Borrowings |
12 Months Ended | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jun. 30, 2025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Financial Instruments [Abstract] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Borrowings | Borrowings
(a)This facility can only be drawn down for qualifying projects. (b)The interest rates of these facilities is expected to be impacted by the South African IBOR reform, where JIBAR is planned to be discontinued and replaced with the South African Rand Overnight Index Average (ZARONIA). The transition to ZARONIA is expected to be finalised by the end of 2026. As these facilities’ agreements makes provision for the use of replacement benchmarks for determining interest rates, the impact of the IBOR reform is expected to be immaterial. (c)Initially ten equal bi-annual instalments starting from June 2024, with the final instalment on maturity. Due to the delay in the project process, and the resultant impact on the drawdowns, the lenders have agreed to amend the repayments to nine equal bi-annual instalments starting from November 2024. The period of the draw down has lapsed, therefore the balance of the facility is no longer available. (d)On 26 June 2025, a bridge facility agreement between Harmony, Harmony Australia and a syndicate of lenders was concluded. The purpose of the agreement is to secure funding to finance the acquisition of MAC Copper and related costs (refer to note 13 for further information). Under the agreement, a US$250 million facility (Facility A) and a US$1 billion facility (Facility B) were made available to Harmony Australia and Harmony, respectively. The facility is undrawn as at 30 June 2025 and has a tenure of 364 days with a six-month extension option. Origination fees of R197 million were incurred for the facility. These fees are regarded as an integral part of the effective interest rate of the facility. As no drawdown on the bridge facility has taken place as at 30 June 2025, though still being regarded as probable in the future, these origination fees have been deferred and will be treated as a transaction cost when draw down of the facility takes place. Borrowings continuedDebt covenants The debt covenant tests for both the Rand and US dollar facilities are as follows: ▪The group's interest cover ratio shall be more than five times (EBITDA1/ Total interest paid) ▪Leverage2 shall not be more than 2.5 times. 1Earnings before interest, taxes, depreciation and amortisation (EBITDA), as defined in the agreement excludes extraordinary items such as impairment, restructuring cost and gains/losses on disposal of fixed assets. 2Leverage is defined as total net debt to EBITDA. Debt covenants tests were performed for the loan facilities for the 2025 and 2024 financial years and no breaches were noted. For the 2025 financial year, the group's interest cover ratio was 97.3 times (2024: 44.1 times), while the group's leverage was negative 0.4 (2024: 0.2). Management believes that it is very likely that the covenant requirements will be met in the foreseeable future given the current earnings and interest levels. Interest-bearing borrowings
30Borrowings continued Interest-bearing borrowings continued
(a) The amount for 2025 relates to the US$1.25 billion bridge facility. The amount for 2024 related to the green loan. At the end of November 2024, a portion of the green loan was drawn down and the remainder expired.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||