated Depreciation |
(33,000,000)
|
|
|
|
| EMEA | HE3 HELSINKI (METRO), FINLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| EMEA | HE4 HELSINKI (METRO), FINLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
29,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Accumulated Depreciation |
(28,000,000)
|
|
|
|
| EMEA | HE5 HELSINKI (METRO), FINLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
19,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
5,000,000
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| EMEA | HE6 HELSINKI (METRO), FINLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
55,000,000
|
|
|
|
| Accumulated Depreciation |
(23,000,000)
|
|
|
|
| EMEA | HE7 HELSINKI (METRO), FINLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
7,000,000
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
66,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
73,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| EMEA | HH1 HAMBURG (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
72,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
77,000,000
|
|
|
|
| Accumulated Depreciation |
(13,000,000)
|
|
|
|
| EMEA | IL2 ISTANBUL (METRO), TURKEY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
14,000,000
|
|
|
|
| Buildings and Improvements |
39,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
73,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
14,000,000
|
|
|
|
| Buildings and Improvements |
112,000,000
|
|
|
|
| Accumulated Depreciation |
(24,000,000)
|
|
|
|
| EMEA | IL4 ISTANBUL (METRO), TURKEY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
60,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
62,000,000
|
|
|
|
| Accumulated Depreciation |
(1,000,000)
|
|
|
|
| EMEA | JN1 JOHANNESBURG (METRO), SOUTH AFRICA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Accumulated Depreciation |
0
|
|
|
|
| EMEA | LD3 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Accumulated Depreciation |
(17,000,000)
|
|
|
|
| EMEA | LD4 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
23,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
166,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
189,000,000
|
|
|
|
| Accumulated Depreciation |
(83,000,000)
|
|
|
|
| EMEA | LD5 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
205,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
221,000,000
|
|
|
|
| Accumulated Depreciation |
(121,000,000)
|
|
|
|
| EMEA | LD6 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
159,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
159,000,000
|
|
|
|
| Accumulated Depreciation |
(67,000,000)
|
|
|
|
| EMEA | LD7 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
291,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
291,000,000
|
|
|
|
| Accumulated Depreciation |
(56,000,000)
|
|
|
|
| EMEA | LD8 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
108,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
57,000,000
|
|
|
|
| Buildings and Improvements |
226,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
57,000,000
|
|
|
|
| Buildings and Improvements |
334,000,000
|
|
|
|
| Accumulated Depreciation |
(75,000,000)
|
|
|
|
| EMEA | LD9 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
181,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
242,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
423,000,000
|
|
|
|
| Accumulated Depreciation |
(142,000,000)
|
|
|
|
| EMEA | LD10 LONDON (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
40,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
238,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
278,000,000
|
|
|
|
| Accumulated Depreciation |
(50,000,000)
|
|
|
|
| EMEA | LG1 & LG2 LAGOS (METRO), NIGERIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
50,000,000
|
|
|
|
| Accumulated Depreciation |
(8,000,000)
|
|
|
|
| EMEA | LS1 LISBON (METRO), PORTUGAL |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
41,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| EMEA | MA1 MANCHESTER (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Accumulated Depreciation |
(12,000,000)
|
|
|
|
| EMEA | MA3 MANCHESTER (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
67,000,000
|
|
|
|
| Accumulated Depreciation |
(38,000,000)
|
|
|
|
| EMEA | MA4 MANCHESTER (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| EMEA | MA5 MANCHESTER (METRO), UNITED KINGDOM |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
131,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
4,000,000
|
|
|
|
| Buildings and Improvements |
138,000,000
|
|
|
|
| Accumulated Depreciation |
(13,000,000)
|
|
|
|
| EMEA | MD1 MADRID (METRO), SPAIN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| EMEA | MD2 MADRID (METRO), SPAIN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
41,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
103,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
19,000,000
|
|
|
|
| Buildings and Improvements |
144,000,000
|
|
|
|
| Accumulated Depreciation |
(56,000,000)
|
|
|
|
| EMEA | MD6 MADRID (METRO), SPAIN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
42,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
42,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| EMEA | ML2 MILAN (METRO), ITALY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(21,000,000)
|
|
|
|
| EMEA | ML3 MILAN (METRO), ITALY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Accumulated Depreciation |
(19,000,000)
|
|
|
|
| EMEA | ML5 MILAN (METRO), ITALY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
105,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
126,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| EMEA | MU1 MUNICH (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Accumulated Depreciation |
(23,000,000)
|
|
|
|
| EMEA | MU3 MUNICH (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| EMEA | MU4 MUNICH (METRO), GERMANY |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
11,000,000
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
83,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
11,000,000
|
|
|
|
| Buildings and Improvements |
118,000,000
|
|
|
|
| Accumulated Depreciation |
(12,000,000)
|
|
|
|
| EMEA | PA2 & PA3 PARIS (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
30,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
21,000,000
|
|
|
|
| Buildings and Improvements |
314,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
21,000,000
|
|
|
|
| Buildings and Improvements |
344,000,000
|
|
|
|
| Accumulated Depreciation |
(158,000,000)
|
|
|
|
| EMEA | PA4 PARIS (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
225,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
235,000,000
|
|
|
|
| Accumulated Depreciation |
(110,000,000)
|
|
|
|
| EMEA | PA5 PARIS (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
26,000,000
|
|
|
|
| Accumulated Depreciation |
(12,000,000)
|
|
|
|
| EMEA | PA6 PARIS (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
89,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
89,000,000
|
|
|
|
| Accumulated Depreciation |
(48,000,000)
|
|
|
|
| EMEA | PA7 PARIS (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
30,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
30,000,000
|
|
|
|
| Accumulated Depreciation |
(22,000,000)
|
|
|
|
| EMEA | PA10 PARIS (METRO), FRANCE |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
166,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
166,000,000
|
|
|
|
| Accumulated Depreciation |
(12,000,000)
|
|
|
|
| EMEA | SK1 STOCKHOLM, (METRO), SWEDEN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
53,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
68,000,000
|
|
|
|
| Accumulated Depreciation |
(19,000,000)
|
|
|
|
| EMEA | SK2 STOCKHOLM, (METRO), SWEDEN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
80,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
61,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
141,000,000
|
|
|
|
| Accumulated Depreciation |
(50,000,000)
|
|
|
|
| EMEA | SK3 STOCKHOLM, (METRO), SWEDEN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
48,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
48,000,000
|
|
|
|
| Accumulated Depreciation |
(12,000,000)
|
|
|
|
| EMEA | SO1 SOFIA (METRO), BULGARIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| EMEA | SO2 SOFIA (METRO), BULGARIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| EMEA | WA1 WARSAW (METRO), POLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
26,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
32,000,000
|
|
|
|
| Accumulated Depreciation |
(18,000,000)
|
|
|
|
| EMEA | WA2 WARSAW (METRO), POLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Accumulated Depreciation |
(8,000,000)
|
|
|
|
| EMEA | WA3 WARSAW (METRO), POLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
67,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
67,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| EMEA | ZH2 ZURICH (METRO), SWITZERLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
6,000,000
|
|
|
|
| Accumulated Depreciation |
(5,000,000)
|
|
|
|
| EMEA | ZH4 ZURICH (METRO), SWITZERLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
56,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
67,000,000
|
|
|
|
| Accumulated Depreciation |
(40,000,000)
|
|
|
|
| EMEA | ZH5 ZURICH (METRO), SWITZERLAND |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
253,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
253,000,000
|
|
|
|
| Accumulated Depreciation |
(63,000,000)
|
|
|
|
| EMEA | ZW1 ZWOLLE (METRO), THE NETHERLANDS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Accumulated Depreciation |
(10,000,000)
|
|
|
|
| Asia-Pacific | OTHERS |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
76,000,000
|
|
|
|
| Buildings and Improvements |
225,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
76,000,000
|
|
|
|
| Buildings and Improvements |
227,000,000
|
|
|
|
| Accumulated Depreciation |
(27,000,000)
|
|
|
|
| Asia-Pacific | AE1 ADELAIDE (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Asia-Pacific | BR1 BRISBANE (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Asia-Pacific | CA1 CANBERRA (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
23,000,000
|
|
|
|
| Accumulated Depreciation |
(6,000,000)
|
|
|
|
| Asia-Pacific | HK1 HONG KONG (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
327,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
327,000,000
|
|
|
|
| Accumulated Depreciation |
(148,000,000)
|
|
|
|
| Asia-Pacific | HK2 HONG KONG (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
244,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
244,000,000
|
|
|
|
| Accumulated Depreciation |
(202,000,000)
|
|
|
|
| Asia-Pacific | HK3 HONG KONG (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
191,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
191,000,000
|
|
|
|
| Accumulated Depreciation |
(122,000,000)
|
|
|
|
| Asia-Pacific | HK4 HONG KONG (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Accumulated Depreciation |
0
|
|
|
|
| Asia-Pacific | HK5 HONG KONG (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
70,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
48,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
118,000,000
|
|
|
|
| Accumulated Depreciation |
(47,000,000)
|
|
|
|
| Asia-Pacific | JH1 JOHOR (METRO), MALAYSIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
37,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
42,000,000
|
|
|
|
| Accumulated Depreciation |
(1,000,000)
|
|
|
|
| Asia-Pacific | KL1 KUALA LUMPUR (METRO), MALAYSIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
31,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
46,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Asia-Pacific | MB1 MUMBAI (METRO), INDIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
26,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Accumulated Depreciation |
(9,000,000)
|
|
|
|
| Asia-Pacific | MB2 MUMBAI (METRO), INDIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
57,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
18,000,000
|
|
|
|
| Buildings and Improvements |
(11,000,000)
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
18,000,000
|
|
|
|
| Buildings and Improvements |
46,000,000
|
|
|
|
| Accumulated Depreciation |
(12,000,000)
|
|
|
|
| Asia-Pacific | MB4 MUMBAI (METRO), INDIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
18,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
19,000,000
|
|
|
|
| Accumulated Depreciation |
(2,000,000)
|
|
|
|
| Asia-Pacific | ME1 MELBOURNE (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
13,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
89,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
13,000,000
|
|
|
|
| Buildings and Improvements |
89,000,000
|
|
|
|
| Accumulated Depreciation |
(38,000,000)
|
|
|
|
| Asia-Pacific | ME2 MELBOURNE (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
128,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
128,000,000
|
|
|
|
| Accumulated Depreciation |
(21,000,000)
|
|
|
|
| Asia-Pacific | ME4 MELBOURNE (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
84,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
3,000,000
|
|
|
|
| Buildings and Improvements |
88,000,000
|
|
|
|
| Accumulated Depreciation |
(36,000,000)
|
|
|
|
| Asia-Pacific | OS1 OSAKA (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
6,000,000
|
|
|
|
| Buildings and Improvements |
12,000,000
|
|
|
|
| Accumulated Depreciation |
(4,000,000)
|
|
|
|
| Asia-Pacific | OS1 OSAKA (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
78,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
93,000,000
|
|
|
|
| Accumulated Depreciation |
(51,000,000)
|
|
|
|
| Asia-Pacific | OS3 OSAKA (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
190,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
190,000,000
|
|
|
|
| Accumulated Depreciation |
(42,000,000)
|
|
|
|
| Asia-Pacific | PE1 PERTH (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
1,000,000
|
|
|
|
| Buildings and Improvements |
4,000,000
|
|
|
|
| Accumulated Depreciation |
(1,000,000)
|
|
|
|
| Asia-Pacific | PE2 PERTH (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
16,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
15,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
31,000,000
|
|
|
|
| Accumulated Depreciation |
(13,000,000)
|
|
|
|
| Asia-Pacific | PE3 PERTH (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
55,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
55,000,000
|
|
|
|
| Accumulated Depreciation |
(11,000,000)
|
|
|
|
| Asia-Pacific | SG1 SINGAPORE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
297,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
297,000,000
|
|
|
|
| Accumulated Depreciation |
(156,000,000)
|
|
|
|
| Asia-Pacific | SG2 SINGAPORE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
342,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
342,000,000
|
|
|
|
| Accumulated Depreciation |
(265,000,000)
|
|
|
|
| Asia-Pacific | SG3 SINGAPORE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
35,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
250,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
285,000,000
|
|
|
|
| Accumulated Depreciation |
(116,000,000)
|
|
|
|
| Asia-Pacific | SG4 SINGAPORE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
55,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
154,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
209,000,000
|
|
|
|
| Accumulated Depreciation |
(56,000,000)
|
|
|
|
| Asia-Pacific | SG5 SINGAPORE (METRO) |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
348,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
348,000,000
|
|
|
|
| Accumulated Depreciation |
(61,000,000)
|
|
|
|
| Asia-Pacific | SH2 SHANGHAI (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
8,000,000
|
|
|
|
| Accumulated Depreciation |
(6,000,000)
|
|
|
|
| Asia-Pacific | SH3 SHANGHAI (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
7,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
14,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
21,000,000
|
|
|
|
| Accumulated Depreciation |
(10,000,000)
|
|
|
|
| Asia-Pacific | SH5 SHANGHAI (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
25,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
36,000,000
|
|
|
|
| Accumulated Depreciation |
(22,000,000)
|
|
|
|
| Asia-Pacific | SH6 SHANGHAI (METRO), CHINA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
17,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
34,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
51,000,000
|
|
|
|
| Accumulated Depreciation |
(15,000,000)
|
|
|
|
| Asia-Pacific | SL1 SEOUL (METRO), SOUTH KOREA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
29,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
56,000,000
|
|
|
|
| Accumulated Depreciation |
(28,000,000)
|
|
|
|
| Asia-Pacific | SL4 SEOUL (METRO), SOUTH KOREA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
5,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(3,000,000)
|
|
|
|
| Asia-Pacific | SY1 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
73,000,000
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
73,000,000
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Accumulated Depreciation |
(24,000,000)
|
|
|
|
| Asia-Pacific | SY2 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
3,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
24,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
27,000,000
|
|
|
|
| Accumulated Depreciation |
(22,000,000)
|
|
|
|
| Asia-Pacific | SY3 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
9,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
128,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
137,000,000
|
|
|
|
| Accumulated Depreciation |
(95,000,000)
|
|
|
|
| Asia-Pacific | SY4 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
162,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
162,000,000
|
|
|
|
| Accumulated Depreciation |
(80,000,000)
|
|
|
|
| Asia-Pacific | SY5 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
72,000,000
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
343,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
72,000,000
|
|
|
|
| Buildings and Improvements |
343,000,000
|
|
|
|
| Accumulated Depreciation |
(45,000,000)
|
|
|
|
| Asia-Pacific | SY6 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
64,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
36,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
8,000,000
|
|
|
|
| Buildings and Improvements |
100,000,000
|
|
|
|
| Accumulated Depreciation |
(22,000,000)
|
|
|
|
| Asia-Pacific | SY7 SYDNEY (METRO), AUSTRALIA |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
47,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
2,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
2,000,000
|
|
|
|
| Buildings and Improvements |
49,000,000
|
|
|
|
| Accumulated Depreciation |
(14,000,000)
|
|
|
|
| Asia-Pacific | TY1 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
28,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
28,000,000
|
|
|
|
| Accumulated Depreciation |
(20,000,000)
|
|
|
|
| Asia-Pacific | TY2 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
100,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
100,000,000
|
|
|
|
| Accumulated Depreciation |
(54,000,000)
|
|
|
|
| Asia-Pacific | TY3 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
56,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
56,000,000
|
|
|
|
| Accumulated Depreciation |
(38,000,000)
|
|
|
|
| Asia-Pacific | TY4 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
63,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
63,000,000
|
|
|
|
| Accumulated Depreciation |
(38,000,000)
|
|
|
|
| Asia-Pacific | TY5 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
45,000,000
|
|
|
|
| Accumulated Depreciation |
(15,000,000)
|
|
|
|
| Asia-Pacific | TY6 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
38,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
13,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
51,000,000
|
|
|
|
| Accumulated Depreciation |
(42,000,000)
|
|
|
|
| Asia-Pacific | TY7 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
13,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
11,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
24,000,000
|
|
|
|
| Accumulated Depreciation |
(16,000,000)
|
|
|
|
| Asia-Pacific | TY8 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
54,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
10,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
64,000,000
|
|
|
|
| Accumulated Depreciation |
(34,000,000)
|
|
|
|
| Asia-Pacific | TY9 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
93,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
0
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
93,000,000
|
|
|
|
| Accumulated Depreciation |
(74,000,000)
|
|
|
|
| Asia-Pacific | TY10 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
66,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
1,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
67,000,000
|
|
|
|
| Accumulated Depreciation |
(32,000,000)
|
|
|
|
| Asia-Pacific | TY11 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
22,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
207,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
229,000,000
|
|
|
|
| Accumulated Depreciation |
(45,000,000)
|
|
|
|
| Asia-Pacific | TY15 TOKYO (METRO), JAPAN |
|
|
|
|
| Initial Costs to Company |
|
|
|
|
| Encumbrances |
0
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
109,000,000
|
|
|
|
| Costs Capitalized Subsequent to Acquisition or Lease |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
111,000,000
|
|
|
|
| Total Costs |
|
|
|
|
| Land |
0
|
|
|
|
| Buildings and Improvements |
220,000,000
|
|
|
|
| Accumulated Depreciation |
$ (4,000,000)
|
|
|
|