Exhibit 99.58

 

FORM 51-102F3
MATERIAL CHANGE REPORT

 

Item 1: Name and Address of Company
   

F3 Uranium Corp. (the “Company”)
750-1620 Dickson Avenue
Kelowna, British Columbia
Canada, V1Y 9Y2

 

Item 2: Date of Material Change
   

April 15, 2025

 

Item 3: News Release
   

A news release announcing the material change was issued on April 15, 2025 through Globe Newswire and a copy was subsequently filed on SEDAR+.

 

Item 4: Summary of Material Change
   

On April 15, 2025, the Company announced a new discovery with drillhole PLN25-205 which intersected radioactivity over a total of 33.0m including 0.56m of high radioactivity (>10,000 cps) with a peak of 37,700 cps at 398.34m. The drillhole is still currently in progress, however additional mineralization is not expected.

 

Item 5.1: Full Description of Material Change
   

On April 15, 2025, the Company announced a new discovery with drillhole PLN25-205 which intersected radioactivity over a total of 33.0m including 0.56m of high radioactivity (>10,000 cps) with a peak of 37,700 cps at 398.34m. The drillhole is still currently in progress, however additional mineralization is not expected.

 

2025 Handheld Spectrometer Highlights:

 

Broach Lake: PW Area
PLN25-205 (line 11310S):

 

●0.5m interval with radioactivity of 340 cps between 340.0 and 340.5m, and

 

●0.5m interval with radioactivity of 440 cps between 347.5 and 348.0m, and

 

●0.5m interval with radioactivity of 370 cps between 366.0 and 366.5m, and

 

●8.0m interval with radioactivity peaking 2,500 cps between 373.0m and 381.0m, and

 

●23.5m interval with radioactivity peaking 37,700 cps between 384.0m and 407.5m, including

 

●0.56m composite mineralization >10,000 cps between 389.75m and 398.56m

 

 

Table 1. Drill Hole Summary and Handheld Spectrometer Results

 

Collar Information *Planned Collar, azi/dip. Final surveys outstanding * Hand-held Spectrometer Results
On Mineralized Drillcore (>300
cps / >0.5m minimum)
Athabasca
Unconformity
Depth (m)
Total
Drillhole
Depth
(m)
 
Hole ID Section Line Easting Northing Elevation Az Dip From
(m)
To
(m)
Interval
(m)
Max
CPS
 
PLN25-203   lost in overburden            
PLN25-203A   lost in overburden            
PLN25-203B 11340S 589233 6397845 586 48 -63 160.00 160.50 0.50 420 160.7 722  
PLN25-204 11295S 589389 6398003 583 47 -63 168.50 168.90 0.40 310 168.88 401  
PLN25-205* 11310S 589326 6397940 586 46 -65 340.00 340.50 0.50 340 168.8 TBD  
 
347.50 348.00 0.50 440      
366.00 366.50 0.50 370  
373.00 373.50 0.50 470  
373.50 374.00 0.50 370  
374.00 374.50 0.50 <300  
374.50 375.00 0.50 540  
375.00 377.00 2.00 <300  
377.00 377.50 0.50 510  
377.50 378.00 0.50 780  
378.00 378.50 0.50 2100  
378.50 379.00 0.50 2500  
379.00 379.50 0.50 660  
379.50 380.00 0.50 2400  
380.00 380.50 0.50 1400  
380.50 381.00 0.50 2100  
384.00 384.50 0.50 800  
384.50 385.00 0.50 770  
385.00 386.50 1.50 <300  
386.50 387.00 0.50 1900  
387.00 387.50 0.50 3100  
387.50 388.00 0.50 2800  
388.00 388.50 0.50 1600  

 

 

Collar Information *Planned Collar, azi/dip. Final surveys outstanding * Hand-held Spectrometer Results
On Mineralized Drillcore (>300
cps / >0.5m minimum)
Athabasca
Unconformity
Depth (m)
Total
Drillhole
Depth
(m)
Hole ID Section Line Easting Northing Elevation Az Dip From
(m)
To
(m)
Interval
(m)
Max
CPS
              388.50 389.00 0.50 340    
              389.00 389.50 0.50 990    
              389.50 389.75 0.25 9300    
              389.75 390.00 0.25 27200    
              390.00 390.50 0.50 1700    
              390.50 391.00 0.50 480    
              391.00 391.50 0.50 900    
              391.50 392.00 0.50 670    
              392.00 392.50 0.50 1300    
              392.50 393.00 0.50 4400    
              393.00 393.50 0.50 590    
              393.50 394.00 0.50 380    
              394.00 394.50 0.50 640    
              394.50 395.00 0.50 420    
              395.00 395.50 0.50 420    
              395.50 396.00 0.50 640    
              396.00 396.50 0.50 1400    
              396.50 397.00 0.50 940    
              397.00 397.50 0.50 <300    
              397.50 398.00 0.50 300    
              398.00 398.34 0.34 9800    
              398.34 398.50 0.16 37700    
              398.50 398.65 0.15 10400    
              398.65 399.00 0.35 8900    
              399.00 399.50 0.50 4600    
              399.50 400.00 0.50 760    
              400.00 400.50 0.50 330    
              400.50 401.00 0.50 360    
              401.00 401.50 0.50 910    
              401.50 402.00 0.50 1900    
              402.00 402.50 0.50 3400    

 

 

Collar Information *Planned Collar, azi/dip. Final surveys outstanding * Hand-held Spectrometer Results
On Mineralized Drillcore (>300
cps / >0.5m minimum)
Athabasca
Unconformity
Depth (m)
Total
Drillhole
Depth
(m)
Hole ID Section Line Easting Northing Elevation Az Dip From
(m)
To
(m)
Interval
(m)
Max
CPS
              402.50 403.00 0.50 1900    
403.00 403.50 0.50 1300
403.50 404.00 0.50 360
404.00 404.50 0.50 6200
404.50 405.00 0.50 700
405.00 405.50 0.50 4900
405.50 406.00 0.50 2200
406.00 406.50 0.50 2300
406.50 407.00 0.50 1200
407.00 407.50 0.50 430

 

Handheld spectrometer composite parameters:

 

1:Minimum Thickness of 0.5m

 

2:CPS Cut-Off of 300 counts per second

 

3:Maximum Internal Dilution of 2.0m

 

The natural gamma radiation detected in the drill core, as detailed in the news release, was measured in counts per second (cps) using a handheld Radiation Solutions RS-125 spectrometer which has been calibrated by Radiation Solutions Inc. The Company designates readings exceeding 300 cps on the handheld spectrometer (occasionally referred to as a scintillometer in industry parlance; this colloquial usage stems from historical naming conventions and the shared functionality of detecting gamma radiation a scintillometer)—as “anomalous”, readings above 10,000 cps as “highly radioactive”, and readings surpassing 65,535 cps as “off-scale”. However, readers are cautioned that spectrometer or scintillometer measurements often do not directly or consistently correlate with the uranium grades of the rock samples and should be regarded solely as a preliminary indicator of the presence of radioactive materials.

 

Samples from the drill core are split into half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK while the other half remains on site for reference. Analysis includes a 63 element suite including boron by ICP-OES, uranium by ICP-MS and gold analysis by ICP-OES and/or AAS.

 

The Company considers uranium mineralization with assay results of greater than 1.0 weight % U3O8 as “high grade” and results greater than 20.0 weight % U3O8 as “ultra-high grade”.

 

All depth measurements reported are down-hole and true thicknesses are yet to be determined.

 

Item 5.2: Disclosure of Restructuring Transactions
   

Not applicable.

 

 

Item 6: Reliance on subsection 7.1(2) of National Instrument 51-102
   

Not applicable.

 

Item 7: Omitted Information
   

Not applicable.

 

Item 8: Executive Officer
   

The following senior officer of the Company is knowledgeable about the material change and this report:

 

Raymond Ashley, P.Geo., President & COO
Email: ir@f3uranium.com
Phone: 778-484-8030

 

Item 9: Date of Report
   

April 25, 2025

 

 

Cautionary Note Regarding Forward-Looking Statements

 

This material change report contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the properties, are “forward-looking statements.” These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this material change report are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.