v3.25.3
Property, Plant and Equipment
12 Months Ended
Jun. 30, 2025
Property, plant and equipment [abstract]  
Property, Plant and Equipment Property, plant and equipment
SA Rand
Figures in million
2025
2024
Mining assets
34 628
28 884
Mining assets under construction
8 712
7 502
Undeveloped properties
4 341
4 475
Other non-mining assets
588
487
Total property, plant and equipment
48 269
41 348
Mining assets
Accounting policy
Mining assets, including mine development costs and mine plant facilities, are initially recorded at cost, whereafter they are
measured at cost less accumulated depreciation and impairment. Costs include expenditure that is directly attributable to the
acquisition of the items. Subsequent costs are included in the asset’s carrying amount or recognised as a separate asset, as
appropriate, only when it is probable that future economic benefits associated with the item will flow to the group and the cost of
the item can be measured reliably.
The net assets of operations placed on care and maintenance are impaired to their recoverable amount. Expenditure on the care
and maintenance of these operations is charged against income, as incurred. Mineral and surface use rights represent mineral
and surface use rights for parcels of land, both owned and not owned by the group.
Mineral and surface rights include acquired mineral use rights in production, development and exploration phase properties. The
amount capitalised related to a mineral and surface right, either as an individual asset purchase or as part of a business
combination, is the fair value at acquisition.
The group’s mineral use rights are enforceable regardless of whether proved or probable reserves have been established. In
certain limited situations, the nature of use changes from an exploration right to a mining right upon the establishment of proved
and probable reserves. The group has the ability and intent to renew mineral use rights where the existing term is not sufficient
to recover all identified and valued proved and probable reserves and/or undeveloped mineral interests.
Depreciation
Depreciation of mining assets is computed principally by the units-of-production method over life-of-mine based on estimated
quantities of economically recoverable proved and probable reserves, which can be recovered in future from known mineral
deposits.
Mineral rights associated with production phase mineral interests are amortised over the life-of-mine using the units-of-
production method in order to match the amortisation with the expected underlying future cash flows.
Impairment
Testing for impairment is done in terms of the group policy as discussed in note 2.5.
Scrapping of assets
Where significant adverse changes have taken place relating to the useful life of an asset, that asset is tested for impairment in
terms of the group policy as discussed in note 2.5. Whether or not an impairment is recognised, it is then necessary to review
the useful lives and residual values of the assets within the CGU – this is reviewed at least annually. Where necessary, the
useful lives and residual values of the individual assets are revised.
Where the useful life of an asset is nil as a result of no future economic benefit expected from the use or disposal of that asset, it
is necessary to derecognise the asset. The loss arising from the derecognition is included in profit or loss in the period in which
the asset was derecognised.
Stripping activities
The removal of overburden and other mine waste materials is often necessary during the initial development of an opencast
mine site, in order to access the mineral ore deposit. The directly attributable cost of this activity is capitalised in full within mining
assets under construction, until the point at which the mine is considered to be capable of commercial production. The removal
of waste material after the point at which a mine is capable of commercial production is referred to as production stripping.
When the waste removal activity improves access to ore extracted in the current period, the costs of production stripping are
charged to the income statement as operating costs in accordance with the principles of IAS 2 Inventories.
Where production stripping activity both produces inventory and improves access to ore in future periods the associated costs of
waste removal are allocated between the two elements. The portion which benefits future ore extraction is capitalised within
stripping and development capital expenditure. If the amount to be capitalised cannot be specifically identified, it is determined
based on the volume of waste extracted compared to expected volume for the identified component of the orebody. Components
are specific volumes of a mine’s orebody that are determined by reference to the life-of-mine plan.
In certain instances significant levels of waste removal may occur during the production phase with little or no associated
production. The cost of this waste removal is capitalised in full.
All amounts capitalised in respect of waste removal are depreciated using the units-of-production method based on proved and
probable ore reserves of the component of the orebody to which they relate.
The effects of changes to the life-of-mine plan on the expected cost of waste removal or remaining reserves for a component are
accounted for prospectively as a change in estimate.
14Property, plant and equipment continued
Mining assets continued
Critical accounting estimates and judgements – Gold Mineral Reserves and Resources
Gold mineral reserves and resources are estimates of the amount of ounces that can be economically and legally extracted from
the group’s properties. In order to calculate the gold mineral reserves and resources, estimates and assumptions are required
about a range of geological, technical and economic factors, including quantities, grades, production techniques, recovery rates,
production costs, commodity prices and exchange rates. Estimating the quantities and/or grade of the reserves and resources
requires the size, shape and depth of the orebodies to be determined by analysing geological data such as the logging and
assaying of drill samples. This process may require complex and difficult geological judgements and calculations to interpret the
data.
Because the economic assumptions used to estimate the gold mineral reserves and resources change from year to year, and
because additional geological data is generated during the course of operations, estimates of the mineral reserves and
resources may change from year to year.
Changes in the reserves and resources may affect the group’s financial results and financial position in a number of ways,
including:
▪Asset carrying values may be affected due to changes in estimated cash flows
▪Scrapping of assets to be recorded in the income statement following the derecognition of assets as no future economic
benefit expected
▪Depreciation and amortisation charged in the income statement may change as they are calculated on the units-of-production
method
▪Environmental provisions may change as the timing and/or cost of these activities may be affected by the change in mineral
reserves
▪Useful life and residual values may be affected by the change in mineral reserves.
At the end of each financial year, the estimate of proved and probable gold mineral reserves and resources is updated.
Depreciation of mining assets is prospectively adjusted, based on these changes.
Critical accounting estimates and judgements – production start date
Various relevant criteria are considered in order to assess when the mine is substantially complete and ready for its intended use
and moves into the production phase. Some of the criteria would include but are not limited to the following:
▪The level of capital expenditure compared to the total project cost estimates
▪The ability to produce gold in a saleable form (where more than an insignificant amount of gold has been produced)
▪The ability to sustain the ongoing production of gold.
Critical accounting estimates and judgements – stripping activities
The determination of the volume of waste extracted and the expected volume for the identified component of the orebody is
dependent on an individual mine’s design and life-of-mine plan and therefore changes to the design or life-of-mine plan will result
in changes to these estimates. Identification of the components of a mine’s orebody is made by reference to the life-of-mine
plan. The assessment depends on a range of factors including each mine’s specific operational features and materiality.
Critical accounting estimates and judgements – impairment of assets
The recoverable amount of mining assets is generally determined utilising real discounted future cash flows (post tax). No
material difference in recoverable amounts is expected should real future cash flows be discounted on a pre-tax basis.
Management also considers such factors as the quality of the individual orebody, market risk, asset-specific risks and country
risk in determining the fair value.
Key assumptions for the calculations of the mining assets’ recoverable amounts are the commodity prices, resource values,
market discount rates, costs to sell, exchange rates and the annual life-of-mine plans. In determining the commodity prices and
resource values to be used, management assesses the views of several reputable institutions on commodity prices and based
on this, derives the commodity prices and resource values.
The life-of-mine plans are based on the proved and probable reserves as included in the Reserve Declaration, which are
determined in terms of SAMREC, as well as resources where management has high confidence in the orebody and economical
recovery of gold, based on historic and similar geological experience.
14Property, plant and equipment continued
Mining assets continued
Critical accounting estimates and judgements – impairment of assets continued
During the years under review, the group calculated the recoverable amounts (generally fair value less costs to sell) of CGUs for
which indicators of impairment were identified (refer to note 5). These recoverable amounts are based on updated life-of-mine
plans and the following relevant assumptions:
2025
2024
2023
US$ gold price per ounce
– Year 1
3 105
2 258
1 932
– Year 2
2 892
2 173
1 844
– Year 3
2 604
2 049
1 725
– Long term (Year 4 onwards)
2 237
1 772
1 582
Exchange rate (R/US$)
– Year 1
17.95
18.39
18.28
– Year 2
17.63
17.96
17.44
– Year 3
18.01
18.36
17.13
– Long term (Year 4 onwards)
18.54
18.26
16.22
Rand gold price (R/kg)
– Year 1
1 792 000
1 335 000
1 135 000
– Year 2
1 639 000
1 255 000
1 034 000
– Year 3
1 508 000
1 209 000
950 000
– Long term (Year 4 onwards)
1 334 000
1 040 000
825 000
The following are the attributable gold resource value assumptions:
South Africa
US dollar per ounce
2025
2024
2023
Underground resources
Measured
n/a
16.50
n/a
Indicated
n/a
9.00
n/a
Inferred
n/a
3.60
n/a
The recoverable amount of mining assets is determined utilising real discounted future cash flows. Certain CGUs’ recoverable
amounts included resource multiple valuations in the case of undeveloped properties and certain resource bases. In 2025 and
2023, the CGUs to which the resource bases are attributed to were not tested for impairment, nor were the undeveloped
properties. For the 2024 financial year, the recoverable amounts of Target North and Doornkop's Kimberley reef have been
determined using the resource multiple valuations. Refer to note 5 for more information regarding CGUs tested for impairment.
One of the most significant assumptions that influence the group's operations' life-of-mine plans, and therefore the impairment
assessment, is the expected commodity prices. Management continues to differentiate between short-, medium- and long-term
assumptions used in the models. The long-term price was determined as part of the annual budgeting process and is used as
the cut-off price for calculating Mineral Reserves included in the declaration of Mineral Reserves and Resources in terms of
SAMREC.
The discounted cash flow models include the estimated production cost and carbon tax savings arising from the rollout of
Harmony's renewable energy programme, as part of its greater decarbonisation strategy.
During the current year, post-tax real discount rates ranging between 11.20% (2023: 11.69%) and 12.43% (2023: 13.15%) were
used to determine the recoverable amounts of the CGUs tested. In 2024, the post-tax real discount rates of 10.69% and 12.15%
were used to determine the recoverable amounts for the Doornkop and Target 1 CGUs, respectively. No material difference in
recoverable amounts is expected should future cash flows be discounted on a pre-tax basis. Refer to note 5 for more information
regarding CGUs tested for impairment.
Cash flows used in the impairment calculations are based on life-of-mine plans which exceed five years for the majority of the
mines. Cash flows from potential projects, life-of-mine extensions and residual ounces can also be included in the impairment
assessment where deemed appropriate. An additional risk premium is added to the post-tax real discount rates in these
instances.
Should management’s estimate of the future not reflect actual events, further impairments may be identified.
14Property, plant and equipment continued
Mining assets continued
Critical accounting estimates and judgements – impairment of assets continued
Factors affecting the estimates may include:
▪Changes to proved and probable ore reserves
▪Economical recovery of resources
▪The grade of the ore reserves may vary significantly from time to time
▪Review of strategy
▪Unforeseen operational issues at the mines
▪Differences between actual commodity prices and commodity price assumptions
▪Changes in the discount rate and foreign exchange rates
▪Changes in capital, operating mining, processing and reclamation costs
▪Mines' ability to convert resources into reserves
▪Potential production stoppages for indefinite periods
▪The implementation of Harmony’s renewable energy programme
▪Carbon tax.
Sensitivity analysis – impairment of assets
Commodity prices
One of the most significant assumptions that influence the LOM plans and therefore impairment assessments is the expected
commodity prices. Management determined a 10.8% decrease (2024: 11.9%) and 29.1% increase (2024: 11.9% ) in gold price
assumptions as reasonably possible changes. In 2025, management determined a reasonably possible change in gold prices
based on determining reasonably possible adjusted long-term US$ gold price assumptions using the standard deviation of
market analysts' forecasted long-term US$ gold price assumptions. These reasonably possible adjusted long-term US$ gold
price forecasts was then compared to Harmony's long-term US$ gold price assumption. In 2024, management determined a
reasonably possible change in gold price assumptions based on the standard deviation of market analysts' forecasted long-term
gold price assumptions.
The 29.1% increase in the gold price assumptions would have resulted in no impairments being recorded. A 10.8% decrease in
the gold price assumptions (with all other variables held constant and not taking any actions, such as stopping capital projects,
into account) would have resulted in the following post-tax impairments being recorded as at 30 June 2025:
SA Rand
Figures in million
2025
2024
10.8% decrease (2024: 11.9% decrease)
Target 1
558
450
Tshepong South
741
n/a
Doornkop
n/a
2 623
Target North
n/a
2 898
29.1% increase (2024: 11.9% increase )
Target North
n/a
2 688
Production profile
In addition to the expected commodity prices in 2025, the production profiles of Target 1 and Tshepong South have also been
assessed as sensitive assumptions that influences the LOM plans, and therefore the impairment assessments of these CGUs.
For Target 1, the recoverable amount was determined as R4 212 million as at 30 June 2025. Management determined that
should the production profile of Target 1 decrease by 8.6% (with all other variables held constant), this would result in the
recoverable amount being equal to the post-tax carrying amount of R2 065 million as at 30 June 2025.
For Tshepong South, the recoverable amount was determined as R3 314 million as at 30 June 2025. Management determined
that should the production profile of Tshepong South decrease by 5.3% (with all other variables held constant), this would result
in the recoverable amount being equal to the post-tax carrying amount of R2 343 million as at 30 June 2025.
The production profiles of the other CGUs tested for impairment are not considered to be sensitive assumptions. This is based
on the fact that a 15.0% decrease in these production profiles (with all other variables held constant) would not result in any
impairments being recognised.
14Property, plant and equipment continued
Mining assets continued
The movement in the mining assets is as follows:
SA Rand
Figures in million
2025
2024
Cost
Balance at beginning of year
79 099
76 774
Fully depreciated assets no longer in use derecognised (a)
(487)
(586)
Additions (b)
6 595
5 426
Scrapping of assets (c)
(532)
(622)
Adjustment to rehabilitation asset (d)
519
(531)
Transfers and other movements (e)
4 181
749
Translation
(1 829)
(2 111)
Balance at end of year
87 546
79 099
Accumulated depreciation and impairments
Balance at beginning of year
50 215
48 156
Fully depreciated assets no longer in use derecognised (a)
(487)
(586)
Scrapping of assets (c)
(362)
(525)
Depreciation
4 759
4 546
Translation
(1 207)
(1 376)
Balance at end of year
52 918
50 215
Net carrying value
34 628
28 884
(a)The 2025 figure primarily relates to fully depreciated assets derecognised at Hidden Valley, and right-of-use assets at
various operations. The 2024 figure primarily relates to fully depreciated assets derecognised at the Hidden Valley,
Tshepong North, Moab Khotsong and Doornkop operations.
(b)Included in additions for 2025 is an amount of R64 million (2024: R84 million) for capitalised depreciation associated with
stripping activities at the Hidden Valley operations.
(c)Refer to note 8 for the total loss on scrapping recognised. Both the 2024 and 2025 amounts primarily relates to the
Tshepong North and Kusasalethu operations.
(d)Refer to note 24 for details on the adjustment to the rehabilitation asset.
(e)During the 2025 year an amount of R1 108 million (2024: R761 million) was transferred to mining assets at Hidden Valley.
This related to ongoing mining development costs. During the 2025 year the Doornkop 207 Level and Kareerand Tailings
Storage Facility projects were completed and amounts of R643 million and R1 661 million, respectively, were transferred
to mining assets.
Stripping activities
Included in the balance for mining assets is an amount of R886 million (2024: R829 million) relating to Kalgold and R2 369
million (2024: R3 028 million) relating to Hidden Valley. Depreciation of R58 million (2024: R130 million) and R1 055 million
(2024: R823 million) was recorded for Kalgold and Hidden Valley respectively.
Mining assets under construction
Accounting policy
At the group’s surface mines, when it has been determined that a mineral property can be economically developed as a result of
establishing proved and probable reserves, costs incurred to develop the property are capitalised as incurred until the mine is
considered to have moved into the production phase. These costs include costs to further delineate the orebody and remove
overburden to initially expose the orebody.
At the group’s underground mines, all costs incurred to develop the property, including costs to access specific ore blocks or
other areas of the underground mine, are capitalised to the extent that such costs will provide future economic benefits. These
costs include the cost of shaft sinking and access, the costs of building access ways, lateral development, drift development,
ramps, box cuts and other infrastructure development.
Where a depreciable asset is used in the construction or extension of a mine, the depreciation is capitalised against the mine’s
cost.
Mineral interests associated with development and exploration phase mineral interests are not amortised until such time as the
underlying property is converted to the production stage.
Capitalisation of pre-production costs ceases when commercial levels of production are reached. Commercial levels of
production are discussed under “production start date” above.
The movement in the mining assets under construction is as follows:
SA Rand
Figures in million
2025
2024
Cost
Balance at beginning of year
8 172
5 721
Additions (a)
5 434
3 247
Finance costs capitalised (b)
148
237
Transfers and other movements
(4 131)
(770)
Translation
(242)
(263)
Balance at end of year
9 381
8 172
Accumulated impairments
Balance at beginning of year
670
670
Translation
(1)
—
Balance at end of year
669
670
Net carrying value
8 712
7 502
(a) The additions for 2025 mainly relates to:
SA Rand
Figures in million
2025
2024
Hidden Valley
1 215
865
Zaaiplaats (Moab Khotsong)
962
794
Doornkop 207 Level1
—
197
Doornkop 212 Level
303
54
Mponeng LOM Extension Project
890
16
Eva Copper Project2
807
—
Sungazer 2 Project (Moab Khotsong)3
1 004
—
Kareerand Tailings Storage Facility (Mine Waste Solutions)1
203
960
1 Project completed during 2025 and transferred to mining assets
2 See discussion on developments on the project below
3 Construction of the 100MW solar photovoltaic plant commenced during 2025
(b)Refer to note 10 for further detail on the capitalisation rate applied.
14Property, plant and equipment continued
Mining assets  under construction continued
Eva Copper developments
During the 2025 year, significant progress was made on the Eva Copper Project final feasibility study, mineral resource
development and early works execution. The feasibility study is in its final phase, with front end engineering and design
progressing in parallel. The costs capitalised for the advanced early works construction for the 2025 year amounted to
R747 million.
In recognition of its significance, Eva Copper was declared a Prescribed Project by the Queensland Government in March 2024.
The application to amend the Project’s existing Environmental Authority and align the project’s approvals with the outcomes of
the final feasibility study has been accepted and is under active assessment by the Queensland Department of the Environment,
Tourism, Science and Innovation.
Progress continues to be made on preliminary site works, supported by a conditional grant from the Queensland Government to
fund preparatory activities for the project. During February 2025, the board approved advanced early work construction for the
project, including front end engineering and design activities and early-phase bulk earthworks. These expenditures have been
capitalised as future economic benefits are expected given the advanced stage of the final feasibility study and the ongoing
permitting process, which is being supported by the relevant authorities.
Upon completion of the final feasibility study, Harmony’s board will consider a final investment decision. 
Wafi-Golpu development
Capitalisation of certain project expenses on Wafi-Golpu was halted from 1 July 2019 following delays in the permitting of the
project (refer to note 20). All ongoing expenses since were for holding purposes and did not result in future economic benefits.
These have been included in exploration expenditure in the income statement and amounted to R23 million (2024: R37 million)
for the year.
Undeveloped properties
Accounting policy
Undeveloped properties are initially recognised at cost, which is generally based on the fair value of resources obtained through
acquisitions. The carrying values of these properties are tested for impairment or reversal of previously recognised impairment
when an indicator is identified. Once development commences, these properties are transferred to mining assets and accounted
for in accordance with the related accounting policy.
Critical accounting estimates and judgements – exploration and evaluation assets
The recoverability of exploration and evaluation assets is assessed when indicators for impairment or reversal of previously
recognised impairment has been identified. The balances assessed include undeveloped properties and assets under
construction. Significant judgement is required as to whether an area of activity is to be carried forward on the balance sheet, or
written off through the identification of areas of activity which have not yet reached a stage that permits a reasonable
assessment of the existence of economically recoverable reserves, where there is no continuing significant activity plan in
relation to the area.
The movement in the undeveloped properties is as follows:
SA Rand
Figures in million
2025
2024
Cost
Balance at beginning of year
8 743
8 861
Transfers and other movements
—
9
Translation
(135)
(127)
Balance at end of year
8 608
8 743
Accumulated depreciation and impairments
Balance at beginning of year
4 268
1 476
Impairment1
—
2 793
Translation
(1)
(1)
Balance at end of year
4 267
4 268
Net carrying value
4 341
4 475
1Relates to Target North. Refer to note 5 for details.
Currently the assets classified as undeveloped properties are the Wafi-Golpu Project, Target North and the Eva Copper Project.
For further details regarding the permitting process and other developments of the Wafi-Golpu Project, refer to note 20. For
further details regarding the Eva Copper Project, please refer to the mining assets under construction section above. No further
developments have occurred post the impairment in the 2024 year for Target North.
14Property, plant and equipment continued
Undeveloped properties continued
The carrying value of the undeveloped properties are as follows:
SA Rand
Figures in million
2025
2024
Target North
888
888
Wafi-Golpu Project
336
349
Eva Copper Project
3 117
3 238
Total undeveloped properties
4 341
4 475
Other non-mining assets
Accounting policy
Land is shown at cost and not depreciated. Other non-mining fixed assets are shown at cost less accumulated depreciation and
accumulated impairment losses. Other non-mining fixed assets are depreciated on a straight-line basis over their estimated
useful lives as follows:
▪Vehicles at 20% per year
▪Computer equipment at 33.3% per year.
The assets’ residual values and useful lives are reviewed, and adjusted if appropriate, at each balance sheet date.
The movement in the non-mining assets is as follows:
SA Rand
Figures in million
2025
2024
Cost
Balance at beginning of year
1 116
1 000
Transfers and other movements
(32)
—
Fully depreciated assets no longer in use derecognised
(1)
—
Additions
204
117
Translation
(1)
(1)
Balance at end of year
1 286
1 116
Accumulated depreciation and impairments
Balance at beginning of year
629
547
Fully depreciated assets no longer in use derecognised
(1)
—
Depreciation
71
82
Translation
(1)
—
Balance at end of year
698
629
Net carrying value
588
487