Exhibit 99.43

 

REPORT NI 43-101

 

TECHNICAL REPORT ON THE

 

MINERAL RESOURCES OF THE

 

SULITJELMA PROJECT, NORWAY

 

Prepared for

 

Blue Moon Metals Inc.

 

by

 

Qualified Person:

Adam Wheeler, B.Sc, M.Sc, C. Eng., Eur Ing, FIMMM.

 

  Effective Date of Resources: 20th February 2025
  Effective Date of Report: 20th May 2025 (as amended and restated on September 12, 2025)

 

Adam Wheeler,

Mining Consultant, C. Eng, Eur Ing, FIMMM,

Cambrose Farm,

Redruth,

Cornwall, TR16 4HT,

England.

 

 September 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 2

 

QUALIFIED PERSONS CERTIFICATE

Certificate Of Author

Adam Wheeler, Mining Consultant,

Cambrose Farm, Redruth, Cornwall, TR16 4HT, England.

Tel/Fax: (44) 1209-899042; E-mail: adamwheeler@btinternet.com

 

As the author of this “Technical Report on the Mineral Resources of the Sulitjelma Project, Norway”, I, A. Wheeler do hereby certify that:

 

1.I am an independent mining consultant, based at Cambrose Farm, Redruth, Cornwall, TR16 4HT, England.

 

2.I hold the following academic qualifications:

 

B.Sc. (Mining) Camborne School of Mines 1981
M.Sc. (Mining Engineering) Queen’s University (Canada) 1982

 

3.I am a registered Chartered Engineer (C. Eng and Eur. Ing) with the Engineering Council (UK). Reg. no. 371572.

 

4.I am a professional fellow (FIMMM) in good standing of the Institute of Materials, Minerals and Mining.

 

5.I have worked as a mining consultant in the minerals industry for over 40 years. I have worked on over 50 different projects involving geological modelling, exploration drillhole layout or resource estimation. These projects have covered 35 different countries, and 25 of them have involved me as an QP for either 43-101 or JORC reports. Twenty of these projects were related to copper. I have been working on the Sulitjelma project since 2021, involved with geological modelling and mineral resource estimation.

 

6.I have read NI 43-101 and the technical report, which is the subject of this certificate, has been prepared in compliance with NI 43-101. By reason of my education, experience and professional registration, I fulfil the requirements of a “qualified person” as defined by NI 43-101. My work experience includes 5 years at an underground gold mine, 7 years as a mining engineer in the development and application of mining and geological software, and 30 years as an independent mining consultant, involved with geological modelling, exploration drill hole layout, mineral resource and reserve estimation, evaluation and planning projects for both open pit and underground mining projects.

 

7.I am responsible for the preparation of the technical report titled “Technical Report on the Mineral Resources of the Sulitjelma Project, Norway”, and dated May 20th, 2025 (as amended and restated on September 12th, 2025). I visited the project property on 2/12/2024.

 

8.As of the date hereof, to the best of my knowledge, information and belief, the technical report, which is the subject of this certificate, contains all scientific and technical information that is required to be disclosed to make such a technical report not misleading.

 

9.I am independent of Blue Moon Metals Inc, pursuant to section 1.5 of NI 43-101.

 

10.I have read the National Instrument and Form 43-101F1 (the “Form”) and the Technical Report has been prepared in compliance with NI 43-101 and the Form.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 3

 

DATE AND SIGNATURES PAGE

 

Herewith, my report entitled “Technical Report on the Mineral Resources of the Sulitjelma Project, Norway”, dated May 20th, 2025 (as amended and restated on September 12, 2025).

 

(signed and sealed) “Adam Wheeler”    
   
A. Wheeler,  C.Eng., Eur. Ing., FIMMM   Dated the 12th of September 2025

  

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 4

 

TABLE OF CONTENTS

 

    Page
QUALIFIED PERSONS CERTIFICATE 2
1 SUMMARY 9
1.1 Overview 9
1.2 Ownership 9
1.3 Geology and Mineralisation 9
1.4 Database and Resource Estimation 10
1.5 Exploration Status 11
1.6 Mineral Resource Estimation 11
1.7 Results and Interpretations 13
1.8 Conclusions 13
1.9 Recommendations 14
1.9.1 Sample Preparation, Analyses, and Security 14
1.9.2 Data Verification 14
1.9.3 Exploration Program and Budget 15
2 INTRODUCTION 16
2.1 Author 16
2.2 Terms of Reference 16
2.3 Units and Currency 17
3 RELIANCE ON OTHER EXPERTS 17
4 PROPERTY DESCRIPTION AND LOCATION 17
4.1 Location 17
4.2 Licenses 19
4.3 Fees and Royalties 23
4.4 Environmental Liabilities 23
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 24
5.1 Accessibility 24
5.2 Site Description 24
5.3 Climate 27
5.4 Local Resources 27
5.5 Infrastructure 27
5.6 Power Supply 28
5.7 Water Supply 28
6 HISTORY 30
6.1 Mining History 30
6.2 Exploration 31
6.3 Recent Project Developments 33
7 GEOLOGICAL SETTING AND MINERALISATION 34
7.1 Regional Geology 34
7.2 Local Geology 36
7.3 Mineralisation 38
8 DEPOSIT TYPE 40
9 EXPLORATION 41
10 DRILLING 41
11 SAMPLE PREPARATION, ANALYSIS AND SECURITY 53
11.1 Observations 53
11.2 Overview 55
12 DATA VERIFICATION 56
12.1 Site Visit 56
12.2 Drill hole Core 59
12.3 Collar Data 62
12.4 Database 63
12.5 Drill Hole Data 63
12.6 Density 66
12.7 Overview 66
13 MINERAL PROCESSING AND METALLURGICAL TESTING 67

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 5

 

14 MINERAL RESOURCE ESTIMATE 70
14.1 Data Collation 70
14.2 Interpretation 72
14.3 Exploratory Data Analysis 77
14.4 Compositing 80
14.5 Geostatistics 81
14.7 Volumetric Modelling 84
14.8 Grade Estimation 86
14.9 Resource Classification 88
14.10 Model Validation 89
14.10.1 Cross-Sections 89
14.10.2 Global Comparison of Grades 89
14.10.3 Local Comparison of Grades 89
14.11 Resource Evaluation 91
15 MINERAL RESERVE ESTIMATES 95
16 MINING METHODS 95
17 RECOVERY METHODS 95
18 PROJECT INFRASTRUCTURE 95
19 MARKET STUDIES AND CONTRACTS 95
20 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL IMPACT 95
21 CAPITAL AND OPERATING COSTS 95
22 ECONOMIC ANALYSIS 95
23 ADJACENT PROPERTIES 96
24 OTHER RELEVANT INFORMATION 98
25 INTERPRETATION AND CONCLUSIONS 98
25.1 Risks and Uncertainties 98
25.1.1 Drill holes 98
25.1.2 Density Measurements 98
25.1.3 Historic QA/QC Procedures 98
25.1.4 Mined-Out Areas 99
25.2 Results and Interpretations 99
25.3 Conclusions 100
26 RECOMMENDATIONS 101
26.1 Sample Preparation, Analyses, and Security 101
26.2 Data Verification 101
26.3 Exploration Program and Budget 102
27 REFERENCES 103

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 6

 

LIST OF TABLES

 

  Page
   
Table 1-1. Sulitjelma Deposit Resource Estimation Summary 12
Table 1-2. Proposed Budget 15
Table 4-1. Summary of License Areas 19
Table 6-1. Sulitjelma Mine Production Summary 31
Table 6-4. Summary of Drake Exploration Sample Results 31
Table 10-1. Sulitjelma Drilling Summary 41
Table 10-2. Summary of Core Diameters 41
Table 10-3. Drill Hole Collars – Rupsi-Dypet (1 of 2) 43
Table 10-4. Drill Hole Collars – Rupsi-Dypet (2 of 2) 44
Table 10-5. Drill Hole Collars – Hankabakken II (1 of 2) 45
Table 10-6. Drill Hole Collars – Hankabakken II (2 of 2) 46
Table 10-7. Drill Hole Collars – Sagmo 47
Table 10-8. Drill Hole Intersections – Rupsi-Dypet 48
Table 10-9. Drill Hole Intersections – Hankabakken II (1of 2) 49
Table 10-10. Drill Hole Intersections – Hankabakken II (2of 2) 50
Table 10-11. Drill Hole Intersections – Sagmo 51
Table 11-1. Summary of Limits of Detection 54
Table 12-1. Summary of Check Density Measurements 66
Table 13-1. Summary of 1984 Mill Production 67
Table 14-1. Summary of Drill hole Database 70
Table 14-2. Statistical Summaries – Interpreted Samples 77
Table 14-3. Top-Cut Levels 80
Table 14-4. Zone Orientations 80
Table 14-5. Compositing Parameters 80
Table 14-6. Statistical Summary– RD Composites 82
Table 14-7. Statistical Summary– H2 Composites 82
Table 14-8. Statistical Summary– SM Composites 82
Table 14-9. Summary of Model Prototypes 84
Table 14-10. Grade Estimation Parameters 86
Table 14-11. Global Comparison of Average Grades 89
Table 14-12. MSO Parameters 91
Table 14-13. Cut-Off Grade and Cu_Eq Parameters 92
Table 14-14. Grade-Tonnage Table – RD Region, Inferred Resources Only 93
Table 14-15. Grade-Tonnage Table – H2 Region, Inferred Resources Only 93
Table 14-16. Grade-Tonnage Table – SM Region, Inferred Resources Only 94
Table 14-17. Grade-Tonnage Table – RD, H2 and SM Regions, Inferred Resources Only 94
Table 14-18.Constrained Mineral Resource Estimate Statement 100
Table 26-1. Proposed Budget 102

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 7

 

LIST OF FIGURES

 

  Page
   
Figure 4-1. Overall Map of Sulitjelma Location 18
Figure 4-2. Northern Norway Map of Sulitjelma Location 18
Figure 4-3. Plan of License Areas - Overall 20
Figure 4-4. Plan of License Areas – North 21
Figure 4-5. Plan of License Areas – South 22
Figure 5-1. Plan of Local Sulitjelma Area 26
Figure 5-2. Plan of Sulitjelma and Old Mine Workings 26
Figure 5-3. Plan of Sandnes Water Supply 28
Figure 5-4. Plan of Hydroelectric Power Plants in Sulitjelma Area 29
Figure 5-5. Plan of Power Lines and Transformers in Sulitjelma Area 29
Figure 6-1. Plan of VTEM Survey Extents – Drake Exploration 2014 32
Figure 6-2. Main Areas in Project Development 33
Figure 7-1. Simplified Map of Scandinavian Caledonides 34
Figure 7-2. Outline Geological Map Scandinavian Caledonides 35
Figure 7-3. Profile Between Bodø and Sulitjelma 35
Figure 7-4. Stratigraphy of Sulitjelma Ophiolite Complex – Pre-Folding/Faulting 36
Figure 7-5. Simplified Geology Plan of Sulitjelma Area 37
Figure 7-6. Profile of Sulitjelma Fold Nappe 37
Figure 7-7. Stratigraphic Column of Sulitjelma in Northern Mineralisation Area 38
Figure 7-8. S-N Profile Across Langvann Antiform 38
Figure 7-9. Example of Folding in Giken II Mineralisation 39
Figure 10-1. Overall Plan of Drill Holes 51
Figure 10-2. Drillholes’ Section – Rupsi Dypet 52
Figure 10-3. Drill Holes’ Section -Hankabakken II 52
Figure 10-4. Drill Holes’ Section – Sagmo 52
Figure 11-1. Histogram of Drilling Sample Lengths 53
Figure 11-2. Photo of NGU Core Storage Facility – Lokken 54
Figure 12-1. Pictures – Underground at Rupsi 57
Figure 12-2. Surface Infrastructure - Former Processing Facilities 57
Figure 12-3. Looking Westwards from Giken Mine 58
Figure 12-4. Looking Southward towards Former Sagmo Mine Area 58
Figure 12-5. Hole RUP-168 60
Figure 12-6. Hole RUP-136 61
Figure 12-7. Hole RUP-137 61
Figure 12-8. Histogram of Check Collar Elevation Differences – Rupsi and Sagmo 62
Figure 12-9. Plan of Underground Drill holes vs Historical Map - Rupsi 64
Figure 12-10. Plan of Underground Drill holes vs Historical Map - Sagmo 64
Figure 12-11. Plan of Underground Drill holes vs Historical Map - Hankabakken 64
Figure 12-12. Historic Profile 65
Figure 12-13. Profile 6 with Imported Data 65
Figure 13-1. Photograph of As-Received Sample- for SGS Flotation Testing 68
Figure 13-2. Test Flotation Flowsheet 69
Figure 14-1. 3D View of All Drill holes, Looking North-West 70
Figure 14-2. Plan Plot of Drill holes 70
Figure 14-3. 3D View of RD Drill holes – Looking North-West 71
Figure 14-4. 3D View of H2 Drill holes – Looking North-West 71

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 8

 

Figure 14-5. 3D View of SM Drill holes – Looking North-West 71
Figure 14-6. RD – Plan of Interpreted Veins 73
Figure 14-7. 3D View of RD Interpreted Veins, Looking South-West 73
Figure 14-8. Overall S-N Section Through RD Region 74
Figure 14-9. S-N Section Through RD Mineralised Zones 74
Figure 14-10. Plan of H2 Interpreted Zones 75
Figure 14-11. 3D View of H2 Interpreted Zones, Looking South-West 75
Figure 14-12. Plan of SM Interpreted Zones 76
Figure 14-13. WE Long-Section of SM Interpreted Zones 76
Figure 14-14. Log-Probability Plots of Cu Samples Within Interpreted Zones 78
Figure 14-15. Log-Probability Plots of Zn Samples Within Interpreted Zones 78
Figure 14-16. Point Plots of Cu vs Zn Grades 78
Figure 14-17. Histograms of Vein True Thickness Values 79
Figure 14-18. Sample Length Histograms by Zone 79
Figure 14-19. Log-Probability Plots for Composites - Cu 81
Figure 14-20. Log-Probability Plots for Composites – Zn 81
Figure 14-21. RD – Cu Experimental Isotropic Variograms 83
Figure 14-22. H2 - Cu Experimental Isotropic Variograms 83
Figure 14-23. Plan of Model Prototypes 85
Figure 14-24. Example Cross-Section – RD 86
Figure 14-25. Example Cross-Section – H2 87
Figure 14-26. Example Cross-Section – SM 87
Figure 14-27. Swath Plots – Cu 90
Figure 23-1. Plan of Sulis Green Future License Areas 96
Figure 23-2. Plan of VMS Exploration License Areas 97

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 9

 

1SUMMARY

 

1.1Overview

 

Mr. Adam Wheeler, (C. Eng, Eur Ing.) was retained by Blue Moon Metals Inc. (“Blue Moon”), a TSX Venture Exchange listed (TSX-V.: MOON) company focused on the exploration and development of deposits in Norway and the USA, to prepare an independent Technical Report on the mineral resources of the Sulitjelma Project located in Nordland County, northern Norway. Sulitjelma Project is a former producer and a potential underground copper mining project. This Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101). The Author has visited the Project on December 2nd, 2024. He also visited the central Norwegian core facility at the Norwegian Geological Survey (NGU), Lokken, on December 3rd, 2024, to inspect drill hole core from Sulitjelma.

 

The overall Sulitjelma Projects was former underground mining operations, occurring from 1891 – 1991. The mineral resource estimate described in this report reflects all the drilling data currently available. It should be noted that there are several different orebodies on the Sulitjelma Project, with one overall region measuring approximately 7km by 2km, and another smaller region about 3km away, measuring approximately 2km by 1km. The mineral resource estimation described here has focused on four deposit regions.

 

Resource estimation work was done using the Datamine mining software system, Studio RM, Version 2.1.125.0.

 

1.2Ownership

 

Nye Sulitjelma Gruver (“NSG”) has 14 extraction licences and 16 exploration licences covering the Sulitjelma deposit areas within the Nordland district. Part of the Sagmo area is inside the Junkerdal National Park. Otherwise, there are no protected areas for the other parts of the deposit.

 

Blue Moon acquired 100% of the issued and outstanding shares of NSG pursuant to a share purchase agreement dated December 19, 2024. As consideration, Blue Moon issued 56,079,997 common shares of Blue Moon to former NSG shareholders, who will also receive US$3M in cash milestone payments related to permitting for tailings discharge followed by receipt of the operating permit for the Sulitjelma Project.

 

1.3Geology and Mineralisation

 

The volcanogenic massive sulphide (“VMS”) sulphide deposits at Sulitjelma Project are situated at the contact between submarine basalts and overlying sediments and they are interpreted to have been formed by volcanic-associated hydrothermal sedimentary exhalative processes on the Ordovician seafloor within a fault-controlled basin and are classified as being of Cyprus type VMS deposit.

 

Each deposit has a well-developed subjacent zone of hydrothermal alteration, the core of which appears abnormally enriched in potassium relative to the surrounding strata. Distinct mineralization facies are recognised as products of primary hydrothermal alteration, regional amphibolite-grade metamorphism and accompanying tectonic deformation. The widespread brecciation associated with the mineralised zones can partly explained by tectonism, but it may also be evidence of a cyclic catastrophic stage, during the evolution of the enclosing basalts.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 10

 

The overall district hosting the Sulitjelma Project is about 100 km2 in size, containing about 25 individual deposits. The VMS deposits are tabular and elongated, reaching 1,200 m in length and 300 m in width, typically dipping between 10 degrees and 45 degrees. The high-grade parts of the deposits that were mined historically rarely exceeded 5 m in thickness and typically averaged 2 m.

 

The mineralised zones typically consist of massive pyrite, pyrrhotite, chalcopyrite and sphalerite. Mineralisation can also be semi-massive, brecciated as well as disseminated. Well-known in the Sulitjelma Project area are large, rounded pyrite crystals, within a matrix of chalcopyrite, sphalerite and pyrrhotite.

 

Historically, the bulk of the material extracted at Sulitjelma Project was in what is known as the Northern Ore Field located north of Lake Langvann. The current resource estimation includes the Rupsi/Dypet and Hankabakken deposits, which are part of this Northern Ore Field. The other zone being evaluated in the current study is the Sagmo deposit, which is in the Southern Ore Field, south of Lake Langvann.

 

1.4Database and Resource Estimation

 

In 2021, Norwegian geologists started to compile all available drill hole information and its related data, into Excel spreadsheets. The compiled information was transferred to Datamine, as separate .csv files for collar coordinates, drill hole survey data, assay results and lithology logs. After import of these data sets into Datamine, the different assay, collars and survey data files were combined into individual single files for each zone for work in 3D.

 

For the Sulitjelma Project, complete sets of data from 601 diamond drill holes have been collated, covering 78,144 m. Of these, 286 diamond drill holes have intersected mineralisation for the three regions which have been evaluated in the current study. 51 of these holes were drilled from surface, with the other 235 holes being drilled from underground.

 

The drilling data was then used to develop a sectional interpretation of mineralised intersections, based on lithology as well as a cut-off of broadly 0.3% CuEq. The interpreted zones have been extrapolated a maximum distance of approximately 100 m beyond the furthest intersection, both laterally and down-dip, from the outer-most drill hole intersections. The drilling grid spacing used was generally 200 to 250 m, so the extrapolation distance is generally half of the typical grid spacing.

 

Three separate block models were developed, for the Rupsi/Dypet, Hankabakken and Sagmo deposits. For each deposit, the same modelling methodology was applied. A digital terrain model (DTM) was generated, based on the centre points on each drill hole intersection. Approximate apparent thickness values were then estimated and used to develop a three-dimensional block model of each zone. Composite grades for copper and zinc were then estimated, based on inverse-distance weighting (squared). The previously exploited areas were allocated as mined by using perimeters from historical mine plans. These mined-out areas are therefore excluded from the current mineral resource estimation in this report.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 11

 

1.5Exploration Status

 

The Sulitjelma Project is at development stage, and Blue Moon is evaluating a restart of operations of this historical producer. Historical diamond drilling was carried out between 1945 and 1988, during which operators completed 816 core drill holes for a total of 137,700 m. Other exploration work in the Sulitjelma Project area has included ground and airborne geophysical studies, geological mapping, outcrop and mine dump grab sampling, and regional lithogeochemical rock sampling for rocktype fingerprinting. In addition to the 25 deposits that have been identified, there are several mineralized occurrences both around the deposits and regionally that are either untested or only supported by limited drilling. This means that additional infill and exploration drilling is warranted to more fully test favourable stratigraphy both around the deposits and regionally.

 

Blue Moon has not yet done any active exploration work, including drilling, on the Sulitjelma Project since acquiring the property but is developing plans to do so.

 

The current exploration plan is to extend the existing Rupsi tunnel by approximately 1 km. From this new development access underground, a diamond drilling program of 10,000 m is planned. The new drilling data is expected to greatly assist with further geological and geotechnical modelling.

 

1.6Mineral Resource Estimation

 

This Mineral Resource Estimation (“MRE”) work was carried out and prepared in compliance with Canadian National Instrument 43-101, and the mineral resources in this estimate were calculated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council May 10th, 2014.

 

Conforming with guidelines for “reasonable prospects for eventual economic extraction”, constrained evaluations were completed using a Mineable Shape Optimiser (MSO) to generate wireframes.

 

This mineral resource estimate of the Sulitjelma deposit is summarised in Table 1-1, related to a cut-off grade of 0.6% CuEq and a minimum thickness of 2.2 m.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 12

 

Table 1-1. Sulitjelma Deposit Resource Estimation Summary

Effective Date: 20th February 2025

 

  Inferred Resources
Deposit Tonnes Cu Zn Cu_Eq
  Kt % % % 
Rupsi 7,874 1.18 0.33 1.23
Dypet 1,384 1.23 0.20 1.27
Hankabakken II 4,955 0.88 0.06 0.89
Sagmo 2,853 0.98 0.16 1.00
Total 17,066 1.06 0.21 1.10

 

Notes:

 

1.CIM definitions were followed for MRE.
2.All resources reported are categorised Inferred; there are no Measured or Indicated resources.
3.A minimum mining thickness of 2.2 m was applied in making the MRE constraint wireframes.
4.The MRE constraint wireframes were generated using a preliminary MSO, based on a cut-off grade of 0.6% Cu_Eq, related to potential underground mining.
5.Assumed parameters for the cut-off grade and Cu-equivalent (Cu_Eq) calculations included:
Prices: USD4.20/lb Cu, USD1.25/lb Zn
Processing recoveries: 92% Cu, 57% Zn
Payabilities: 96.5% Cu, 86% Zn
6.For the cut-off grade calculation, the assumed total operating cost was $50/t of ore.
7.A global density value of 3 t/m3 was assumed.
8.Rounding may result in apparent summation differences between tonnes, grades and metal content; not considered material.
9.Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 13

 

1.7Results and Interpretations

 

There are several opportunities to improve the current results presented in this report, which should be investigated further as part of the ongoing development of the Sulitjelma Project. Most of the deposits evaluated in this mineral resource estimation have some parts that are densely sampled, notably in areas in or close to the old underground workings. Going down-dip, the drill hole spacings are generally much wider, with more reliance on much longer underground drill holes, often with very poor intersection angles, or on relatively few surface drill holes.

 

Further drilling campaigns would therefore have a significant effect on the development of the project, in terms of:

 

·The use of twin drill holes to help verify all or part of the historical drilling data.

·Potentially increase Inferred category material through additional drilling both down-dip and along-strike.

·Decreasing drill spacing would greatly help in the estimation of Indicated category material. To achieve Indicated resource categorisation using any of the historical drill hole data, the results from twin drilling would have to help verify the use of all or part of the historical drill hole database.

 

1.8Conclusions

 

The updated mineral resource estimate as of February 20th, 2025, has these conclusions from the Author, which are as follows:

 

·The Sulitjelma mine processed approximately 26 Mt of ore over just under 100 years of production, with average grades of 1.80% Cu and 0.82% Zn. Approximately 10 Mt of ore were produced from zones nearby to the zones which have been evaluated in the current study.

·The geological setting and character of the VMS mineralization identified to date on the Sulitjelma Project are of sufficient enough to justify additional exploration expenditures.

·Most drill holes in the current database are related to the mineral resources at Sulitjelma Project in the four deposits, totalling 601 core drill holes for 78,144 metres. There is no core on site, but at the NGU core inventory at Lokken, approximately 19,330m Sulitjelma core are stored, from 469 holes that were drilled in and around the Sulitjelma zones being considered in this study.

·Drilling has identified extensive, conformable, metasediments and metavolcanics with quite distinct mineralized zones, that remain open with respect to further exploration, and which in some areas have been mined extensively in the past.

·The drilling related to the zones being currently evaluated took place between 1952 and 1988, while the mine was in production. There is very little information available about the drilling, sampling, sample preparation and analysis procedures. Similarly, there is almost no QAQC data available.

·Very little data is available for rock density measurements.

·Due to the proximity of the underground workings and the geometry of the deposit, many of the underground drill hole intersection angles are very poor, which complicates geological modelling.

·Because of these factors, the author has assigned all of the current resource estimation to the Inferred category.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 14

 

1.9Recommendations

 

1.9.1Sample Preparation, Analyses, and Security

 

·QAQC Program. A rigorous quality control and quality assurance (“QAQC”) policy needs to be developed for standards, blanks and duplicate samples, for all on-going drilling and sampling work. This QAQC program will also need to use certified reference material (“CRM”) samples with similar lithologies and Cu/Zn grades to Sulitjelma Project.

·Core Shack. A secure premises will be required for core logging and storage of drill core, as well as all returned pulp and reject material from the analytical laboratory.

·Density Measurement equipment and procedures need to be set-up for any new drilling as well as check density measurements of historical core at Lokken.

 

1.9.2Data Verification

 

·Relogging of Drill Core. A relogging program should be completed of Sulitjelma Project historical drill core stored at Lokken. This work would be more extensive than any previous relogging exercise; noting that relogging will be difficult, as much of the core is extremely dirty. If possible, some check sampling should also be completed while relogging is ongoing, although in most cases there is little, or no drill core left in the core boxes from the originally sampled intersections. As well, additional sampling of previously unsampled drill core should be done, noting that at current cut-off levels for the mineral resource estimate, there are potentially extended or new mineralised intersections that could warrant follow-up.

·Drilling Database. The current database needs to be enhanced so that YEAR identification data is recorded for each drill hole. This is very important, as in on-going verification and estimation work, it may be necessary to filter the historic data with relation to the date of age of the data available.

·Twin Drilling. A twin drilling program should be completed during the next work program, to help verify all or part of the historical drilling data for each deposit. NSG have already planned the extension of an existing underground adit, the Rupsi tunnel, for the purpose of providing drilling access. A suggested starting proportion of twinning could be 5%, with respect to historic drill holes for each deposit. When the assay results are returned from the laboratory and analysed, it can be determined if and where further twin drilling would be required.

·Drill Hole Collars. During summer, historic surface drill hole collars should be found and resurveyed, where possible. Depending on the extent of underground access, the location and resurveying of underground drill hole collars should also be attempted.

·Mined-Out Extents. Depending on underground access, surveys should be made of mined-out areas adjacent to the evaluated resources. Modern equipment, including the use of drones, could help with this check survey process.

·Metallurgical Program. A full metallurgical audit should be undertaken regarding the production recoveries and any reports on file. Once there is new material available from drilling that is representative of the deposits, a new metallurgical program should be planned to encompass flotation test work, variability analysis, and lock cycle testing to ensure process design in the plant is setup for maximizing metal recovery.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 15

 

1.9.3Exploration Program and Budget

 

For further development of the project, the Author recommends implementation of an exploration program. This work covers extension of the existing Rupsi tunnel by 1 km, in order to allow access, and then using of this new tunnel access to complete approximately 10,000 m of diamond drilling from underground. The intent of the drilling is to enable potentially increasing confidence in the resources in the Rupsi deposit, with upgrading of some material from an Inferred category to an Indicated category.

 

A summary breakdown of this work program is presented below, along with associated estimated costs expected to total approximately 4.6 M USD (Table 1-2).

 

 

Table 1-2. Proposed Budget  
Work Planned Cost
  M USD
Extension of Rupsi Tunnel (1 km) 3.4
Diamond drilling (~10,000 m) 1.2
Total 4.6

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 16

 

2INTRODUCTION

 

2.1Author

 

This report was prepared by qualified person (QP) Adam Wheeler (C. Eng, Eur Ing, Fellow, Institute of Materials, Minerals and Mining) – herein referred to as the Author. He is an independent mining consultant, who was contracted to present an updated mineral resource estimate that has an effective date of February 20th, 2025. The Author ’s involvement with Sulitjelma started in 2021. A summary of the Author’s site visit and personal inspections is shown below:

 

2nd December 2024 (1 Day). Inspection of underground workings and surface infrastructure. 3rd December 2024 (1 Day). Inspection of drill core at the NGU facilities in Løkken, on

 

2.2Terms of Reference

 

This independent Technical Report was commissioned by the Issuer, Blue Moon Metals Inc., in connection with its acquisition of Nye Sulitjelma Gruver AS (NSG), and completed by the Author, an independent mining consultant. Blue Moon, Nussir ASA (“Nussir”) and NSG announced that they have entered into separate share purchase agreements on December 19, 2024, pursuant to which Blue Moon agreed to acquire all of the issued and outstanding common shares of Nussir and NSG. Both Nussir and NSG are private Norwegian companies with properties in northern Norway. Upon closing, Blue Moon acquired a 93.55% interest in Nussir for US$51.7M and a 100% interest in NSG for US$12M, both of which were satisfied in common shares of Blue Moon (the “Blue Moon Shares”) at a deemed price of C$0.30 per Blue Moon Share. Former NSG shareholders will also receive US$3M in cash milestone payments (the “Cash Milestone Payments”) related to permitting for tailings discharge followed by receipt of the operating permit for the Sulitjelma Project. For additional details, please refer to Blue Moon’s news releases dated November 27, 2024, December 19, 2024 and February 27, 2025 (available on Blue Moon’s profile in SEDAR+ at www.sedarplus.ca).

 

The Author was previously retained by NSG to provide initial resource estimations during 2021 and 2022. The mineral resource estimate presented herein has used block models generated from these periods, but with the evaluation updated to provide results according to 43-101 guidelines.

 

The Author has subsequently been retained by Blue Moon to provide an independent Technical Report on the Mineral Resource estimate for the Sulitjelma Project that meets the provisions of CIM - Standards of Disclosure for Mineral Projects. The purpose of this current report is to provide an independent Technical Report in conformance with the standards required by NI 43-101 and Form 43-101F1. The estimate of mineral resources contained in this report conforms to the CIM Mineral Resource and Mineral Reserve definitions (May 2014) referred to in NI 43-101.

 

Based on the Property visits and review of the available literature and data, the Author takes responsibility for the information herein.

 

This Report is a compilation of proprietary and publicly available information. In support of the technical sections of this Report, the Author has independently reviewed reports, data, and information derived from work compiled by NSG as well as relevant geological publications, as listed in Section 27. These were used to verify background geological information regarding the regional and local geological setting and mineral deposit potential of the Property. The Author has deemed these reports, data, and information to be valid contributions, to the best of his knowledge. In addition to the site visit, Adam Wheeler reviewed available literature and documented results concerning the project and held discussions with technical personnel of Blue Moon.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 17

 

2.3Units and Currency

 

All measurement units used in this report are metric, and currency is expressed in US Dollars, unless stated otherwise. A conversion rate of 10.45 Norwegian NOK to 1 USD has been used.

 

3RELIANCE ON OTHER EXPERTS

 

3.1Ownership

 

The Author has worked on the Sulitjelma project since 2021 and is familiar with the relevant license areas. The Author has directly accessed the on-line Norwegian mapping archive system Kartverket, which shows the extent and identification of mineral licenses throughout Norway. The Author has also cross-checked the online information with data sent to him from NSG contained in a third-party legal opinion from Simonsen Vogtwiig written by Mona Soyland, dated February 25th, 2025, which was e-mailed to the Author. This comparison has confirmed the Author’s view with respect to the validity of the mineral title for tenure for Sulitjelma project, noting that the Author is not qualified to express a legal opinion in respect to property titles, current ownership, and other related legal matters, associated with the Sulitjelma project. It is further described in Section 4.2 of this report.

 

3.2Taxes

 

The Author has relied on Blue Moon for guidance on applicable taxes, royalties, and other government levies or interests, applicable to revenue or income from the Project. This information was provided by an internal document on January 22nd, 2025, from Blue Moon’s legal advisors, Simonsen Vogtwiig, written by Mona Soyland. The Author is not qualified to express an opinion regarding taxation in respect to the Sulitjelma project. This information has been further described in Section 4.3 of this report. However, as this report is focussed on the mineral resource estimate only, with no economic analysis, this tax information does not affect the mineral resource estimation results but have been presented to give a full disclosure of these economic parameters.

 

4PROPERTY DESCRIPTION AND LOCATION

 

4.1Location

 

The Sulitjelma Project is located in Northern Norway, at Latitude 67o 8’ 11’’ and Longitude 16o 4’ 30’’. It is approximately 74 km due east of the city of Bodø on the west coast of Norway and it is approximately 14 km west of the border between Norway and Sweden. Sulitjelma Project is approximately 31 km east of the portal town of Fauske, and approximately 31 km to the south-east of the Straumen container port.

 

The position of Sulitjelma Project is shown in Figure 4-1 and Figure 4-2.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 18

 

Figure 4-1. Overall Map of Sulitjelma Location

 

Figure 4-2. Northern Norway Map of Sulitjelma Location

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 19

 

4.2Licenses

 

The main license areas held by NSG are shown in Figure 4-2 and they are summarised in Table 4-1. All the deposits in the current study are covered either by the Mining Rights or Exploration Rights licenses referenced herein; noting that all the licenses listed in Table 4-1 relate to minerals that contain copper, zinc, gold or silver. The licenses are all registered within the Fauske Kommune, in the county of Nordland. The Project covers approximately 4,980 hectares in total, of which 624 hectares are covered by NSG’s Mining Rights.

 

NSG does not currently own any property or land. However, they have an option to buy the old mine buildings and its associated land from the local community.

 

The company VMS Exploration have Exploration Rights licenses that overlap the NSG’s licenses, but they do not have any Mining Rights licenses in the Sulitjelma area.

 

 

Table 4-1. Summary of License Areas

 

Name License Code Type of rights Holder Expiration Date Area m2
Hankabakken 1 0009-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 203,000
Hankabakken 2 0010-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 146,596
Hankabakken 3 0011-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 111,264
Hankabakken 4 0012-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 71,890
Hankabakken 5 0013-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 500,000
Giken/Charlotta 1 0014-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 1,000,000
Giken/Charlotta 2 0015-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 500,000
Rupsi 0016-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 1,000,000
Sagmo 1 0017-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 140,012
Sagmo 2 0018-1/2012 Mining rights Sulitjelma Mineral AS 2028-12-31 448,000
Diamanten A 0016-1/2015 Mining rights Sulitjelma Mineral AS 2029-12-31 1,000,000
Sagmo 3 0009/2023 Mining rights Nye Sulitjelma Gruver AS 2033-12-31 900,000
Sagmo 4 0010/2023 Mining rights Nye Sulitjelma Gruver AS 2033-12-31 10,000
Sagmo 5 0011/2023 Mining rights Nye Sulitjelma Gruver AS 2033-12-31 210,000
Sagmo 1 0125/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 3,000,000
Sagmo 2 0126/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 357,056
Sagmo 3 0127/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 868,000
Sagmo 5 0129/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 91,000
Sagmo 7 0131/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 10,000,000
Avilon 1 0124/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 6,000,000
Sulitjelma 1 0132/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 3,000,000
Sulitjelma 10 0133/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 5,000,000
Sulitjelma 2 0134/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 1,000,000
Sulitjelma 3 0135/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 5,000,000
Sulitjelma 4 0136/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 500,000
Sulitjelma 5 0137/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 2,000,000
Sulitjelma 6 0138/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 1,000,000
Sulitjelma 7 0139/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 217,250
Sulitjelma 8 0140/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 4,000,000
Sulitjelma 9 0141/2022 Exploration rights Nye Sulitjelma Gruver AS 2029-12-31 1,750,000

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 20

 

Figure 4-3. Plan of License Areas - Overall

[Source: Norwegian Directorate of Mining]

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 21

 

Figure 4-4. Plan of License Areas – North

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 22

 

Figure 4-5. Plan of License Areas – South

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 23

 

4.3Fees and Royalties

 

Under the Norwegian Minerals Act, metals with a specific gravity of 5 g/cm³ or higher, including copper and zinc, are classified as state-owned minerals. These metals, which are of primary economic interest at Sulitjelma Project, require compensation to the state through payment of yearly fees to uphold the extraction and exploration permits. The fees are calculated based on the size of the areas in question and must be paid within 15th January each year.

 

Further, all extraction of state-owned minerals requires payment of an annual fee of 0.5% of the sales value of the extracted minerals to the landowner. In addition, an increased landowner fee of 0.5% is mandated for projects in Nordland County.

 

Blue Moon must pay a fee equivalent to 0.75% of the sales value of extracted minerals. The basis for calculating the fee will in general be the extractor's sales revenue (excluding VAT) from the sale of extracted quantities and quantities that potentially have sales value, but which the extractor processes on their own or otherwise utilizes without making a sale. The annual fee will be due for payment by March 31 of the following year.

 

4.4Environmental Liabilities

 

The Sulitjelma project currently has no environmental liabilities, since any impact from historical mining operations rest with the Norwegian Government.

 

A permit for restart of initial mining activities must be acquired to conduct the exploration work described in Section 26.3. This permit has been applied for and the status of this application is expected during 2025. Apart from this, the Author is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform work on the property.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 24

 

 

5ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

 

5.1 Accessibility

 

There is an International Airport in Bodø on the west coast, with national and international flights daily. Bodø is 91 km by road to Sulitjelma. The European Highway E6 goes through the Municipal Center of Fauske. From here the regional #630 road goes eastward to Sulitjelma (38 km). This road is built for transport and is of a high standard and asphalted.

 

Established container port of Straumen can accommodate large ships and has weekly port calls. Straumen is a 54 km drive from Sulitjelma. The port in Fauske can be used for larger ships.

 

Fauske and Straumen are both ice-free during winter, making sea transport of supplies and export of concentrate directly to and from the site possible year-round.

 

5.2 Site Description

 

Sulitjelma is an old mining village, in Fauske Municipality in Nordland County, Norway. It is situated in a lush inland valley at an elevation of 140 metres (460 ft) above sea level. Most of the existing residences as well as the old mine infrastructure is located on the north and eastern banks Langvatnet lake. The lakes Lomivatnet, Kjelvatnet and Muorkkejávrre are located to the east and south of the village.

 

The 0.53-square-kilometre (130-acre) village of Sulitjelma has a population (2023) of 399.

 

Sulitjelma is virtually surrounded by mountains and glaciers. Sulitjelma is at the southern terminus of the Nordkalottruta hiking trail. There is a road connection to the town of Fauske, which is located approximately 31 km to the west. Winters in Sulitjelma have reliable snow cover that are on average 2 °C colder than in the town of Fauske. Sulitjelma Church and Sulitjelma Chapel are both located in the village. There are many historical mines in the area.

 

Most of the entrances to the historical mining areas are from horizontal adits heading north off the northern bank of Langvann lake. There are also the historical Sagmo mine workings approximately 2 km south of the lake. Plans of local Sulitjelma area, relative to the historical mine workings and old plant infrastructure, are shown in Figure 5-1 and Figure 5-2. The topography rises at about 10 degrees on the south side of the lake, and at about 27 degrees on the north side.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 26

 

Figure 5-1. Plan of Local Sulitjelma Area

 

 

Figure 5-2. Plan of Sulitjelma and Old Mine Workings

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 27

 

5.3Climate

 

Sulitjelma Project is located inside the Arctic Circle and has 24-hours of daylight from early May to the beginning of August with midnight sun between the beginning of June to the second week of July. The area has polar night for part of December because it has sunrise at 11 am and sunset before noon each day.

 

Average 24-hour temperatures at Sulitjelma Project range from -5o C in February to approximately from 12o C in July. Moderate summer temperatures normally last from May to September. Daytime temperatures are usually significantly warmer than the 24-hr average from March to September, while there is very little diurnal temperature variation from November to early February, as the sun is very low or below the horizon most of the day.

 

Precipitation is heaviest from September to March, often as snow, typically over 130 mm a day in this period. The average annual precipitation is approximately 1 m.

 

The Project is operable year-round.

 

5.4Local Resources

 

There is a small local tourist industry in Sulitjelma, with a mining museum and trips along one of the remaining mine tunnels. Sulitjelma is at the southern terminus of the Nordkalottruta hiking trail. There is production of sapphire glass at the industrial area in Sandnes, near to the old processing plant.

 

The Langvann lake is a potential location for future tailings placement.

 

The town of Fauske, 31 km to the west, has a population of approximately 10,000 and it has many different types of manufacturing companies.

 

5.5Infrastructure

 

There is paved road access all the way to Sulitjelma. There are still many buildings and infrastructure on site, from the former mining operations, that could be useful for any restart of mining operations. NSG have the exclusive right to buy the former process plant at a very low price. Along with the permit for restart of mining operations (which has been applied for) this will give NSG sufficient surface rights for mining and processing operations, as well as access to water, power and potential waste and tailings disposal areas.

 

Outotec completed a historical Preliminary Feasibility Study on Sulitjelma in 2013. This included cost estimation of developing a new plant. Outotec visited the site twice during this period, and concluded that the old process buildings remain in relatively good condition, and a new processing plant could be developed using existing conveyor tunnels and premises with only minor adjustments, such as drilling holes and grouting.

 

For mobile telecommunications there is a 5G network widely available in the Mine area and Fauske.

 

There is a local hospital in Fauske (31 km east of Sulitjelma) and a regional hospital in Bodø (74 km due east of Sulitjelma).

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 28

 

The main industries in Fauske include tourism, energy, marble and dolomite quarries. The main industries in Bodø include energy, construction and aviation.

 

5.6Power Supply

 

High voltage power lines are available on site, supplied by multiple hydroelectric power stations in the area. A plan of the local hydroelectric power stations is shown in Figure 5-4. A plan of the power lines and transformers is shown in Figure 5-5. The approximately W-E lines are 110-170 kV, and the approximately north-south lines are 32 – 66 kV.

 

In Sulitjelma, 1,072 GWh is produced annually (average production) from 5 power plants, all owned by Salten Kraftsamband (SKS). Most of the power is surplus power that is exported from Sulitjelma. Local distribution takes place via a transformer station close to the old flotation building at the Sandnes industrial area. From here, the power is distributed internally into Sulitjelma mainly through 5 kV overhead lines..

 

5.7Water Supply

 

There are existing facilities for process water and potable water at site. The process water comes from the outlet water from hydropower and could be used as a supply for a processing plant. The local water supply at Sandnes, in and around the old processing plant area, is shown in Figure 5-3.

 

Figure 5-3. Plan of Sandnes Water Supply

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 29

 

Figure 5-4. Plan of Hydroelectric Power Plants in Sulitjelma Area

 

 

Figure 5-5. Plan of Power Lines and Transformers in Sulitjelma Area

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 30

 

6HISTORY

 

6.1Mining History

 

There have been historical mineral resources and mineral reserves that led to historical production at the Sulitjelma Project. Blue Moon is not treating any historical estimates as current mineral reserves or mineral resources.

 

The Author of this report has not done sufficient work to classify any historical estimate associated with the Sulitjelma Project, as either current mineral reserves or mineral resources. If the Author has referred to any historical estimates, the reader is cautioned not to treat them, or any part of them, as current. The historical production summarized below are included simply to provide the reader with a complete history of the Sulitjelma Project, which has been producing and selling metal into the marketplace since 1896 (see Table 6-1). The Author of this report has reviewed the information in this section, as well as that within the cited references, and the Author has determined that it is suitable for disclosure.

 

All stakeholders are cautioned that none are considered current and therefore should not rely on them due to being superseded by the mineral resource estimate of this report.

 

Copper has been mined in Norway for several hundred years, noting the first documented copper mine being the Verlohme Sohn Mine in Kongsberg 1490.

 

The first deposit discovered in Sulitjelma Project area was found by a Lapp, Mons Petter, in 1858. The Swedish consul Nils Persson was granted a mining lease in 1886, and after initial investigations and preliminary mining in1887, he established a mining company in 1891, the Sulitjelma Aktiebolag. The mines in the Sulitjelma Project area became the largest mining enterprise in Norway of the 20th century, with an estimate of 75,000-man years of labour. The largest number of employees was reached in 1913, amounting to 1,750. The company was reorganized in 1933, under the name of A/S Sulitjelma Gruber, and from 1937 the major shareholders were Norwegians. In 1931, a 50-year mining licence was established. In 1965, Elkem bought up to 90% ownership. In 1983, the Elkem decided that they did not want to continue mining due to low copper prices (below NOK 10/kg) and a lack of mining investment. Copper smelting ceased in 1987, which was followed by cessation of mining operations on June 28,1991. Over the production history, the mines of Sulitjelma Project produced copper, zinc and sulphur, mining 26 Mt of ore, with average grades of 1.8% Cu, 0.82% Zn and 20% S.

 

The copper concentrates and blister copper produced at the site might also yield some future potential benefits with respect to gold and silver. It appears that there has been no follow-up metallurgical work undertaken since this finding to further the understanding of both gold and silver in the VMS deposits that compose the Sulitjelma Project.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 31

 

Table 6-1. Sulitjelma Mine Production Summary    

 

        Grades Content  
                    Production
Mine Unit Start Stop Tonnes Cu Zn S Cu Zn S Rate
  Year Year Mt % % % Kt Kt Kt Ktpa
Jakobsbakken 1896 1968 4.47 1.55 2.42 31.0 69 108 1,385 62
Mons Petter 1887 1912 0.04 2.78 - 28.6 1 - 11 2
Giken 1 1892 1973 3.19 2.50 0.76 23.8 80 24 760 39
Mons Petter 2 1975 1986 2.02 1.75 0.49 21.1 35 10 426 184
Anna 1908 1923 0.03 3.86 - 20.4 1 - 6 2
Ny-Sulitjelma 1893 1965 2.59 1.99 0.55 20.2 51 14 522 36
Sagmo 1906 1987 1.94 1.70 0.42 19.8 33 8 385 24
Charlotta 1 1894 1971 1.15 2.31 0.60 19.0 27 7 219 15
Holmsen/Gudrun 1912 1961 0.71 1.49 0.55 18.4 11 4 130 14
Furuhaugen 1896 1921 0.37 1.65 - 17.5 6 - 65 15
Giken 2 1961 1991 3.29 1.81 0.45 16.2 60 15 533 110
Sture 1904 1959 0.25 1.66 0.53 16.2 4 1 40 5
Charlotta 2 1961 1990 1.83 1.79 0.49 15.9 33 9 291 63
Hankabakken 1 1901 1981 1.29 1.44 0.41 15.1 19 5 195 16
Helsingborg 1908 1909 0.00 1.54 - 14.4 0.02 - 0.14 1
Palmberg 1 1917 1943 0.04 1.10 0.50 13.4 0.47 0.22 6 2
Hankabakken 2 1963 1988 0.89 1.22 0.24 12.3 11 2 109 36
Bursi 1902 1981 1.96 1.49 0.31 12.1 29 6 237 25
Total 1887 1991 26.06 1.80 0.82 20.4 470 214 5,320 251

 

6.2Exploration

 

An Australian exploration company, Drake Resources, conducted exploration activities in the Sulitjelma Project area between 2014 and 2015. Initial work involved a 2014 airborne geophysical (“VTEM”) survey, which enabled identification of priority copper/zinc targets. The priority targets were then groomed through ground-based electromagnetic (EM) geophysics survey, as well as taking samples from outcrops as well as from an individual mine dump, as summarised in Table 6-2. These geophysics survey limits are shown in Figure 6-1.

 

Table 6-2. Summary of Drake Exploration Sample Results

 

Sample Sample Type Weight Easting Northing Cu Zn Pb Ag
Number   Kg     % % % ppm
SJV0010 Outcrop grab 0.84 540,871 7,448,410 0.84 0.03 0 2
SJV0011 Outcrop grab 0.67 556,221 7,443,696 0.77 0.32 0 1
SJV0012 Outcrop grab 1.18 556,201 7,443,694 0.32 0.10 0 1
SJV0013 Mine dump grab 0.76 545,121 7,448,850 0.89 1.68 0.01 7
SJV0014 Mine dump grab 1.05 543,440 7,442,355 0.34 0.02 0.67 45
SJV0015 Mine dump grab 1.72 543,440 7,442,355 0.17 0.06 3.77 224
SJV0016 Mine dump grab 2.11 543,440 7,442,355 0.20 0.02 >10.00 645
SJV0017 Mine dump grab 1.29 543,440 7,442,355 1.61 0.82 2.46 104
SJV0018 Mine dump grab 1.3 549,493 7,447,319 4.40 1.19 0.05 24
SJV0019 Mine dump grab 1.52 549,493 7,447,319 1.95 1.66 0.08 21

 

In 2014, exploration work was also carried out in the Diamanten area, which is approximately 10km south of the Sagmo deposit, as also shown in Figure 6-1. 10 samples were taken from 3 drill holes, with one sample assaying 4.7% Cu. The Diamanten area is untouched by mining, and it is within one of NSG’s mining licenses.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 32

 

Figure 6-1. Plan of VTEM Survey Extents – Drake Exploration 2014

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 33

 

6.3Recent Project Developments

 

The company Nye Sulitjelma Gruver (“NSG”) was established in 2011. The mining rights for the Nordgruvefeltet and Sagmo areas were secured by NSG in 2012.

 

A regulation plan was developed for the area in 2016, with a focus on impact assessment, which was approved by the Fauske municipality. In 2020, an application was made for a permit for a restart of initial mining activities in accordance with the Pollution Act and sent to the Norwegian Environment Agency. The status of this application is expected this year. Further project developments are summarised below:

 

2020 - Start of current mineral resource estimation project work.
   
2021 - Start of planning for initial mining area and waste rock deposition.
  - Acquisition of Sulitjelma Mineral (the previous owners) by NSG.
  - NSG categorised as “pilot project” in Nordland County.
   
2022 - More detailed planning of Rupsi tunnel and exploration drilling.
  - Request made for potential electric power demand of 10MW capacity.
   
2023 - Application to Directorate for Minerals for extension of Rupsi tunnel. NSG have received basic agreement and are expecting formal declaration.
   
2024 - Detailed Zoning Plan made for Rupsi and Avilon. Avilon is 300 m away for waste deposition. The focus of this zoning plan includes the areas shown in Figure 6-2.

 

Figure 6-2. Main Areas in Project Development

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 34

 

7GEOLOGICAL SETTING AND MINERALISATION

 

7.1Regional Geology

 

The stratigraphic sequence, which contains many Scandinavian pyritic deposits, lies in the middle and upper Köli nappes of the upper allochthon, part of the Caledonide orogen, a belt of lower Paleozoic rocks extending some 2,000 km along the western margin of the Scandinavian peninsula. The geographic location of Sulitjelma and its position within the Caledonides is shown in Figure 7-1.

 

The Sulitjelma region is underlain by a granitic gneiss basement of Precambrian age, which is exposed in several tectonic windows. This basement is a continuation of the Precambrian of the adjoining Baltic Shield. The Caledonian rocks above this basement are relatively thin and have been divided into several structural units, separated by early thrusts and affected by later metamorphism and folding.

 

Figure 7-1. Simplified Map of Scandinavian Caledonides

 

 

In the Sulitjelma region two nappe units have been distinguished (Figure 7-2 and Figure 7-3), of which the upper one, a varied series of metasediments, is termed the Sulitjelma Schist Sequence. The lower unit consists of amphibolites above calcareous schists and phyllites.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 35

 

Figure 7-2. Outline Geological Map Scandinavian Caledonides

[Compiled by Nicholson (1969), 66oN to 68oN]

 

 

Figure 7-3. Profile Between Bodø and Sulitjelma

[ Compiled by Nicholson (1969), Ref A-A’ from Figure 7-2]

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 36

 

7.2Local Geology

 

A plan of the surface geology for the Sulitjelma Project area is shown in Figure 7-5. The Furulund Group and the Sulitjelma amphibolites contain the volcanogenic massive sulphide (“VMS”) mineralisation. The lithology of Furulund Group consists of calcareous phyllites and schists, very well-banded and in parts rich in garnet and hornblende. The group includes basic intrusions, which are now metadolerites with coarse-grained interiors and highly deformed margins.

 

The Sulitjelma Project area deposits are located at the junction of a dominantly basaltic sequence, the Otervatn Volcanic Formation, with the overlying thick sedimentary unit: the Furulund Group. This basaltic segment forms the extrusive portion of the Sulitjelma Ophiolite Complex (Boyle, 1989) shown in Figure 7-4. The Sulitjelma Gabbro Complex and the sheeted Mietjerpakte Intrusive Complex have been interpreted by Boyle (1980) as the intrusive and hypabyssal portions. The stratigraphic and igneous relations of the rocks of the area have been reviewed and a model for the emplacement of the Sulitjelma fold nappe presented by Boyle (1987). Geochemical studies by Boyle (1982, 1989) and Cook (1987) have been interpreted to show that the Sulitjelma Ophiolite Complex represents a fragment of ensialic marginal basin which closed and was obducted during the Scandian orogenic phase and emplaced as a large-scale fold nappe (Figure 7-6).

 

The stratigraphy of the Sulitjelma Project area has undergone amphibolite-grade metamorphism. Polyphase penetrative deformation of the sequence has resulted in widespread stratigraphic inversion. This has led the actual stratigraphy shown in Figure 7-7, as well as the relative positions of mineralised zones shown in the section in Figure 7-6. The plan locations of the main deposits are shown in Figure 7-5.

 

Figure 7-4. Stratigraphy of Sulitjelma Ophiolite Complex – Pre-Folding/Faulting

[After] Boyle (1987)]

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 37

 

Figure 7-5. Simplified Geology Plan of Sulitjelma Area

[After Cook et al 1990]

 

 

Figure 7-6. Profile of Sulitjelma Fold Nappe

[After Boyle, 1987]

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 38

 

Figure 7-7. Stratigraphic Column of Sulitjelma in Northern Mineralisation Area

 

 

Figure 7-8. S-N Profile Across Langvann Antiform

 

 

7.3Mineralisation

 

The deposits are interpreted as being originally formed at a single stratigraphic interval on the Ordovician seafloor (Cook et al, 1990), which fits the VMS genetic model. Each deposit has a well-developed subjacent zone of hydrothermal alteration, in which the core of each alteration zone appears to be abnormally enriched in potassium relative to the surrounding strata. The core of these alteration zones is typically enveloped by a chloritic alteration zone characterized by an increasing Fe/(Fe d- Mg) ratio away from the deposit.

 

Distinct sulphide mineralization facies are recognized as products of primary hydrothermal alteration, regional amphibolite--grade metamorphism, and accompanying penetrative tectonic deformation. Metals in these zones of hydrothermal alteration are interpreted as having resulted from leaching from the enclosing basalts, which display widespread physical and chemical effects of hydrothermal leaching. The widespread brecciation associated with the deposits can partly be explained by tectonism; it may also be evidence of a cyclic catastrophic stage during the evolution of the sea-floor hydrothermal system.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 39

 

The Sulitjelma Gabbro Complex shows textural features in accordance with rapid cooling by seawater and it is believed that a subvolcanic intrusion represents the heat source which drove the hydrothermal convection cell.

 

The highly altered geochemistry of the main lithologies, due to hydrothermal alteration, and the widespread presence of chlorite as the major silicate mineral makes them distinctive and readily recognizable at surface outcrop. The chloritization is either due to widespread retrograde metamorphism to greenschist grade or to abnormal fluid conditions during prograde metamorphism which prevented the crystallization of Ca amphiboles. Small but distinct, although somewhat erratic, dispersal halos of trace elements exist in the strata-bound horizons of chloritic alteration and extend up to 300 m away from the deposits. Zn, Pb, Co, Ag, Cd, As, Bi, and Se form the most readily detectable halos. The size and orientation of the halos are strongly controlled by structural deformation of the sequence.

 

Major minerals in the VMS deposits are pyrite, chalcopyrite, sphalerite, and pyrrhotite. Galena and arsenopyrite are minor minerals. The minerals typically contain metablastic pyrite in a matrix of chalcopyrite, sphalerite, and pyrrhotite, with the pyrite commonly displaying either cataclastic deformation textures or annealed to 120° triple junctions. The famous large, rounded pyrite crystals, 1 cm or larger, termed “durchbewe-gung” (through-movement) fabrics by early German workers, have been the subject of much interest. They have been interpreted as the results of the deformation which accompanied regional metamorphism and are aligned parallel to the schistosity of the enclosing rock. Gangue minerals include quartz, iron- and titanium-oxides, and locally, anhydrite.

 

Several of the deposits display variations in mineralogy, notably the Sagmo deposit, possessing more pyrrhotite than pyrite. At the Mons Petter deposit, there is a widespread, distinct facies of the mineralization composed of magnetite, pyrite and sphalerite. Grades of precious metals in all the deposits are generally low.

 

Differential mobilization of the mineralization induced by metamorphism and tectonism is recognized at various scales (Figure 7-9). Fold hinges within the mineralised zones typically display considerable enrichment of the more ductile sulphide phases, particularly chalcopyrite and pyrrhotite. The mineralization is often also thickened in the necks of the folds and thinned on the limbs. The mineralogy of the subjacent potassic zone is usually K-feldspar, biotite and albite, with varying proportions of quartz, albite, quartz, chlorite, hornblende, actinolite and sulphides.

 

Figure 7-9. Example of Folding in Giken II Mineralisation

[After Cook et al, 1990]

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 40

 

8DEPOSIT TYPE

 

The Sulitjelma Project area contains more than 20 different VMS deposits, which are recognised as stratiform, strata-bound pyritic Cu-Zn sulphide bodies, the products of volcanic-associated hydrothermal sedimentary exhalative formation. There are many shared characteristics of Cyprus-type VMS deposits such as being hosted by pillowed mafic volcanic rocks of ophiolitic affinity, examples of which include those in Cyprus itself, the Semail ophiolite in Oman and the Ergani district in Turkey.

 

These deposits are interpreted as having been originally formed at a single stratigraphic interval on the Ordovician seafloor. The stratigraphy of the Sulitjelma Project area has undergone amphibolite-grade metamorphism, and polyphase penetrative deformation of the sequence has resulted in widespread stratigraphic inversion, as well as overlapping of different parts of the original strata, giving what are now effectively different beds.

 

Each individual deposit is elongate or tabular in shape and is confined to a single stratigraphic interval and they are typically 500 to 1,200 m in length, 200 to 400 m in width, and from 1 to 15 m in thickness. In the northern ore field, these deposits are typically dipping from 10 to 45 degrees to the north-east. Each deposit lies on a distinct axis, most deposits in the northern field having long axes trending northwest-southeast. These lithologies, together with the deposits and enclosing envelopes of alteration, have been isoclinally folded by simple shear, such that they now appear stacked up within the stratigraphy, giving the appearance of multiple mineralised zones.

 

Each deposit has a well-developed subjacent zone of alteration, in which the core of each alteration zone appears to be abnormally enriched in potassium relative to the surrounding strata. The potassically enriched core is enveloped by a more typical chloritic alteration zone characterized by an increasing Fe/(Fe + Mg) ratio away from the deposit. There are distinct facies in the mineralization that are recognized as products of primary hydrothermal zonation, regional amphibolite-grade metamorphism, and accompanying penetrative tectonic deformation. The metals in the deposits are interpreted as having resulted from leaching of the enclosing basalts, which display widespread the physical and chemical effects of hydrothermal leaching.

 

Typically, the deposits are overlain by amphibolites or schists, with basalts of the Otervatn Volcanic Formation below. However, with the isoclinal folding and stratigraphic inversion, means that variations can occur, often with amphibolites both above and below the deposits.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 41

 

9EXPLORATION

 

Blue Moon has not carried out any exploration work on the property. For a description of historical exploration work, refer to Section 6 - History.

 

10DRILLING

 

Blue Moon has not carried out any drilling work on the property. This section provides a summary of all drilling, as well as all coring procedures relative to all work done by prior operators for the Sulitjelma Project.

 

A summary of historic drilling at Sulitjelma Project is shown in Table 10-1. The inventories of drill core stored at the Lokken facility contains 816 diamond drill holes, totalling 137,699 m. These drill holes were completed over period of 43-years between 1945 and 1988. Specifically, regarding the Sulitjelma Project area, 642 holes were completed, totalling 97,202 m, completed over a 36-year period between 1952 and 1988. From these holes, the inventory data records indicate that 41,155 m of this core is stored at Lokken, representing 42% of the drilled total.

 

The drilling database used for the mineral resource estimate described in this report contains 601 historic drill holes, totalling 78,144 m. The current mineral resource estimate is presented in Section 14 of this report with an effective date of February 20th, 2025.

 

The Author has not been able to verify the drilling methodologies for the Sulitjelma Project because of a loss of records by NSG. Similarly, the Author has not been able to verify the core logging procedures for the Sulitjelma Project for the same reason; however, the Author is confident that the appropriate information has been captured due to the review of databases and referencing back to stored drill core that was available for review. This includes information about lithology, alteration, mineralization, and structure, meaning in the opinion of the Author, the data was collected properly for use in a mineral resource estimation exercise.

 

Table 10-1. Sulitjelma Drilling Summary

 

  Holes in Drilled Years
  DB Length (m)
All 816 137,699 1945-1988
Areas Being Evaluated 642 97,202 1952-1988
Current Database 601 78,144 1952-1988

 

The drill core diameters of the completed drill holes in the Sulitjelma Project area are summarised in Table 10-2. The data related to 10 of the holes, within the currently evaluated areas, do not have a recorded core diameter.

 

Table 10-2. Summary of Core Diameters

 

Diameter (mm) Holes Proportion (%)
22 147 23%
32 251 40%
36 (BQ) 234 37%
Total 632 100%

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 42

 

Drillhole collar and orientation data for the regions in the current study are summarised in Table 10-3 to Table 10-7. The column BHID_Original shows the original drill names. The field BHID is the numeric identifier which been newly assigned in the current database.

 

The principal intersections selected for subsequent modelling are summarised in Table 10-8 to Table 10-11. The column TRUETHK shown is the true thickness of each intersection i.e. the derived perpendicular distance between the upper and lower boundaries of the mineralised zone being intersected.

 

An overall plan and sections of the drilling are shown in Figure 10-1 to Figure 10-4.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 43

 

Table 10-3. Drill Hole Collars – Rupsi-Dypet (1 of 2)

 

    Collar Coordinates (m)             Collar Coordinates (m)      
BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
  BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
128B 1 543,996 7,449,358 522.7 23.0 70.0 559.0   CH2-98B 72 545,514 7,448,314 -160.0 180.0 55.0 68.5
129 2 544,627 7,449,585 691.0 0.0 90.0 957.6   CH2-99B 73 546,121 7,448,308 -269.0 80.0 40.0 81.6
130 3 544,143 7,449,196 540.0 150.0 90.0 745.0   CH2-99C 74 546,121 7,448,308 -269.0 10.0 42.0 315.0
135 4 543,857 7,449,742 600.7 360.0 86.0 740.0   CH2-99D 75 546,119 7,448,308 -269.0 10.0 35.0 342.6
136 5 543,708 7,449,659 585.9 162.0 81.0 751.0   CH2-99E 76 546,121 7,448,308 -269.0 10.0 28.0 530.3
137 6 544,026 7,449,599 618.9 360.0 86.0 760.0   CH2-99F 77 546,121 7,448,308 -269.0 10.0 14.5 207.3
149 7 544,383 7,449,441 657.0 236.0 78.0 820.6   CH2-99G 78 546,121 7,448,308 -269.0 90.0 3.0 242.5
168 8 544,183 7,449,483 623.3 360.0 75.0 750.0   CH2-99H 79 546,121 7,448,308 -269.0 320.0 38.0 250.0
180 9 543,681 7,449,379 488.6 47.0 84.2 493.3   CH2-99I 80 546,120 7,448,307 -269.0 320.0 31.0 233.8
181 10 544,166 7,449,682 652.4 0.0 81.0 775.0   CH2-99J 81 546,120 7,448,307 -269.0 45.0 35.0 105.0
182 11 544,208 7,449,921 702.6 169.0 88.0 937.0   CH2-99K 82 546,120 7,448,307 -269.0 45.0 27.0 262.3
186 12 544,094 7,449,846 661.2 297.0 85.0 826.0   CH2-100B 83 546,029 7,448,299 -269.0 190.0 41.0 34.4
205A 13 546,487 7,447,774 584.0 338.0 56.0 313.5   GI2-81A 84 546,983 7,448,478 -406.0 222.0 -55.0 49.2
207A 14 546,348 7,447,867 605.0 336.0 59.0 657.8   GI2-81B 85 546,988 7,448,481 -406.0 42.0 55.0 79.8
207B 15 546,348 7,447,868 606.0 3.0 66.0 697.9   GI2-82B 86 546,895 7,448,228 -269.0 166.0 33.0 26.6
208 16 547,452 7,448,644 755.0 139.0 77.0 812.0   GI2-83B 87 546,608 7,448,236 -269.0 0.0 31.0 358.6
209 17 547,644 7,448,436 717.0 147.0 83.0 663.0   GI2-83C 88 546,608 7,448,236 -269.0 0.0 38.0 164.5
Da-120A 19 543,807 7,449,179 467.0 0.0 90.0 401.2   GI2-83D 89 546,608 7,448,236 -269.0 40.0 23.0 215.9
Da-120B 20 543,807 7,449,179 467.0 45.0 60.0 452.1   GI2-83E 90 546,608 7,448,236 -269.0 40.0 25.0 109.4
Da-210A 21 543,242 7,449,045 263.0 119.0 58.0 173.2   GI2-83F 91 546,608 7,448,236 -269.0 310.0 14.0 357.3
Da-210B 22 543,242 7,449,045 263.0 81.0 33.0 252.0   GI2-83G 92 546,608 7,448,236 -269.0 328.0 17.0 266.6
Da-210C 23 543,242 7,449,045 263.0 293.0 50.0 173.0   GI2-83H 93 546,608 7,448,236 -269.0 328.0 21.0 285.1
239 24 544,121 7,449,796 658.0 171.0 86.0 820.0   GI2-83I 94 546,608 7,448,236 -269.0 328.0 17.0 140.4
CH2-71A 30 545,912 7,448,181 -195.0 0.0 -55.0 4.0   GI2-83J 95 546,608 7,448,236 -269.0 0.0 26.0 195.9
CH2-71B 31 545,912 7,448,181 -195.0 180.0 55.0 39.2   GI2-83K 96 546,608 7,448,236 -269.0 0.0 29.0 415.1
CH2-72A 32 546,142 7,448,111 -195.0 0.0 -60.0 4.7   GI2-83L 97 546,608 7,448,236 -269.0 328.0 35.0 97.8
CH2-72B 33 546,142 7,448,111 -195.0 180.0 45.0 23.9   GI2-83M 98 546,608 7,448,236 -269.0 328.0 28.0 204.3
CH2-73B 34 545,381 7,448,052 -33.0 214.0 40.0 59.1   GI2-83N 99 546,608 7,448,236 -269.0 0.0 90.0 52.2
CH2-73C 35 545,381 7,448,052 -33.0 214.0 5.0 106.1   GI2-84B 100 547,671 7,448,106 -106.0 7.0 50.0 81.6
CH2-74 36 545,527 7,448,213 -106.0 10.0 -60.0 132.5   GI2-84C 101 547,672 7,448,111 -106.0 9.0 60.0 157.2
CH2-75A 37 545,246 7,448,590 -182.0 30.0 -50.0 10.0   GI2-84D 102 547,672 7,448,111 -106.0 9.0 50.0 301.4
CH2-75B 38 545,246 7,448,593 -182.0 210.0 50.0 53.1   GI2-84E 103 547,671 7,448,106 -106.0 9.0 45.0 283.8
CH2-75C 39 545,246 7,448,590 -182.0 210.0 30.0 53.1   GI2-84F 104 547,671 7,448,106 -106.0 9.0 34.0 246.0
CH2-75D 40 545,252 7,448,590 -182.0 30.0 51.0 79.8   GI2-84G 105 547,671 7,448,106 -106.0 9.0 30.0 260.0
CH2-76 41 545,363 7,448,510 -182.0 200.0 55.0 69.4   GI2-84H 106 547,673 7,448,110 -99.0 7.0 -54.0 220.0
CH2-77 42 545,487 7,448,401 -182.0 200.0 50.0 59.8   GI2-85A 107 545,876 7,448,278 -269.0 40.0 -55.0 37.3
CH2-78A 43 545,597 7,448,325 -182.0 30.0 -55.0 9.2   GI2-85B 108 545,876 7,448,278 -269.0 220.0 54.0 63.2
CH2-78B 44 545,599 7,448,322 -182.0 210.0 50.0 56.7   GI2-86A 109 546,800 7,448,237 -269.0 335.0 -50.0 44.4
CH2-79A 45 545,712 7,448,214 -182.0 20.0 -65.0 9.8   GI2-86B 110 546,800 7,448,237 -269.0 155.0 44.0 28.4
CH2-79B 46 545,712 7,448,214 -182.0 180.0 50.0 38.2   GI2-87B 111 546,968 7,448,366 -343.0 142.0 42.0 73.7
CH2-80 47 545,829 7,448,176 -182.0 200.0 50.0 51.7   GI2-88B 112 546,802 7,448,256 -269.0 0.0 32.0 166.3
CH2-81 48 545,934 7,448,143 -182.0 170.0 53.0 45.0   GI2-88C 113 546,802 7,448,256 -269.0 355.0 35.0 134.9
CH2-82A 49 546,015 7,448,125 -182.0 20.0 -50.0 6.0   GI2-88D 114 546,802 7,448,256 -269.0 0.0 30.0 280.5
CH2-82B 50 546,015 7,448,125 -182.0 200.0 50.0 47.6   GI2-88E 115 546,802 7,448,256 -269.0 0.0 41.0 117.7
CH2-83 51 546,167 7,448,109 -182.0 180.0 48.0 29.0   GI2-88F 116 546,802 7,448,256 -269.0 32.0 31.0 116.5
CH2-84A 52 546,241 7,448,076 -182.0 0.0 -47.0 7.3   GI2-88G 117 546,802 7,448,256 -269.0 32.0 28.0 126.3
CH2-84B 53 546,241 7,448,076 -182.0 180.0 55.0 26.7   GI2-88H 118 546,802 7,448,256 -269.0 63.0 22.0 142.4
CH2-85 54 546,207 7,448,123 -195.0 20.0 60.0 63.4   GI2-88I 119 546,802 7,448,256 -269.0 329.0 32.0 233.5
CH2-86 55 546,229 7,448,184 -195.0 0.0 45.0 86.8   GI2-88J 120 546,802 7,448,256 -269.0 329.0 25.0 344.5
CH2-86B 56 546,229 7,448,184 -195.0 209.0 70.0 39.3   GI2-88K 121 546,802 7,448,256 -269.0 297.0 23.0 89.6
CH2-86D 57 546,229 7,448,184 -195.0 2.0 65.0 65.2   GI2-89A 122 547,296 7,447,880 -102.0 115.0 -26.0 220.0
CH2-87 58 546,011 7,448,143 -195.0 0.0 45.0 91.0   GI2-89B 123 547,296 7,447,880 -101.0 116.0 -38.0 165.3
CH2-88 59 545,804 7,448,229 -195.0 0.0 45.0 116.3   GI2-89C 124 547,296 7,447,880 -101.0 93.0 -40.0 98.4
CH2-89B 60 545,600 7,448,341 -195.0 235.0 50.0 52.6   GI2-89D 125 547,296 7,447,880 -101.0 96.0 -23.0 166.5
CH2-89C 61 545,603 7,448,346 -195.0 25.0 45.0 88.8   GI2-89E 126 547,295 7,447,880 -101.0 141.0 -54.0 157.4
CH2-90B 62 545,552 7,448,455 -195.0 215.0 47.0 78.6   GI2-89F 127 547,296 7,447,883 -101.0 46.0 -12.0 84.8
CH2-90C 63 545,450 7,448,461 -195.0 35.0 50.0 82.0   GI2-89G 128 547,296 7,447,884 -101.0 76.0 -17.0 106.5
CH2-91B 64 545,376 7,448,519 -195.0 200.0 50.0 65.8   GI2-89H 129 547,296 7,447,884 -103.0 29.0 -8.0 93.7
CH2-92 65 545,589 7,448,082 -106.0 225.0 65.0 56.8   GI2-89I 130 547,297 7,447,883 -102.0 76.0 -5.0 219.6
CH2-94B 66 545,509 7,448,413 -195.0 240.0 50.0 65.3   GI2-89J 131 547,295 7,447,881 -101.0 0.0 -62.0 51.7
CH2-94C 67 545,513 7,448,414 -195.0 40.0 50.0 77.7   GI2-89K 132 547,295 7,447,881 -101.0 200.0 -83.0 68.2
CH2-95 68 545,401 7,448,500 -195.0 180.0 50.0 64.3   GI2-90B 133 546,606 7,448,122 -203.0 205.0 52.0 8.0
CH2-96A 69 546,008 7,448,075 -160.0 0.0 -55.0 11.8   MP-40D3 134 545,694 7,448,383 203.0 20.0 36.0 630.0
CH2-96B 70 545,987 7,448,063 -160.0 180.0 55.0 52.2   MP-40Q 135 545,682 7,448,377 205.5 28.0 51.0 603.4
CH2-97B 71 545,608 7,448,238 -160.0 210.0 55.0 54.4   MP-40Q3 136 545,694 7,448,383 203.0 43.0 26.0 210.0

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 44

 

 

Table 10-4. Drill Hole Collars – Rupsi-Dypet (2 of 2)

 

    Collar Coordinates (m)             Collar Coordinates (m)      
BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
  BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
MP-40R 137 545,682 7,448,377 203.0 20.0 39.0 687.5   GI2-100 203 546,489 7,448,137 -225.0 149.0 59.0 7.6
MP-40R2 138 545,682 7,448,377 203.0 9.0 40.0 677.5   GI2-101B 204 546,522 7,448,159 -225.0 124.0 59.0 18.1
MP-40S 139 545,680 7,448,377 205.5 0.0 34.0 786.7   GI2-102B 205 546,569 7,448,197 -241.5 191.0 56.0 16.2
MP-40S2 140 545,679 7,448,379 205.5 0.0 50.0 672.4   GI2-103B 206 546,487 7,448,202 -241.0 178.0 61.0 7.4
MP-40T 141 545,679 7,448,379 205.5 338.0 48.0 595.6   GI2-104B 207 546,451 7,448,192 -241.0 141.0 65.0 15.4
CH2-101B 142 545,879 7,448,371 -269.0 221.0 0.0 42.5   GI2-105B 208 546,386 7,448,191 -240.0 199.0 63.0 26.9
CH2-101C 143 545,879 7,448,371 -269.0 171.0 35.0 61.9   GI2-106B 209 546,355 7,448,197 -240.0 203.0 60.0 27.0
CH2-101D 144 545,879 7,448,371 -269.0 261.0 6.0 77.0   GI2-107B 210 546,323 7,448,185 -240.0 175.0 60.0 27.2
CH2-101E 145 545,879 7,448,371 -269.0 261.0 30.0 93.6   GI2-108A 211 547,290 7,448,079 -106.0 127.0 -6.0 213.4
CH2-101G 146 545,879 7,448,371 -269.0 126.0 25.0 113.3   GI2-108B 212 547,290 7,448,069 -103.0 212.0 -19.0 285.0
CH2-101H 147 545,879 7,448,371 -269.0 81.0 40.0 70.0   GI2-108C 213 547,290 7,448,079 -106.0 127.0 -10.0 296.3
CH2-101I 148 545,879 7,448,371 -269.0 36.0 45.0 192.3   GI2-116A1 214 546,589 7,448,268 -260.6 347.0 31.0 352.0
CH2-101J 149 545,879 7,448,371 -269.0 36.0 35.0 36.3   GI2-116G 215 546,589 7,448,268 -260.6 14.0 41.0 146.5
CH2-101K 150 545,879 7,448,371 -269.0 140.0 27.0 27.0   GI2-116M 216 546,589 7,448,268 -260.6 321.0 34.0 166.7
CH2-101L 151 545,879 7,448,371 -269.0 81.0 70.0 88.6   GI2-116O 217 546,589 7,448,268 -260.6 29.0 28.0 258.1
CH2-105D 152 545,869 7,448,106 -160.0 43.0 65.0 55.0   GI2-116R 218 546,589 7,448,268 -260.6 3.0 35.0 200.0
CH2-106B 153 545,917 7,448,088 -160.0 203.0 68.0 28.2   BU-2 219 543,673 7,448,491 162.0 45.0 -73.0 42.8
CH2-107B 154 545,984 7,448,099 -160.0 202.0 54.0 38.8   BU-3 220 543,791 7,448,375 162.0 45.0 -73.0 62.8
CH2-108A 155 545,628 7,448,314 -182.0 29.0 58.0 83.5   BU-4 221 543,475 7,448,916 162.0 0.0 -70.0 28.4
CH2-108B 156 545,631 7,448,314 -182.0 29.0 41.0 128.8   BU-5 222 543,465 7,448,916 162.0 0.0 70.0 31.5
CH2-108C 157 545,628 7,448,313 -182.0 29.0 27.0 246.4   BU-8A 223 544,049 7,448,126 162.0 0.0 -71.0 38.0
CH2-108D 158 545,628 7,448,313 -178.0 29.0 29.0 210.0   BU-8B 224 544,049 7,448,126 162.0 0.0 -90.0 26.8
CH2-108E 159 545,627 7,448,313 -182.0 356.0 23.0 223.1   BU-9A 225 543,989 7,448,186 162.0 0.0 -74.0 38.6
CH2-108F 160 545,627 7,448,313 -178.0 356.0 20.0 123.0   BU-9B 226 543,989 7,448,186 162.0 180.0 -50.0 34.3
CH2-108G 161 545,627 7,448,313 -178.0 335.0 24.0 127.0   BU-10A 227 544,015 7,448,161 162.0 0.0 -84.0 44.8
CH2-108H 162 545,629 7,448,311 -178.0 94.0 18.0 98.2   BU-10B 228 544,015 7,448,161 162.0 0.0 -50.0 31.5
CH2-108I 163 545,627 7,448,308 -178.0 83.0 14.0 144.4   BU-11A 229 544,228 7,448,551 169.0 45.0 -65.0 54.7
CH2-108J 164 545,629 7,448,313 -178.0 74.0 22.0 134.3   BU-12A 230 544,205 7,448,392 169.0 90.0 -65.0 50.1
CH2-108K 165 545,629 7,448,313 -178.0 65.0 23.0 178.5   BU-13A 231 543,669 7,448,861 169.0 295.0 -55.0 88.5
CH2-108L 166 545,629 7,448,313 -178.0 59.0 23.0 165.0   BU-14A 232 544,383 7,448,321 109.0 121.0 -15.0 112.9
CH2-108M 167 545,629 7,448,313 -178.0 35.0 37.0 100.0   BU-14B 233 544,383 7,448,321 109.0 110.0 -7.0 164.4
CH2-108N 168 545,628 7,448,313 -178.0 47.0 38.0 167.5   BU-15A 234 544,383 7,448,321 109.0 36.0 16.0 158.9
CH2-108O 169 545,628 7,448,313 -178.0 47.0 30.0 231.1   BU-15B 235 544,379 7,448,321 109.0 36.0 8.0 180.2
CH2-108P 170 545,629 7,448,311 -178.0 84.0 30.0 190.8   BU-16 236 544,373 7,448,300 139.0 225.0 -60.0 52.6
CH2-109A 171 545,556 7,448,329 -169.0 234.0 55.0 186.0   BU-17A 237 544,795 7,448,413 62.0 70.0 -44.0 76.9
CH2-109B 172 545,556 7,448,329 -169.0 13.0 35.0 139.3   BU-17B 238 544,795 7,448,413 62.0 250.0 43.0 17.8
CH2-109C 173 545,556 7,448,329 -169.0 38.0 48.0 73.8   BU-18 239 544,604 7,448,370 101.0 58.0 -70.0 76.7
CH2-110B 174 545,653 7,448,288 -195.0 223.0 58.0 40.7   BU-19 240 544,684 7,448,053 139.0 45.0 -61.0 59.3
CH2-110C 175 545,653 7,448,288 -195.0 217.0 18.0 17.3   BU-20A 241 543,977 7,448,310 196.0 220.0 -50.0 15.2
CH2-110D 176 545,650 7,448,294 -195.0 37.0 54.0 73.2   BU-20B 242 543,977 7,448,310 196.0 150.0 -70.0 10.7
CH2-111B 177 545,879 7,448,201 -195.0 205.0 68.0 43.6   BU-21A 243 543,994 7,448,305 196.0 220.0 -50.0 11.5
CH2-111C1 178 545,879 7,448,201 -195.0 204.0 32.0 49.6   BU-21B 244 543,994 7,448,305 196.0 140.0 -60.0 10.9
CH2-111C2 179 545,879 7,448,201 -195.0 191.0 25.0 49.3   BU-22 245 544,031 7,448,263 197.0 240.0 -68.0 10.9
CH2-111D 180 545,879 7,448,201 -195.0 358.0 65.0 51.8   BU-23A 246 544,428 7,448,226 132.0 60.0 61.0 50.8
CH2-112B 181 545,993 7,448,158 -195.0 140.0 59.0 52.6   BU-24B 247 543,644 7,448,860 163.5 81.0 72.0 42.3
CH2-112C 182 546,002 7,448,155 -195.0 206.0 10.0 55.7   BU-25B 248 543,562 7,448,859 163.0 180.0 58.0 27.5
CH2-113B 183 546,067 7,448,131 -195.0 202.0 80.0 37.1   BU-25C 249 543,560 7,448,861 163.0 321.0 27.0 54.3
CH2-113C 184 546,067 7,448,131 -194.0 194.0 6.0 65.0   Da-188A 250 544,352 7,448,702 535.0 58.0 72.0 555.0
CH2-113D 185 546,067 7,448,131 -195.0 22.0 52.0 60.7   Da-188B 251 544,352 7,448,702 535.0 326.0 71.0 487.2
CH2-114B 186 546,114 7,448,118 -195.0 14.0 50.0 59.1   Da-188D 252 544,352 7,448,702 535.0 120.0 74.0 349.4
CH2-115A 187 545,644 7,448,373 -196.0 125.0 31.0 149.5   Da-195A 253 544,159 7,448,760 477.0 99.0 78.0 290.0
CH2-115C 188 545,644 7,448,378 -196.0 50.0 36.0 178.5   Da-195B 254 544,159 7,448,760 477.0 207.0 72.0 290.9
CH2-115D 189 545,641 7,448,379 -196.0 26.0 43.0 233.0   Da-195C 255 544,159 7,448,760 477.0 338.0 79.0 290.5
CH2-115E 190 545,640 7,448,379 -196.0 346.0 42.0 130.0   Da-196A 256 544,105 7,448,601 443.0 99.0 63.0 251.3
CH2-115F 191 545,639 7,448,379 -200.0 321.0 23.0 176.5   Da-198A 257 544,371 7,448,921 583.0 169.0 86.0 490.0
CH2-115H 192 545,640 7,448,379 -196.0 352.0 33.0 328.0   Da-198B 258 544,371 7,448,923 583.0 67.0 79.0 516.8
CH2-115I 193 545,637 7,448,373 -196.0 331.0 27.0 230.0   Da-198C 259 544,369 7,448,920 583.0 282.0 81.0 462.5
GI2-91B 195 546,569 7,448,140 -203.0 149.0 53.0 20.0   Da-200A 260 544,320 7,448,991 569.0 279.0 81.0 478.8
GI2-92B 196 546,528 7,448,109 -203.0 130.0 62.0 9.8   Da-201A 261 544,525 7,449,056 608.0 190.0 84.0 599.2
GI2-93B 197 546,488 7,448,101 -203.0 155.0 59.0 9.5   Da-201B 262 544,527 7,449,064 608.0 138.0 77.0 645.5
GI2-94B 198 546,460 7,448,100 -202.0 140.0 57.0 19.5   Da-201C 263 544,527 7,449,056 608.0 252.0 70.0 600.0
GI2-96A 199 546,008 7,448,075 -160.0 0.0 55.0 11.8   Da-202A 264 544,510 7,448,911 606.0 288.0 81.0 546.2
GI2-97B 200 546,393 7,448,115 -225.0 149.0 57.0 20.8   Da-202B 265 544,510 7,448,911 606.0 138.0 79.0 500.0
GI2-98B 201 546,543 7,448,169 -225.0 189.0 58.0 13.6   Da-218 266 544,240 7,448,984 553.0 177.0 79.0 423.2
GI2-99B 202 546,589 7,448,162 -225.0 203.0 62.0 10.9   Da-119 267 543,698 7,449,104 450.0 0.0 90.0 350.6

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 45

 

Table 10-5. Drill Hole Collars – Hankabakken II (1 of 2)

 

    Collar Coordinates (m)             Collar Coordinates (m)      
BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
  BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
Kop-150A 268 548,863.0 7,448,773.0 830.9 182.0 46.0 129.2   Ha2-12A 335 547,937.5 7,447,638.0 186.0 0.0 -35.0 15.0
Kop-150B 269 548,864.0 7,448,780.0 832.0 346.0 31.0 190.0   Ha2-12B 336 547,937.5 7,447,638.0 186.0 180.0 35.0 3.0
Kop-150C 270 548,865.0 7,448,779.0 831.7 344.0 54.0 173.9   Ha2-13A 337 547,867.5 7,447,639.9 186.0 330.0 -57.0 8.2
Kop-150D 271 548,864.0 7,448,776.0 831.3 252.0 30.0 143.6   Ha2-13B 338 547,867.5 7,447,639.9 186.0 180.0 55.0 10.0
Hanken-157A 272 548,285.3 7,447,475.1 506.7 180.0 76.5 148.8   Ha2-14A 339 547,790.0 7,447,627.0 186.0 360.0 -54.0 17.8
Hanken-156A 273 548,193.2 7,447,390.9 525.4 189.7 70.2 110.1   Ha2-14B 340 547,790.0 7,447,627.0 186.0 180.0 42.0 28.5
Hanken-156B 274 548,193.2 7,447,390.9 525.4 134.5 69.5 113.8   Ha2-15A 341 547,722.0 7,447,620.0 186.0 350.0 -45.0 9.9
Hanken-156C 275 548,193.2 7,447,390.9 525.4 110.4 52.2 125.1   Ha2-15B 342 547,722.0 7,447,620.0 186.0 180.0 43.0 6.0
Hanken-155A 276 548,353.7 7,447,356.4 536.9 133.7 66.5 89.6   Ha2-16A 343 547,669.0 7,447,617.0 186.0 5.0 -45.0 5.0
Hanken-155B 277 548,353.7 7,447,356.4 536.9 240.8 62.5 95.3   Ha2-16B 344 547,669.0 7,447,617.0 186.0 180.0 38.0 6.5
Fjell-154A 278 548,460.0 7,448,602.0 766.3 162.0 45.0 28.0   Ha2-17A 345 547,612.0 7,447,609.0 210.0 350.0 -56.0 6.3
Fjell-154B 279 548,460.0 7,448,602.0 766.3 342.0 32.0 62.1   Ha2-17B 346 547,612.0 7,447,609.0 210.0 180.0 66.0 28.0
Kop-153A 280 548,656.5 7,448,663.0 808.7 180.0 71.0 63.8   Ha2-18A 347 547,933.0 7,447,617.0 210.0 350.0 -66.0 12.8
Kop-153B 281 548,656.0 7,448,663.0 808.7 180.0 71.0 135.5   Ha2-18B 348 547,933.0 7,447,617.0 210.0 200.0 50.0 6.5
Kop-152A 282 549,115.0 7,448,883.0 801.3 174.0 58.0 58.6   Ha2-19A 349 547,869.0 7,447,610.0 210.0 360.0 -48.0 3.6
Kop-152B 283 549,114.0 7,448,878.0 800.8 320.0 49.0 130.0   Ha2-19B 350 547,869.0 7,447,610.0 210.0 180.0 40.0 5.6
Kop-152C 284 549,114.0 7,448,887.0 801.7 315.0 70.0 181.0   Ha2-20A 351 547,760.0 7,447,588.0 209.0 330.0 -50.0 26.5
Kop-151A 285 548,975.0 7,448,815.0 819.2 0.0 90.0 118.5   Ha2-20B 352 547,760.0 7,447,588.0 209.0 180.0 50.0 6.0
Kop-151B 286 548,976.9 7,448,816.3 819.0 180.0 40.0 83.4   Ha2-21A 353 547,778.0 7,447,596.0 210.0 360.0 -47.0 15.2
Kop-151C 287 548,975.0 7,448,818.0 818.8 342.0 45.0 187.3   Ha2-21B 354 547,778.0 7,447,596.0 210.0 180.0 48.0 6.2
Lap-164 288 547,995.0 7,448,520.0 729.8 161.0 56.0 159.0   Ha2-22A 355 547,822.0 7,447,609.0 210.0 340.0 -52.0 12.9
Lap-165 289 547,841.0 7,448,351.0 684.1 155.0 47.0 130.0   Ha2-22B 356 547,822.0 7,447,609.0 210.0 180.0 52.0 13.8
Lap-166 290 547,706.0 7,448,259.0 661.7 149.0 62.0 96.9   Ha2-23A 357 547,534.0 7,447,623.0 210.0 15.0 -68.0 11.5
Lap-167 291 547,453.0 7,448,316.0 691.3 155.0 60.0 82.8   Ha2-23B 358 547,534.0 7,447,623.0 210.0 195.0 57.0 10.1
Lap-169 292 548,967.4 7,449,062.6 824.7 164.4 43.3 165.0   Ha2-24A 359 548,183.0 7,447,648.0 210.0 40.0 -53.0 17.2
Hanken-177A1 293 548,698.9 7,447,402.6 545.1 0.0 63.9 113.0   Ha2-24B 360 548,183.0 7,447,648.0 210.0 180.0 50.0 2.7
Hanken-177A 294 548,698.9 7,447,402.6 545.1 180.0 63.9 92.0   Ha2-25A 361 548,134.0 7,447,640.0 211.0 360.0 50.0 16.2
Hanken-177B 295 548,698.9 7,447,402.6 545.1 0.0 74.7 126.1   Ha2-25B 362 548,120.0 7,447,640.0 211.0 180.0 -40.0 2.9
Hanken-177C 296 548,700.9 7,447,400.6 545.5 285.8 45.9 172.4   Ha2-26A 363 548,091.0 7,447,642.0 210.0 325.0 -60.0 16.6
Hanken-177D 297 548,698.9 7,447,402.6 545.1 105.8 27.0 114.1   Ha2-26B 364 548,091.0 7,447,640.0 210.0 145.0 30.0 9.0
Hanken-179A 298 548,550.6 7,447,295.4 539.6 0.0 76.5 38.2   Ha2-27A 365 548,178.0 7,447,645.0 210.0 215.0 -60.0 33.1
Hanken-179B 299 548,550.6 7,447,295.4 539.6 180.0 81.0 30.0   Ha2-27B 366 548,178.0 7,447,645.0 210.0 210.0 -88.0 21.7
Hanken-179C 300 548,550.6 7,447,295.4 539.6 180.0 60.3 37.4   Ha2-27C 367 548,178.0 7,447,645.0 210.0 205.0 44.0 4.5
Hanken-184E 304 548,611.0 7,447,309.0 546.0 0.0 50.0 63.0   Ha2-28A 368 547,918.0 7,447,705.0 186.0 346.0 43.0 318.0
Hanken-184F 305 548,611.0 7,447,309.0 546.0 0.0 40.0 122.0   Ha2-28B 369 547,918.0 7,447,705.0 186.0 346.0 50.0 280.1
Hanken-184G 306 548,611.0 7,447,309.0 546.0 180.0 45.0 77.0   Ha2-28C 370 547,918.0 7,447,705.0 186.0 346.0 61.0 270.0
Hanken-184H 307 548,611.0 7,447,309.0 546.0 0.0 90.0 35.9   Ha2-29 371 547,918.0 7,447,705.0 186.0 320.0 40.0 170.0
Hanken-184J 308 548,611.0 7,447,309.0 546.0 180.0 55.0 61.0   Ha2-30A 372 547,918.5 7,447,705.0 186.0 320.0 30.0 556.1
Hanken-187A 310 548,598.0 7,447,434.0 534.3 240.0 90.0 102.5   Ha2-30B 373 547,918.0 7,447,705.0 186.0 320.0 30.0 556.1
Hanken-187C 311 548,598.0 7,447,434.0 534.3 240.0 72.0 116.2   Ha2-31A 374 547,977.0 7,447,804.0 90.0 360.0 -60.0 8.4
Hanken-187D 312 548,598.0 7,447,434.0 534.3 240.0 40.0 137.0   Ha2-31B 375 547,977.0 7,447,804.0 90.0 180.0 61.0 18.0
Kop-209 313 547,452.0 7,448,644.0 752.7 139.0 77.0 663.3   Ha2-32A 376 547,978.0 7,447,768.0 118.0 360.0 -60.0 8.4
Kop-208 314 547,644.0 7,448,436.0 715.9 147.0 83.0 849.5   Ha2-32B 377 547,978.0 7,447,768.0 118.0 180.0 60.0 17.8
Hanken-221A 315 548,620.6 7,447,950.3 538.0 144.0 81.0 232.2   Ha2-33A 378 547,990.0 7,447,730.0 144.0 360.0 -60.0 16.0
Hanken-221B 316 548,620.6 7,447,950.3 538.0 109.8 61.2 285.4   Ha2-33B 379 547,990.0 7,447,730.0 144.0 180.0 60.0 13.0
Hanken-221C 317 548,620.6 7,447,825.3 519.1 67.5 46.8 307.0   Ha2-34A 380 547,997.0 7,447,690.0 164.0 360.0 -60.0 21.9
Hanken-223A 318 548,620.6 7,447,825.3 519.1 144.0 81.0 210.8   Ha2-34B 381 547,997.0 7,447,690.0 164.0 180.0 60.0 5.6
Hanken-223B 319 548,620.6 7,447,825.3 519.1 207.0 64.8 190.3   Ha2-35A 382 547,454.0 7,447,613.0 187.0 320.0 -64.0 44.8
Hanken-233A 320 548,467.0 7,447,890.0 528.9 144.0 81.0 254.0   Ha2-35B 383 547,454.0 7,447,613.0 187.0 140.0 53.0 33.1
Hanken-233B 321 548,467.0 7,447,890.0 528.9 207.0 65.0 269.6   Ha2-36 384 547,975.0 7,447,843.0 80.0 180.0 54.0 14.0
Hanken-234A 322 547,831.4 7,447,579.4 498.5 249.3 54.0 289.8   Ha2-37A 385 547,771.0 7,447,706.0 144.0 310.0 -52.0 10.8
Hanken-234B 323 547,831.4 7,447,579.4 498.5 207.0 61.2 260.0   Ha2-37B 386 547,771.0 7,447,706.0 144.0 145.0 50.0 24.5
Ha2-1 324 548,158.6 7,447,689.4 186.0 290.0 -38.0 12.0   Ha2-38A 387 548,292.0 7,447,630.0 237.0 17.0 -58.0 7.3
Ha2-2 325 548,134.8 7,447,680.0 186.0 340.0 -39.0 18.5   Ha2-38B 388 548,292.0 7,447,630.0 237.0 197.0 59.0 12.9
Ha2-3 326 548,101.0 7,447,667.5 186.0 0.0 -34.0 21.0   Ha2-39A 389 548,178.7 7,447,617.7 236.0 340.0 -56.0 16.8
Ha2-4 327 548,075.0 7,447,660.0 186.0 335.0 -38.0 23.0   Ha2-39B 390 548,178.7 7,447,617.7 236.0 160.0 60.0 8.9
Ha2-5 328 547,999.4 7,447,641.9 186.0 335.0 -40.0 23.0   Ha2-40A 391 547,683.9 7,447,678.1 163.0 350.0 80.0 30.4
Ha2-6 329 547,973.0 7,447,639.0 186.0 360.0 -40.0 19.0   Ha2-40B 392 547,683.9 7,447,678.1 163.0 350.0 50.0 91.9
Ha2-7 330 547,960.0 7,447,600.0 187.0 315.0 43.0 61.3   Ha2-40C 393 547,683.9 7,447,678.1 163.0 350.0 60.0 48.6
Ha2-8 331 547,972.0 7,447,570.0 187.0 360.0 -69.0 67.5   Ha2-41A 394 548,400.0 7,447,636.0 237.0 345.0 -44.0 13.7
Ha2-9 332 547,997.0 7,447,614.0 187.0 110.0 42.0 64.0   Ha2-41B 395 548,400.0 7,447,636.0 237.0 165.0 44.0 18.9
Ha2-10 333 548,094.0 7,447,649.0 217.0 291.0 -45.0 32.5   Ha2-42A 396 548,417.0 7,447,496.0 237.0 325.0 39.0 143.4
Ha2-11 334 548,095.0 7,447,617.0 217.0 300.0 -50.0 24.6   Ha2-42B 397 548,417.0 7,447,496.0 237.0 325.0 45.0 86.0

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 46

 

Table 10-6. Drill Hole Collars – Hankabakken II (2 of 2)

 

    Collar Coordinates (m)             Collar Coordinates (m)      
BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
  BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
Ha2-43A 398 548,419.6 7,447,493.4 355.0 35.0 45.0 78.1   Ha1-39A 462 548,118.9 7,447,210.8 488.0 326.0 -55.0 21.5
Ha2-43B 399 548,419.6 7,447,493.4 355.0 35.0 70.0 34.0   Ha1-40A 463 548,117.2 7,447,193.8 488.0 355.0 -75.0 12.1
Ha2-44A 400 547,739.0 7,447,676.0 164.0 360.0 -50.0 15.0   Ha1-41A 464 548,131.1 7,447,198.0 488.0 310.0 -45.0 15.2
Ha2-44B 401 547,739.0 7,447,676.0 164.0 180.0 45.0 15.0   Ha1-42A 465 548,082.2 7,447,194.3 488.0 303.0 -5.0 49.2
Ha2-45A 402 547,585.0 7,447,652.0 164.0 360.0 -51.0 13.2   Ha1-44 467 548,451.9 7,447,207.9 555.9 200.0 60.0 9.8
Ha2-45B 403 547,585.0 7,447,650.0 164.0 180.0 50.0 6.7   Ha1-45 468 548,449.7 7,447,221.9 551.5 200.0 60.0 16.8
Ha2-46A 404 547,354.0 7,447,659.0 164.0 360.0 -55.0 12.8   Ha1-46 469 548,466.6 7,447,229.1 549.9 200.0 60.0 25.0
Ha2-46B 405 547,354.0 7,447,657.0 164.0 180.0 52.0 11.4   Ha1-47 470 548,475.4 7,447,238.3 549.6 200.0 60.0 28.4
Ha2-47A 406 547,737.0 7,447,718.0 118.0 360.0 -50.0 24.3   Ha1-48 471 548,488.4 7,447,240.4 549.8 200.0 60.0 17.1
Ha2-47B 407 547,739.0 7,447,717.0 118.0 180.0 48.0 11.1   Ha1-49 472 548,472.2 7,447,254.2 543.1 200.0 60.0 11.0
Ha2-48 408 547,592.0 7,447,708.0 118.0 360.0 -40.0 7.0   Ha1-51 474 548,401.2 7,447,186.1 566.8 270.0 55.0 8.7
Ha2-49A 409 547,369.4 7,447,713.4 117.0 0.0 -50.0 11.8   Ha1-52A 475 548,161.2 7,447,386.5 410.0 16.0 -57.0 18.1
Ha2-49B 410 547,369.6 7,447,702.4 117.0 180.0 50.0 10.5   Ha1-53B 476 548,199.2 7,447,388.0 410.0 165.0 52.0 9.0
Ha2-50A 411 547,391.4 7,447,779.7 60.0 0.0 -55.0 29.4   Ha1-54A 477 548,214.1 7,447,395.3 410.0 18.0 -54.0 15.0
Ha2-50B 412 547,391.5 7,447,777.7 60.0 180.0 52.0 7.1   Ha1-55A 478 548,269.1 7,447,394.1 410.0 0.0 -70.0 11.0
Ha2-51 413 547,598.4 7,447,779.8 60.0 0.0 -50.0 10.4   Ha2-P2-1 507 548,075.0 7,447,622.0 187.0 0.0 -90.0 2.5
Ha2-52A 414 548,161.0 7,447,389.0 61.0 0.0 52.0 26.0   Ha2-P2-2 508 548,075.0 7,447,626.0 189.0 0.0 -55.0 5.5
Ha2-52E 415 548,161.0 7,447,389.0 61.0 180.0 -70.0 45.2   Ha2-P3-1 509 548,055.0 7,447,616.0 186.0 0.0 -90.0 2.8
Ha2-53A 416 548,251.0 7,447,723.0 187.0 180.0 60.0 45.0   Ha2-P3-2 510 548,055.0 7,447,620.0 188.0 0.0 -60.0 6.0
Ha2-53B 417 548,251.0 7,447,723.0 187.0 360.0 50.0 94.3   Ha2-P4-1 511 548,035.0 7,447,549.0 237.0 0.0 -90.0 2.0
Ha2-53C 418 548,251.0 7,447,723.0 187.0 360.0 38.0 287.0   Ha2-P4-2 512 548,035.0 7,447,596.0 209.0 0.0 -90.0 5.0
Ha2-54B 420 548,213.0 7,447,398.0 411.0 18.0 -54.0 14.9   Ha2-P4-3 513 548,035.0 7,447,628.0 186.0 0.0 -90.0 6.5
Ha2-55A 421 548,268.0 7,447,397.0 411.0 338.0 -70.0 11.0   Ha2-P4-4 514 548,035.0 7,447,662.0 165.0 0.0 -90.0 2.5
Ha2-55B 422 548,268.0 7,447,397.0 411.0 158.0 55.0 22.8   Ha2-P6-1 515 547,995.0 7,447,598.0 186.0 0.0 -90.0 1.5
Ha2-56B 423 548,568.6 7,447,491.6 356.0 164.0 43.0 12.0   Ha2-P6-2 516 547,995.0 7,447,648.0 164.0 0.0 -90.0 2.0
Ha2-57B 424 548,633.5 7,447,497.6 349.0 166.0 54.0 12.0   Ha2-P6-3 517 547,995.0 7,447,651.0 165.0 0.0 -56.0 11.5
Ha2-59A 425 548,220.0 7,447,468.3 349.0 352.0 -48.0 7.7   Ha2-P7-1 518 547,975.0 7,447,647.0 163.0 0.0 -90.0 2.4
Ha2-59B 426 548,222.1 7,447,464.4 349.0 153.0 55.0 16.5   Ha2-P7-2 519 547,975.0 7,447,647.0 165.0 0.0 -55.0 8.0
Ha2-60 427 548,091.1 7,447,592.3 255.0 6.0 -45.0 10.5   Ha2-P8-1 520 547,955.0 7,447,600.0 186.0 0.0 -90.0 2.7
Ha2-61A 428 548,477.0 7,447,567.0 283.0 12.0 -62.0 13.3   Ha2-P8-2 521 547,955.0 7,447,640.0 163.0 0.0 -90.0 2.9
Ha2-61B 429 548,477.0 7,447,567.0 283.0 180.0 48.0 13.3   Ha2-P8-3 522 547,955.0 7,447,620.0 187.0 0.0 -90.0 1.1
Ha2-62A 430 548,405.0 7,447,576.0 283.0 350.0 -57.0 15.5   Ha2-P8-4 523 547,955.0 7,447,663.0 144.0 0.0 -90.0 1.5
Ha2-62B 431 548,405.0 7,447,576.0 283.0 160.0 55.0 15.5   Ha2-P8-5 524 547,955.0 7,447,643.0 165.0 0.0 -50.0 8.0
Ha2-63A 432 548,312.4 7,447,569.7 274.0 26.1 -54.0 20.0   Ha2-P8-6 525 547,955.0 7,447,663.0 144.0 0.0 -55.0 4.0
Ha2-63(1) 433 548,348.5 7,447,567.3 274.0 354.0 42.0 1.9   Ha2-P9-1 526 547,935.0 7,447,638.0 163.0 0.0 -90.0 2.8
Ha2-64A 434 548,298.0 7,447,599.5 260.0 8.1 -54.0 8.5   Ha2-P9-2 527 547,935.0 7,447,638.0 166.0 0.0 -55.0 8.0
Ha2-64B 435 548,298.0 7,447,599.5 260.0 174.6 43.2 10.7   Ha2-P10-1 528 547,915.0 7,447,637.0 163.0 0.0 -90.0 2.6
Ha2-65A 436 548,266.1 7,447,590.0 260.0 0.0 -55.0 11.6   Ha2-P10-2 529 547,915.0 7,447,659.0 143.0 0.0 -90.0 1.9
Ha2-65B 437 548,266.1 7,447,590.0 255.0 180.0 45.0 7.4   Ha2-P10-3 530 547,915.0 7,447,637.0 165.0 0.0 -57.0 8.0
Ha2-66B 438 548,270.6 7,447,627.1 236.0 159.3 50.0 9.1   Ha2-P10-4 531 547,915.0 7,447,659.0 145.0 0.0 -57.0 6.0
Ha2-67A 439 548,232.9 7,447,673.5 209.0 27.0 -54.0 5.2   Ha2-P11-1 532 547,895.0 7,447,633.0 165.0 0.0 -57.0 8.0
Ha2-67B 440 548,228.9 7,447,670.4 209.0 185.4 35.1 15.1   Ha2-P11-2 533 547,895.0 7,447,665.0 146.0 0.0 -65.0 6.5
Ha2-68A 441 548,220.0 7,447,618.0 250.0 14.4 -54.9 14.1   Ha2-P12-1 534 547,875.0 7,447,639.0 163.0 0.0 -90.0 1.9
Ha2-68B 442 548,220.0 7,447,618.0 250.0 178.2 39.6 14.1   Ha2-P12-2 535 547,875.0 7,447,638.0 165.0 0.0 -65.0 6.0
Ha2-69A 443 548,146.2 7,447,587.2 261.0 0.0 -57.6 5.6   Ha2-P12-3 536 547,875.0 7,447,666.0 147.0 0.0 -57.0 0.5
Ha2-69B 444 548,146.2 7,447,587.2 261.0 180.0 60.0 10.0   Ha2-P13-1 537 547,855.0 7,447,658.0 144.0 0.0 -90.0 1.7
Ha2-70A 445 548,582.2 7,447,514.8 330.0 342.0 -44.1 9.1   Ha2-P13-2 538 547,855.0 7,447,658.0 146.0 0.0 -66.0 5.5
Ha2-70B 446 548,572.2 7,447,516.7 330.0 165.6 54.0 15.2   Ha2-P13-3 539 547,855.0 7,447,642.0 165.0 0.0 -55.0 5.0
Ha2-71A 447 548,251.0 7,447,716.0 187.0 47.0 18.0 926.1   Ha2-P14-1 540 547,835.0 7,447,662.0 145.0 0.0 -90.0 2.0
Ha2-71B 448 548,251.0 7,447,716.0 188.0 47.0 22.0 480.0   Ha2-P14-2 541 547,835.0 7,447,662.0 147.0 0.0 -55.0 7.5
Ha2-72A 449 548,474.8 7,447,476.2 349.0 178.2 -63.0 4.0   Ha2-P14-3 542 547,835.0 7,447,637.0 166.0 0.0 -55.0 7.5
Ha2-72B 450 548,474.8 7,447,476.2 349.0 178.2 42.3 6.7   Ha2-P15-1 543 547,815.0 7,447,630.0 165.0 0.0 -55.0 5.0
Ha2-73A 451 548,494.8 7,447,478.5 349.0 5.4 -63.0 3.5   Ha2-P15-2 544 547,815.0 7,447,630.0 163.0 0.0 -90.0 2.0
Ha2-73B 452 548,494.8 7,447,478.5 349.0 185.4 45.9 8.4   Ha2-P17-1 545 547,775.0 7,447,640.0 166.0 0.0 -55.0 4.0
Ha2-74A 453 548,545.7 7,447,486.3 349.0 351.0 -63.0 1.5   Ha2-P22-1 546 547,675.0 7,447,757.0 62.0 180.0 55.0 4.0
Ha2-74B 454 548,545.7 7,447,486.3 349.0 171.0 42.3 13.6   Ha2-P23-1 547 547,655.0 7,447,615.0 165.0 0.0 -55.0 5.0
Ha2-76A 455 548,248.0 7,447,720.0 188.0 0.0 35.0 720.3   Ha2-P24-1 548 547,635.0 7,447,616.0 165.0 0.0 -55.0 4.0
Ha2-76B 456 548,248.0 7,447,720.0 188.0 0.0 37.6 854.0   Ha2-P24-2 549 547,635.0 7,447,680.0 119.0 180.0 55.0 4.0
Ha2-76C 457 548,248.0 7,447,720.0 187.0 0.0 33.0 896.3   Ha2-P25-1 550 547,615.0 7,447,644.0 145.0 180.0 55.0 4.0
Ha2-76D 458 548,248.0 7,447,720.0 188.0 358.0 34.0 460.6   Ha2-P28-1 551 547,555.0 7,447,680.0 122.0 0.0 -55.0 4.0
Ha1-36A 459 548,092.1 7,447,200.4 488.0 334.0 -50.0 17.6                  
Ha1-37A 460 548,092.1 7,447,200.4 488.0 334.0 -68.0 26.2                  
Ha1-38A 461 548,106.1 7,447,201.6 488.0 343.0 -63.0 23.0                  

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 47

 

Table 10-7. Drill Hole Collars – Sagmo

 

    Collar Coordinates (m)             Collar Coordinates (m)      
BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
  BHID
Original
BHID Easting Northing Elev'n Azimuth
(o)
Dip (o) Length
(m)
S-81A 1 542,639 7,445,138 359 270 61 47.8   S-68B 48 542,410 7,445,412 317 9 -20 160.3
S-81B 2 542,639 7,445,138 359 270 34 106.6   S-68C 49 542,410 7,445,412 317 9 -30 93.5
S-81C 3 542,639 7,445,138 359 270 18 170.0   S-68D2 50 542,407 7,445,414 317 319 -27 100.0
S-81D 4 542,639 7,445,138 359 270 7 208.3   S-68E 51 542,407 7,445,414 317 332 -18 145.9
S-81L 5 542,639 7,445,138 359 216 18 132.3   S-68F2 52 542,410 7,445,412 317 50 14 115.9
S-82B 6 542,669 7,445,124 359 90 -22 43.9   S-68G 53 542,410 7,445,412 317 72 -12 92.6
S-82C 7 542,669 7,445,124 359 90 -15 209.7   S-71A 54 542,668 7,445,243 354 270 90 5.4
S-82D 8 542,669 7,445,124 359 162 -12 70.0   S-71B 55 542,668 7,445,243 354 270 22 13.0
S-82E 9 542,669 7,445,124 359 128 -16 97.0   S-71C 56 542,668 7,445,243 354 270 58 7.8
S-83B 10 542,300 7,445,397 316 201 -19 95.4   S-71D 57 542,668 7,445,243 354 270 0 5.7
S-83C 11 542,303 7,445,397 316 174 -23 89.1   S-71E 58 542,668 7,445,243 354 270 36 9.0
S-83D 12 542,303 7,445,397 316 145 -22 104.3   S-72A 59 542,668 7,445,223 354 270 90 2.5
S-83E 13 542,303 7,445,397 316 205 -13 153.8   S-72B 60 542,668 7,445,223 354 270 9 5.6
S-235A 17 542,198 7,445,686 752 156 80 425.0   S-72C 61 542,668 7,445,223 354 270 41 9.7
S-235B 18 542,198 7,445,686 752 36 81 415.0   S-73A 62 542,667 7,445,203 354 270 90 3.0
S-67D 19 542,195 7,445,387 317 360 -54 90.0   S-73B 63 542,667 7,445,203 354 270 9 10.8
S-67E 20 542,195 7,445,401 317 358 23 98.3   S-73C 64 542,667 7,445,203 354 270 43 5.6
S-67F 21 542,195 7,445,401 317 360 -12 183.4   S-73D 65 542,667 7,445,203 354 270 30 20.0
S-67G 22 542,196 7,445,387 317 41 -31 77.5   S-74A 66 542,665 7,445,183 354 270 90 6.5
S-67I 23 542,194 7,445,391 317 303 29 69.0   S-74B 67 542,665 7,445,183 354 270 18 11.8
S-67J 24 542,195 7,445,392 317 335 -16 122.5   S-74C 68 542,665 7,445,183 354 270 48 10.5
S-67K 25 542,195 7,445,392 317 344 -12 154.4   S-75 69 542,665 7,445,183 354 90 -41 10.0
S-67L 26 542,199 7,445,389 318 193 -32 66.0   S-76A 70 542,659 7,445,163 354 270 90 9.6
S-67M 27 542,199 7,445,389 317 134 -23 78.1   S-76B 71 542,659 7,445,163 354 270 9 5.7
S-67N 28 542,199 7,445,389 317 173 -14 108.0   S-76C 72 542,659 7,445,163 354 270 45 13.5
S-67O 29 542,200 7,445,389 318 107 -20 128.0   S-76D 73 542,663 7,445,163 354 90 36 6.0
S-67P 30 542,199 7,445,389 317 135 -18 92.0   S-76E 74 542,683 7,445,163 354 270 90 8.0
S-43 31 542,539 7,445,386 313 270 -60 74.6   S-76F 75 542,659 7,445,163 354 270 60 17.7
S-49 32 542,352 7,445,407 317 270 -73 54.2   S-80A 76 542,691 7,445,516 352 54 -2 44.6
S-61A 33 542,632 7,445,395 314 270 -50 6.0   S-80B 77 542,687 7,445,517 352 333 40 20.0
S-61B 34 542,632 7,445,395 314 270 -55 12.0   S-80C 78 542,685 7,445,513 352 288 12 130.0
S-61C 35 542,632 7,445,395 314 90 -60 11.0   S-80D 79 542,685 7,445,513 352 270 5 214.3
S-65A 36 542,665 7,445,355 316 51 -51 70.0   S-80F 80 542,690 7,445,518 352 348 12 76.0
S-65B 37 542,665 7,445,355 316 25 -31 66.7   S-80I 83 542,690 7,445,518 352 17 0 137.7
S-65E 38 542,676 7,445,360 316 11 -16 146.7   S-80N 84 542,685 7,445,513 352 302 18 80.9
S-66A 39 542,304 7,445,404 316.4 358 -28 83.3   S-80O 85 542,685 7,445,510 352 234 27 101.4
S-66B 40 542,304 7,445,404 316.4 358 -18 115.1   S-81F 86 542,639 7,445,138 359 306 22 136.4
S-66D 41 542,302 7,445,403 316.4 321 -11 167.5   S-81K 87 542,639 7,445,138 359 248 14 186.4
S-66E 42 542,303 7,445,404 316.2 334 -10 199.8   S-204 88 541,196 7,445,758 652 53 75 419.6
S-67A 43 542,194 7,445,387 317 313 -19 97.5   S-206 89 541,337 7,445,862 664 353 86 451.6
S-67B 44 542,194 7,445,387 317 332 -12 164.1   S-236 90 542,209 7,445,830 755 44 68 386.8
S-67C 45 542,194 7,445,387 317 341 9 220.0   S-237A 91 542,097 7,445,706 743 162 78 435.0
S-67H 46 542,196 7,445,387 317 25 -22 100.0   S-237B 92 542,097 7,445,706 743 47 84 420.0
S-68A 47 542,411 7,445,413 317 25 -55 68.4                  

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 48

 

Table 10-8. Drill Hole Intersections – Rupsi-Dypet

[TRUETHK = True Thickness in metres]

 

BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE   BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE
1 399.2 402.2 3.0 2.9 4.42 0.25 2   140 635.0 656.0 21.0 18.7 0.93 0.04 8
1 485.2 495.0 9.8 9.4 1.40 0.20 3   141 516.0 519.2 3.2 3.0 0.64 0.05 6
3 413.0 414.0 1.0 1.0 0.70 0.17 2   141 540.8 551.2 10.4 6.9 0.39 0.09 7
3 439.0 445.9 6.9 6.7 0.77 0.01 3   141 562.0 568.0 6.0 5.4 0.37 0.00 9
3 452.0 456.0 4.0 3.8 0.94 0.07 5   155 16.1 24.4 8.4 4.8 3.06 0.42 6
4 547.5 559.0 11.6 11.4 1.23 0.23 2   156 28.3 36.4 8.1 2.8 2.10 0.48 6
5 536.0 539.0 3.0 3.0 0.94 0.02 2   158 94.6 111.1 16.6 2.1 3.45 0.65 6
6 576.4 579.9 3.4 3.1 1.18 0.51 2   159 38.0 48.3 10.3 0.2 8.00 1.51 6
8 625.0 628.6 3.6 3.2 6.82 0.65 2   162 71.3 80.4 9.2 2.3 1.16 0.13 9
8 676.0 681.8 5.8 5.1 0.42 0.03 5   167 34.2 40.4 6.2 1.5 2.39 0.75 6
9 380.5 381.5 1.0 1.0 2.06 1.42 2   168 32.4 42.0 9.6 3.0 4.23 0.44 6
10 692.7 704.0 11.3 11.0 0.71 0.64 2   168 149.4 151.5 2.1 0.8 5.26 2.81 8
10 712.0 716.0 4.0 3.9 0.68 1.54 3   169 87.0 123.7 36.7 9.7 1.81 0.14 6
10 721.0 741.0 20.0 19.3 1.05 0.64 5   169 221.3 230.0 8.8 3.3 2.82 0.49 8
11 785.0 786.0 1.0 1.0 0.31 0.01 2   170 29.0 39.5 10.5 3.7 2.55 0.29 6
12 725.0 735.0 10.0 9.5 0.42 0.08 2   176 62.6 65.4 2.8 1.4 2.04 0.49 8
12 740.0 741.0 1.0 0.9 0.30 0.07 3   187 34.0 38.0 4.0 2.2 1.38 0.28 6
12 752.0 802.0 50.0 47.1 0.54 0.13 5   187 92.1 93.7 1.7 0.9 4.31 0.38 8
19 337.3 339.3 2.0 1.9 0.66   3   188 116.0 118.8 2.8 0.7 0.67 0.06 6
20 319.1 323.8 4.7 3.9 1.17   2   188 128.4 135.0 6.7 1.4 0.73 0.06 9
20 387.9 392.2 4.3 3.2 1.13   3   189 60.0 76.2 16.2 5.3 0.93 0.18 6
20 397.6 400.0 2.4 1.8 0.71   5   189 131.6 133.9 2.3 0.6 1.49 0.92 9
41 24.9 31.0 6.1 6.0 0.47   9   189 153.5 157.0 3.5 1.0 0.66 0.02 9
42 24.1 26.6 2.5 2.4 2.17   6   189 189.0 193.0 4.0 1.2 0.36 0.06 8
61 0.0 13.9 13.9 5.0 2.80   6   189 202.0 204.3 2.3 0.7 1.86 0.02 8
61 75.3 76.4 1.1 0.3 5.10   9   190 53.7 61.4 7.7 2.8 1.93 0.33 6
63 0.0 3.8 3.8 0.1 1.99   7   190 105.2 107.0 1.8 0.1 3.09 0.38 7
63 65.0 66.4 1.4 0.0 1.96   7   191 65.0 86.3 21.3 3.5 1.95 0.46 6
64 15.4 16.5 1.1 1.1 0.80   7   191 172.5 174.2 1.6 0.3 3.52 1.41 6
66 19.3 22.8 3.5 3.2 1.17   6   192 117.6 146.4 28.8 5.7 0.55 0.21 6
66 45.3 48.3 3.1 2.8 0.49   9   192 244.9 252.3 7.5 1.6 1.31 0.39 7
68 15.7 19.3 3.6 3.4 2.17   7   192 289.7 323.0 33.3 7.2 0.90 0.21 7
68 28.0 29.4 1.4 1.3 0.72   9   193 130.0 139.6 9.6 1.7 0.60 0.23 6
89 86.2 159.0 72.9 0.2 2.10   10   214 329.7 333.0 3.3 0.2 0.77 0.68 10
91 261.5 264.7 3.2 0.1 5.12   10   214 342.0 344.0 2.0 0.1 0.32 0.01 10
92 147.6 178.5 30.9 1.6 1.71   10   215 114.4 131.0 16.6 3.2 1.40 0.31 10
93 124.7 132.0 7.3 0.3 0.34   10   218 166.3 181.0 14.7 1.3 4.74 1.07 10
135 559.0 563.0 4.0 3.6 1.97 0.03 6   250 384.5 396.2 11.7 10.7 0.61 0.19 2
135 569.1 572.5 3.4 3.0 3.38 0.05 9   251 347.4 351.6 4.2 3.6 1.99 0.80 2
137 637.0 638.0 1.0 0.9 0.44 0.01 6   253 248.7 254.4 5.7 5.3 0.49 0.23 2
138 607.0 611.0 4.0 3.6 0.41 0.02 6   254 265.8 274.5 8.7 8.6 0.64 0.20 3
138 621.0 622.6 1.7 1.5 1.38 1.03 9   255 268.6 277.2 8.6 8.4 0.48 0.14 3
138 646.0 661.0 15.0 13.5 0.63 0.03 8   257 440.3 455.2 15.0 14.6 0.74 0.26 2
140 614.5 616.0 1.5 0.9 2.09 0.72 7   260 430.1 435.0 4.9 4.7 0.57 0.19 2
                  264 479.2 489.3 10.1 9.6 0.49 0.13 2

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 49

 

Table 10-9. Drill Hole Intersections – Hankabakken II (1of 2)

 

BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE   BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE
123 137.6 163.7 26.0 8.6 1.30 0.02 3   341 0.0 7.0 7.0 6.9 0.75 - 2
125 140.3 152.8 12.6 3.0 1.11 0.02 3   342 0.0 3.1 3.1 3.0 1.48 - 3
130 139.0 142.0 3.0 0.5 0.64 0.01 3   344 2.0 5.0 3.0 2.9 0.77 - 3
130 156.9 160.0 3.1 0.5 0.55 0.03 3   345 0.0 2.0 2.0 2.0 1.10 - 2
130 202.5 209.0 6.5 0.9 1.47 - 2   347 0.0 1.8 1.8 1.8 1.22 - 5
213 236.7 270.0 33.3 15.5 0.38 0.09 3   348 3.5 6.5 3.0 2.9 1.05 - 2
213 278.0 284.0 6.0 2.9 0.81 0.15 3   349 0.0 1.0 1.0 1.0 1.20 - 2
272 134.0 138.1 4.1 3.9 0.71 0.05 2   351 10.6 12.0 1.4 1.4 0.93 - 2
273 89.3 101.6 12.3 11.9 0.88 0.01 2   355 0.0 1.8 1.8 1.8 1.14 - 2
274 97.0 108.0 11.0 10.2 0.81 0.01 2   356 5.6 7.9 2.3 2.3 0.57 - 3
275 113.7 119.7 5.9 5.0 0.54 0.05 2   358 3.4 7.7 4.3 4.2 0.83 - 2
276 77.3 86.9 9.6 8.9 0.72 0.01 2   361 0.0 14.7 14.7 3.8 1.02 - 2
277 88.4 90.6 2.3 1.9 0.66 0.01 2   364 0.0 5.5 5.5 4.7 1.61 - 2
294 67.1 80.9 13.8 13.6 0.47 0.12 2   365 7.0 31.0 24.0 11.9 0.77 - 2
295 105.0 106.7 1.7 1.1 0.48 0.00 2   366 0.0 5.0 5.0 4.0 0.89 - 3
295 110.9 113.0 2.1 1.3 0.47 0.24 3   366 10.0 21.7 11.7 9.4 1.13 - 2
296 120.0 138.0 18.0 11.5 0.60 0.08 3   368 285.2 288.0 2.8 0.4 0.44 - 2
297 100.0 102.4 2.4 1.7 0.45 0.08 2   368 294.6 314.4 19.8 2.6 0.95 - 2
298 29.2 34.8 5.7 3.7 0.94 0.01 2   369 244.0 245.9 1.9 0.5 0.49 - 3
299 23.3 28.4 5.2 4.6 0.98 0.01 2   369 256.0 258.0 2.0 0.5 0.54 - 3
300 19.4 31.1 11.7 11.7 1.21 0.07 2   369 263.0 273.0 10.0 2.5 0.50 - 3
301 47.0 65.8 18.8 15.4 0.87 0.13 2   371 110.0 125.0 15.0 5.3 0.52 - 2
303 33.6 47.9 14.3 11.9 0.66 0.10 5   371 129.5 167.0 37.5 14.6 0.48 - 3
304 56.2 59.3 3.1 0.9 1.01 0.30 5   373 552.0 554.0 2.0 0.9 0.40 - 2
305 102.7 109.0 6.3 0.7 1.03 0.14 5   377 5.0 6.0 1.0 1.0 0.31 - 5
306 50.2 60.5 10.3 10.1 1.13 0.06 2   378 0.0 9.0 9.0 8.9 0.45 - 5
306 65.0 70.0 5.0 4.9 0.43 0.41 3   379 1.7 9.0 7.3 7.3 0.36 - 2
308 40.3 47.0 6.7 6.7 1.22 0.05 5   380 0.0 13.0 13.0 12.9 0.57 - 5
308 55.7 58.3 2.6 2.6 1.01 0.24 2   381 2.0 3.0 1.0 1.0 0.48 - 2
310 90.3 92.4 2.1 1.7 0.82 0.06 2   382 9.8 11.7 1.9 1.8 0.31 - 2
310 98.3 102.5 4.2 3.4 0.53 0.21 3   383 0.0 2.3 2.3 2.2 0.72 - 3
312 103.4 115.5 12.1 8.4 0.50 0.10 2   386 5.0 10.6 5.6 5.3 1.00 - 2
322 262.0 264.0 2.0 1.5 0.35 0.04 2   388 0.0 7.9 7.9 7.7 0.82 - 2
322 275.0 281.3 6.3 4.7 0.68 0.12 3   389 0.0 6.8 6.8 6.7 0.98 - 2
323 237.0 245.0 8.0 7.6 0.63 0.17 2   390 0.0 2.5 2.5 2.4 2.16 - 3
324 4.0 7.0 3.0 2.1 0.53 - 2   391 12.5 19.6 7.2 5.1 1.75 - 2
325 0.0 12.0 12.0 11.4 0.44 - 2   391 24.5 27.6 3.1 2.2 0.35 - 3
326 0.0 13.0 13.0 12.1 0.70 - 2   392 55.5 62.5 7.0 1.8 1.14 - 2
327 0.0 19.0 19.0 17.7 1.10 - 2   392 69.6 75.0 5.4 1.3 0.40 - 3
328 0.0 21.0 21.0 20.0 0.96 - 5   392 81.0 83.0 2.0 0.5 0.72 - 3
329 0.0 16.5 16.5 15.7 1.74 - 5   392 88.3 90.7 2.4 0.6 0.86 - 3
331 43.4 56.0 12.6 12.2 0.64 - 5   393 24.5 36.5 12.0 5.1 1.15 - 2
334 5.0 15.0 10.0 8.5 1.69 - 2   393 40.7 44.0 3.3 1.3 0.67 - 3
336 0.0 2.0 2.0 1.8 1.16 - 5   394 0.4 2.2 1.8 1.8 0.56 - 2
338 6.8 8.0 1.2 1.2 0.65 - 2   398 33.4 46.3 12.9 3.6 0.87 - 2
339 0.0 4.5 4.5 4.5 1.08 - 2   398 53.6 55.0 1.4 0.4 0.40 - 2
340 1.5 3.0 1.5 1.5 0.69 - 3   398 65.7 67.8 2.1 0.6 0.50 - 2

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 50

 

Table 10-10. Drill Hole Intersections – Hankabakken II (2of 2)

 

BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE   BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE
399 16.3 20.0 3.7 2.3 0.76 - 2   457 877.7 881.0 3.3 0.1 1.46 0.26 2
400 0.0 8.4 8.4 8.3 0.32 - 2   458 443.9 450.4 6.5 0.1 0.38 0.36 2
401 3.0 11.2 8.3 8.1 1.13 - 3   459 14.4 17.0 2.7 2.6 0.48 - 2
402 4.0 8.9 4.9 4.8 2.12 - 2   461 15.1 21.5 6.4 6.3 0.41 - 2
404 0.0 6.0 6.0 6.0 0.39 - 2   462 17.6 19.8 2.2 2.1 0.36 - 2
405 0.0 9.3 9.3 9.3 1.01 - 3   465 26.7 31.6 4.9 2.2 0.40 - 2
406 6.0 8.0 2.0 2.0 0.32 - 2   475 0.0 4.8 4.8 4.6 0.67 - 2
408 0.0 3.0 3.0 2.9 0.55 - 2   476 0.0 2.2 2.2 2.2 0.92 - 2
409 8.8 10.0 1.2 1.2 0.54 - 2   507 0.0 2.5 2.5 2.0 0.80 - 3
410 5.8 7.8 2.1 2.0 0.31 - 3   509 0.0 2.8 2.8 2.3 0.80 - 3
411 13.6 15.4 1.8 1.8 1.22 - 2   510 0.0 6.0 6.0 6.0 1.54 - 2
412 2.7 4.6 1.9 1.9 0.82 - 3   511 0.0 2.0 2.0 1.6 1.30 - 2
413 0.0 2.0 2.0 2.0 0.66 - 2   512 0.0 5.0 5.0 4.1 1.60 - 2
416 5.4 12.4 7.1 7.0 0.40 - 2   513 0.0 6.5 6.5 5.3 2.00 - 2
417 37.2 40.7 3.5 0.9 0.41 - 2   514 0.0 2.5 2.5 2.0 0.80 - 2
417 56.9 58.3 1.4 0.4 0.39 - 2   515 0.0 1.5 1.5 1.2 0.90 - 3
418 260.3 263.4 3.1 0.2 0.83 - 2   516 0.0 2.0 2.0 1.6 0.90 - 3
420 0.7 3.2 2.5 2.4 0.39 - 2   517 0.0 8.0 8.0 8.0 1.25 - 2
423 1.0 3.4 2.3 2.3 0.35 - 2   518 0.0 2.4 2.4 1.9 2.70 - 3
423 10.9 12.0 1.0 1.0 - - 3   519 0.0 8.0 8.0 8.0 0.64 - 2
424 8.0 9.3 1.4 1.3 0.62 - 2   520 0.0 2.7 2.7 2.2 1.50 - 3
425 0.0 2.4 2.4 2.4 1.76 - 2   521 0.0 2.9 2.9 2.3 1.60 - 3
427 0.0 6.4 6.4 6.2 0.81 0.05 2   522 0.0 1.1 1.1 0.9 4.00 - 2
428 0.0 6.5 6.5 6.4 0.51 - 2   523 0.0 1.5 1.5 1.2 0.80 - 3
430 0.0 1.5 1.5 1.5 0.40 - 2   524 0.0 8.0 8.0 7.9 1.01 - 2
432 0.0 9.9 9.9 9.3 0.69 - 2   526 0.0 2.8 2.8 2.3 2.50 - 3
433 0.0 1.1 1.1 0.1 1.12 - 2   527 0.0 8.0 8.0 8.0 1.94 - 2
435 0.0 6.8 6.8 6.6 1.05 - 2   528 0.0 2.6 2.6 2.1 1.40 - 3
436 0.0 5.5 5.5 5.5 0.77 - 2   529 0.0 1.9 1.9 1.5 0.60 - 3
437 3.1 4.8 1.7 1.7 0.57 - 3   530 0.0 7.5 7.5 7.5 1.99 - 2
438 0.0 5.0 5.0 4.9 0.58 0.11 2   531 1.5 6.0 4.5 4.5 0.88 - 2
440 1.0 3.3 2.3 2.1 0.74 0.06 2   532 0.0 8.0 8.0 8.0 1.11 - 2
440 11.0 12.2 1.2 1.1 0.90 0.38 3   533 0.0 6.5 6.5 6.4 1.17 - 2
441 0.0 1.6 1.6 1.6 0.42 - 2   534 0.0 1.9 1.9 1.5 1.60 - 3
442 1.0 12.3 11.3 10.9 1.02 0.11 3   535 0.0 6.0 6.0 5.9 0.97 - 2
444 0.0 5.5 5.5 5.5 0.48 0.08 2   537 0.0 1.7 1.7 1.4 2.50 - 3
445 0.0 1.0 1.0 1.0 0.48 0.06 2   538 0.0 5.5 5.5 5.4 0.64 - 2
446 0.0 1.0 1.0 1.0 0.50 0.06 2   539 0.0 3.5 3.5 3.5 1.70 - 2
446 11.0 13.2 2.2 2.2 0.36 0.13 3   540 0.0 2.0 2.0 1.6 1.50 - 3
447 819.6 822.1 2.5 0.1 0.36 0.11 2   541 0.0 7.5 7.5 7.5 1.23 - 2
447 836.7 844.7 8.0 0.2 0.49 0.15 2   543 2.0 3.0 1.0 1.0 1.40 - 2
448 74.8 93.0 18.2 0.1 0.39 0.01 2   544 0.0 2.0 2.0 1.6 1.80 - 3
448 115.0 119.0 4.0 0.0 0.53 0.01 2   545 1.0 3.0 2.0 2.0 0.50 - 3
448 364.2 366.3 2.1 0.0 0.36 0.01 2   546 0.0 1.5 1.5 1.5 1.00 - 3
450 0.0 1.3 1.3 1.3 0.84 0.12 2   550 0.0 1.5 1.5 1.5 1.10 - 3
454 0.0 1.5 1.5 1.5 0.38 0.04 2                  
454 6.2 10.2 4.0 3.9 0.36 0.23 3                  

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 51

 

Table 10-11. Drill Hole Intersections – Sagmo

 

BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE   BHID FROM TO LENGTH TRUETHK Cu % Zn % ZONE
1 23.6 27.5 3.9 3.0 0.54 0.07 2   43 81.2 86.2 5.0 1.7 1.19 0.24 5
3 159.3 164.3 5.0 0.8 0.48 0.02 2   44 132.4 158.8 26.4 5.2 1.01 0.28 5
5 116.3 117.8 1.5 0.3 0.53 0.01 2   45 184.7 195.1 10.4 0.9 1.08 0.26 2
6 18.3 38.0 19.7 4.4 0.41 0.03 2   45 204.7 211.0 6.3 0.6 1.04 0.39 2
7 65.5 72.0 6.5 0.7 0.42 0.03 2   46 49.5 78.0 28.5 9.0 1.33 0.15 5
7 150.0 152.0 2.0 0.2 0.51 0.05 2   47 52.7 55.0 2.3 1.8 1.49 0.20 5
7 157.0 164.8 7.8 0.8 0.32 0.03 2   48 140.5 145.0 4.5 1.3 0.70 0.20 5
8 6.0 8.5 2.5 0.4 0.48 0.03 2   49 75.4 86.5 11.1 5.0 0.96 0.23 5
9 24.8 43.0 18.2 2.6 0.59 0.04 2   51 128.2 131.4 3.2 0.9 0.77 0.19 5
10 62.2 80.0 17.8 6.8 0.66 0.11 5   52 88.8 94.1 5.3 1.7 1.72 0.23 3
11 63.2 66.0 2.8 1.2 0.66 0.15 5   53 90.1 92.6 2.5 0.2 0.87 0.20 2
12 81.0 84.0 3.0 1.1 0.34 0.03 5   54 0.0 2.8 2.8 2.8 0.85 0.25 2
12 99.0 102.0 3.0 1.1 0.47 0.16 5   56 1.0 5.3 4.3 3.2 0.95 0.29 2
13 136.8 143.0 6.2 1.8 0.77 0.15 5   57 0.0 2.0 2.0 0.3 0.48 0.21 2
17 391.0 403.7 12.7 12.4 0.99 0.22 5   58 0.0 7.8 7.8 3.5 0.53 0.23 2
18 390.0 391.2 1.2 1.1 0.53 0.17 5   59 0.0 1.6 1.6 1.6 0.94 0.23 2
19 32.2 38.6 6.4 5.0 0.47 0.09 5   60 4.0 5.5 1.5 0.0 0.31 0.18 2
20 70.0 74.9 4.9 1.8 0.95 0.12 2   61 0.0 8.7 8.7 4.6 0.67 0.20 2
21 137.4 149.0 11.7 1.9 0.72 0.12 5   62 0.0 1.9 1.9 1.8 1.56 0.30 2
22 42.1 71.8 29.8 13.6 0.83 0.12 5   63 1.0 3.0 2.0 0.0 0.70 0.12 2
23 55.3 57.9 2.6 0.9 0.90 0.12 2   64 0.0 4.3 4.3 2.4 0.99 0.23 2
24 100.8 103.6 2.9 0.7 1.21 0.12 5   65 0.0 18.0 18.0 6.5 1.30 0.20 2
25 126.3 135.1 8.9 1.6 0.89 0.09 5   66 0.0 5.6 5.6 5.5 0.90 0.10 2
26 42.6 57.6 15.0 8.6 0.88 0.10 5   67 0.0 10.0 10.0 1.6 1.11 0.12 2
27 46.2 66.9 20.7 7.8 1.08 0.17 5   68 0.0 10.0 10.0 6.3 1.15 0.13 2
28 80.0 104.0 24.0 6.6 1.09 0.12 5   70 0.0 8.4 8.4 8.3 0.59 0.06 2
29 41.2 63.5 22.3 6.7 1.00 0.16 5   71 2.0 4.0 2.0 0.0 0.43 0.06 2
29 91.6 92.6 1.0 0.3 1.23 0.09 5   72 0.0 6.0 6.0 3.5 0.36 0.07 2
30 59.3 80.0 20.7 6.2 1.42 0.11 5   74 0.0 7.0 7.0 6.9 0.67 0.08 2
32 35.0 39.1 4.1 3.9 1.81 0.15 5   75 4.0 16.0 12.0 9.3 0.47 0.08 2
34 0.0 10.4 10.4 9.4 1.69 - 3   76 7.5 17.2 9.7 0.8 0.73 0.15 2
36 47.3 70.0 22.7 15.8 1.60 0.24 2   77 10.7 12.3 1.6 0.9 1.33 0.24 2
37 39.0 51.1 12.1 6.0 1.60 0.22 3   78 93.5 96.1 2.6 0.1 1.62 0.09 2
38 126.9 146.7 19.8 5.1 1.34 0.24 2   79 203.1 211.3 8.2 0.6 1.02 0.15 2
39 79.7 83.3 3.6 1.6 1.07 0.23 5   80 57.3 63.9 6.6 1.0 0.50 0.06 2
40 111.0 115.1 4.1 1.1 0.96 0.23 5   83 22.7 38.4 15.7 0.5 1.22 0.19 2
41 138.9 165.7 26.8 5.2 1.25 0.14 5   84 63.7 66.1 2.4 0.4 0.96 0.12 2
42 162.4 174.4 12.0 1.9 0.90 0.26 5   91 397.0 399.8 2.8 2.7 0.56 0.11 5
                  92 386.0 388.8 2.8 2.8 0.74 0.14 5

 

Figure 10-1. Overall Plan of Drill Holes

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 52

 

Figure 10-2. Drillholes’ Section – Rupsi Dypet

[Section Lines shown in Figure 10-1]

 

 

Figure 10-3. Drill Holes’ Section -Hankabakken II

 

 

Figure 10-4. Drill Holes’ Section – Sagmo

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 53

 

11SAMPLE PREPARATION, ANALYSIS AND SECURITY

 

11.1Observations

 

There was a thorough review by the Author of available information from NSG on the Sulitjelma Project that yielded very little quality control and quality assurance (“QAQC”) data. Similarly, the Author discovered that there is little information available regarding sample preparation, laboratory analytical procedures, including the performance standards, blanks and duplicates for QAQC. This means that there is also no information available about chain of custody security procedures from the historic drilling activities; however, it is presumed that the prior operators conducted both sampling of the drill core and used analytical procedures in accordance with the industry best practices, based on the information presented here in Section 11 below.

 

In terms of sample collection, it can be seen from the remaining Sulitjelma Project drill core at Lokken that sampling was focused on mineralised intersections for the most part, with the initial samples being taken by sawing of the drill core in half and leaving the remnant half core in the core box for record keeping and future review.

 

The fact that so much of the Sulitjelma Project drill core is still in reasonable condition at Lokken, demonstrates the sound safeguarding procedures which must have been in place when the original samples were taken by prior operators.

 

Core diameters, as summarised in Error! Reference source not found., range from 22 mm t o 36 mm (BQ). For the current database, a histogram of sample lengths is shown in Figure 11-1.

 

Figure 11-1. Histogram of Drilling Sample Lengths

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 54

 

 

It can be seen from this histogram most of the samples have been taken with a 1 m length, and a lower number at 0.5 m, 2 m and 3 m. There is also a spread of intermediate sample lengths.

 

There are no records that can be provided by NSG describing the assay methods used; however, from examination of the compiled assay databases, the limits of detection can be inferred by the Author, and these detection limits are summarised in Table 11-1.

 

The NGU inventory in Lokken, where all the remaining Sulitjelma Project drill core is currently stored, is a well maintained and secure facility; however, there does not appear to be any storage of sample rejects or pulps.

 

Table 11-1. Summary of Limits of Detection

 

Element Value Unit
Cu 0.01 %
Zn 0.01 %
Pb 0.01 ppm
S 0.08 %
Fe - %
Au 0.01 ppm
Ag 0.1 ppm

 

The absence of QAQC standards, blanks and duplicates, as well as the lack of analysis, does of course provide a risk for the available drill hole databases. This is discussed in more detail in section 25.1.3 with respect to putting in place mitigative measures moving forward.

 

Figure 11-2. Photo of NGU Core Storage Facility – Lokken

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 55

 

11.2 Overview

 

The sample preparation methods and QAQC measures used could not be validated or verified by the Author, owing to the lack of documentation and other information related to sampling activities (1952-1988) connected with the drilling databases used in the current study by prior operators.

 

Similarly, the assaying and analytical procedures could also not be validated or verified by the Author, owing to the lack of recorded information relating to the laboratories used by prior operators. Owing to the time lapsed after mine closure, the laboratory equipment cannot be inspected by the Author.

 

The nature, extent and results of QAQC procedures could not be validated or verified by the Author, owing to the lack of related information available on standards, blanks and duplicates, and their statistical analysis.

 

However, in the Author’s opinion, there is adequate confidence in the sampling, data collection and processing, which is sufficient for mineral resource estimation work that is completed in the current study. The Author’s opinion is supported by the following points:

 

·The mine’s production history (as summarised in Section 6.1).

 

·The significant amount of properly stored drill core still in reasonable condition at Lokken, demonstrating the sound procedures that must have been in place when the original samples were taken.

 

·Any verification steps made by the Author of available plans, sections and geologists’ notes relating to the sample data.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 56

 

12 DATA VERIFICATION

 

During the site visit to Sulitjelma Project, numerous data verification steps were completed by the Author including the following:

 

·The site visits to Sulitjelma in December 2024, including both surface and underground reviews.
·A review of example Sulitjelma Project drill core at the NGU core storage in Lokken.
·A review of surface drill collar elevation data relative to surface topography data.
·A review of drill hole database integrity with respect to transcription errors from source materials.
·It is noted that additional reviews of drill hole databases against historical mine plans and cross-sections provided further validation of information.
·The analysis of density measurements of samples from drill core

 

12.1 Site Visit

 

The Author’s site visit on 2nd December 2024 covered the following:

 

-Visiting NSG’s head office in Fauske, Norway.
-Inspection of underground workings, including Rupsi tunnel and old stopes.
-Inspection of former Process Plant buildings at Sandnes (east end of lake).
-Visiting the museum facilities and inspection of the tunnel at the historical Giken mine.

 

In the Author’s opinion, the Rupsi tunnel is in very good condition. Copper mineralisation is visible on many walls near the stope excavations, as is the nature of the tight ductile folding. The stope workings are also accessible, the remnant pillars clearly visible. It seems likely that it would be possible, with enough time, to enter much further into the old workings and the check the location of some old drill hole collars. The tunnel into the historical Giken mine also appears to be in very good condition, having a working rail track, so that it can be used as a tourist destination for trips underground with a mine tram car in the summer months.

 

The existing processing building also appear to be in reasonable condition.

 

Unfortunately, due to snow cover at the time of the site visit to Sulitjelma Project, it was not possible to review the position of any historical surface drill hole collars in the field. See Item 12.3 for additional information regarding the validation and verification of drill collar locations.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 57

 

Figure 12-1. Pictures – Underground at Rupsi

[Upper Left: Entrance to Rupsi Tunnel; Upper Right: Old Chute,
Lower Left: Along Rupsi Tunnel; Lower Right: Old Stoped Workings]

 

 

 

Figure 12-2. Surface Infrastructure - Former Processing Facilities

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 58

 

Figure 12-3. Looking Westwards from Giken Mine

 

 

 

Figure 12-4. Looking Southward towards Former Sagmo Mine Area

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 59

 

12.2 Drill Hole Core Validation

 

The Author reviewed was made of drill hole core stored the NGU core storage facility at Lokken. A total of 9 drill holes were selected randomly for review, all of which are part of the database used in the current resource estimation work. Historical drill hole logs and other drillhole information are stored in the NGU facility at Lokken or at NSG’s offices in Fauske. The logs are in different forms, including typed out tables, pro-forma tables filled in by hand, hand-written notes and geological sections. Most of the data now available in Excel form corresponds with scanned copies of the original drill hole information.

 

The drill holes selected for review in the latest site visit came from the Rupsi, Hankabakken and Sagmo mines. Example photos from this review, with some key features highlighted, are shown in Figure 12-5 to Figure 12-7.

 

The Author’s observations from this review process include the following:

 

·The inventory of Sulitjelma Project drill hole core stored at Lokken appears to be generally accurate according to the available historical information. All drill holes requested, and their related core boxes could generally be found by the staff at Lokken.

 

·Some of the drill holes, mainly for waste intersections, have been reduced to “compressed” sections, in that 10cm of core has been taken from each metre of the original core, so boxes with a 10m length are representing 100m of actual drill core. This modification is recorded at the core inventory in a ‘%core available’ column.

 

·For some of the previously sampled intersections, there is no core left. The most likely explanation is that the original core was too small and/or friable to allow sawing, or due to additional samples being taken from the same intersections.

 

·For the sampled intersections with higher-grades, where the core is cut, it is still available for review, and it corresponds well with observations of sulphide mineralisation, generally pyrite and chalcopyrite.

 

·Rounded pyrite crystals are seen in many intersections, which is a very distinctive texture of the mineralisation at the Sulitjelma Project.

 

·Some of the sampled intervals are very short in the opinion of the Author, but in many instances, there is lot of apparent mineralisation that has not been sampled, which could be an opportunity for Blue Moon moving forward. This may be a function of the high cut-offs used historically when the mines were in production previously.

 

·The digitally logged lithology codes appear to correspond reasonably well with the Author’s observations of the selected drill core being reviewed in their core boxes.

 

·Most of the core boxes retrieved for the core review were in good condition. However, it was observed that some of the boxes appear to have been left open and as a result, the drill core appears to be in bad condition and extremely dirty. For any detailed relogging exercise, the drill core would need to carefully clean, and it may not be possible in some cases due to the deterioration and heavy staining.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 60

 

Figure 12-5. Hole RUP-168

[From 620 m – To 630m]

Many sulphidic intersections outside of sampled intersections

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 61

 

Figure 12-6. Hole RUP-136

[From 540m to 550m]
Logged as Chlorite-Breccia

 

 

 

Figure 12-7. Hole RUP-137

[ From 570m to 9 580m]
Red Blocked out portion = 3m averaging 1.28% Cu, logged as Massive Sulphide

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 62

 

12.3 Collar Data Validation

 

There are 48 surface drill holes in the Rupsi and Sagmo regions that were used in the current mineral resource estimation. The database collar elevations were compared by the Author with check elevations obtained from the reference National Height Model data, stemming from laser scanning and image matching (Hoydedata.no from 2016 and 2019). These elevation differences, either positive or negative, are summarised in Figure 12-8. An analysis by the Author shows that the median and mean differences are close to zero, indicating an absence of bias. However, the lowest 10% of the population are -7.5 m below and top 10% exceed by 4.5m the median and mean values.

 

Figure 12-8. Histogram of Check Collar Elevation Differences – Rupsi and Sagmo

 

 

 

For the Hankabakken II region, the supplied data of the 63 surface, drill hole collars had incorrect elevation data, stemming from use of a wrong topographic model. For the updated mineral resource estimation described in this report, the drill hole collar elevations were set to the elevations derived from the National Height Model data.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 63

 

12.4 Database Validation

 

Various examples of the original drillhole logs were checked by the Author against the corresponding database entries, going back as far back as data originally created in 1962. The assay and lithology data did correspond reasonably well, validating that the data has been adequately transposed from the log sheets to the database.

 

During data verification steps completed by the Author, involving the import and desurveying of drill hole data for Rupsi, Dypet, and Hankabakan deposits, the only errors were as follows:

 

·The Author discovered that there was no survey data for holes 6 drill holes, out of a total of 518 drill holes. These holes without survey data were subsequently excluded.
·There was no lithology data for 62 Hankabakken holes. In cases where no lithology data was available, grade data only was used for interpretation purposes by the Author.

 

For the Sagmo deposit, the only errors identified by the Author were as follows:

 

·There was no survey data for two drill holes (81 and 82), out of a total of 89 drill holes; these two holes were therefore excluded.
·For drill hole lithology information, only 1 drill hole was lacking data.
·Three of the holes had assays, yet did not have corresponding drill collar information and downhole survey data. These holes were subsequently excluded.

 

The Author completed further validation and verification steps of database integrity through operations including:

 

·Range checks., on coordinate and Cu grade values.
·Drill hole combination reports. .
·Statistical analysis
·Visualisation and plotting.

 

The drill hole combination reports list out in detail all the data from each hole for each of the different files involved in combination and desurveying (determination of 3D sample positions) of all drillhole data.

 

The Author conducted visualisation and plotting checks including the generation of sections from the processed drillhole data and comparing these with the original hand-drawn profiles.

 

The assay database contained 3,728 samples, but these only contained Cu and Zn assays for the most part. Approximately 25% of the samples in the database had a reported Ag value in g/t or oz/t. For the mineral resource estimation process, the Author focused on Cu and Zn.

 

12.5 Drill Hole Data Validation

 

The Author conducted checks of the underground drill hole data against historical underground level and stope plans, as shown in the examples in Figure 12-9 to Figure 12-11. These historical plans showed a good correspondence with the underground collar positions in the digital database.

 

Drill hole and topographic data were also checked by the Author against historic hand-drawn profiles, as shown in Figure 12-12 and Figure 12-13. These comparisons also showed good correspondence.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 64

 

Figure 12-9. Plan of Underground Drill holes vs Historical Map - Rupsi

 

 

 

Figure 12-10. Plan of Underground Drill holes vs Historical Map - Sagmo

 

 

 

Figure 12-11. Plan of Underground Drill holes vs Historical Map - Hankabakken

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 65

 

Figure 12-12. Historic Profile

 

 

 

Figure 12-13. Profile 6 with Imported Data

[Section also shows interpreted model in the current estimation]

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 66

 

12.6 Density Validation

 

The Author completed an analysis of recent density measurements of drill core from Sulitjelma Project. The density sample measurements stemmed from different lithologies as well as including both mineralised material and waste. Samples were tested from each of the different deposits being evaluated. . A summary of these density measurements is presented in Table 12-1.

 

The average density value obtained from these measurements helped to verify for the Author the global density value of 3 t/m3 that had been applied previously in the mineral resources estimation work.

 

Table 12-1. Summary of Check Density Measurements

 

SampleID BHID Box (m) FROM Cu % Density
      (m)   t/m3
1 RUP_136 536-539 536.5 0.52 2.96
2 RUP_137 570-580 572.5 - 2.97
3 RUP_137 570-580 578.75 1.24 2.90
4 RUP_128B 390-400 399.45 - 2.87
5 RUP_128B 390-400 399.55 - 2.79
6 RUP_130 430-440 439.45 0.38 2.76
7 RUP_130 470-480 474.5 0.61 2.83
8 RUP_130 470-480 475.4 0.29 2.77
9 RUP_130 470-480 476.2 0.96 2.83
10 HANK_184A 40-50 40.8 - 2.98
11 HANK_184F 100-110 100.3 1.09 3.20
12 HANK_184F 100-110 107.4 0.96 2.84
13 Sagmo_67G 40-50 43.9 2.19 3.33
14 Sagmo_67G 40-50 47.3 0.49 3.83
15 Sagmo_67H 50-60 52.3 2.66 3.62
16 Sagmo_67H 50-60 57.5 - 2.81
        Average 3.02

 

12.7 Overview

 

The data verification procedures applied by the Author are described in sections 12.1 to 12.6 above.

 

Some limitations were encountered were verification:

 

·Drillhole Collars and Surveys. The Author could not independently verify any drillhole collars or orientation, owing to limited underground access during the mine visit, as well as snow cover during his visit preventing any checks of surface drillholes. However, the Author has used checked the supplied collar data against reference National Height Model data, and has checked hole traces on available historic plans and sections against desurveyed data from the supplied database. This has led the Author to believe that the supplied collar and survey data are adequate for resource estimation purposes, as described in this report.

 

·Sample Assays. The Author has been able to verify the database assay data, in terms of transposing data from the information on typed or hand-written logged sheets. However, there are no assay certificates available or information that allow verification of the procedures, protocols or standards of the laboratories used. Similarly, there are no records of the method of sample preparation. This means that the Author cannot fully verify the database assay data. However, it must be remembered that these sample assays were all created during a period of continuous mine production. There is recorded production of ore from all of the areas covered by the drilling used in the current estimate. This has led the Author to believe that the supplied assay data are adequate for resource estimation purposes, as described in this report.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 67

 

13 MINERAL PROCESSING AND METALLURGICAL TESTING

 

There is very little information regarding the historical processing facilities. However, Table 13 -1 shows a summary of the mill and process plant production from 1984. This summary shows a plant recovery for Cu of 97.5% in 1984.

 

Table 13-1. Summary of 1984 Mill Production

 

Product Tons % Cu % Zn % S Tons Cu Tons Zn Tons S Recovery %
Mill Feed 450,000 1.69 0.45 18.0 7,605 2,025 81,000  
Cu concentrate 25,136 29.50 1.25 34.1 7,415 314 8,571 97.5
Zn concentrate 1,610 1.40 51.0 32.7 22.5 821 526 40.5
S concentrate 118,428 0.03 0.20 51.0 35.5 237 60,398 74.6
Tailings 304,826 0.04 0.21 3.77 121.9 640 11,492  

 

More recent flotation testwork was completed by SGS Mineral Services in 2020, and these metallurgical results sent to Sarb Consulting (“Sarb”). The testwork results were used by Sarb in their own study to assess the environmental geochemical effects of potential tailings disposal in Langvatnet.

 

A flotation program was completed on a sample from Sulitjelma, in order to develop a flotation flowsheet and produce flotation tailings for long-term sub-water leach testing. Five rougher tests and three cleaner tests were performed and flotation results were obtained. The testwork was completed at SGS Vancouver Metallurgy, and included sample preparation, flotation, and product characterization.

 

A photograph of this sample is shown in Figure 13-1. This 36kg of material was collected from wall rock in the old Dypet mine, with average grades of 3.44%Cu and 0.5%Zn.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 68

 

Figure 13-1. Photograph of As-Received Sample- for SGS Flotation Testing

 

 

 

The sample was stage-crushed to -10 mesh, homogenized, split into 2 kg test charges, and preserved in a freezer prior to flotation. A head sample was submitted for an ICP-Scan and whole rock analysis (WRA). The sample was massive sulphide material and assayed 3.44% Cu, 0.5% Zn, 33% Fe, and 35.4% S.

 

Five rougher flotation tests were performed to optimize the flotation conditions in order to maximize the copper and zinc recovery into separate concentrates. The tests were performed at a primary grind size k80 of approximately 140 µm. Lime was added in both the copper and zinc circuits to increase the pH and depress pyrite. Collectors 3418A, SIPX, and 5100 were tested in the copper flotation while SIPX and 3894 were tested in the zinc flotation. Zinc sulphate was used to depress sphalerite in the copper circuit while copper sulphate was used to re-activate sphalerite in the zinc circuit.

 

Three cleaner tests were completed by employing the same flotation conditions. The first test was performed to confirm the flotation results while the other two tests were completed to produce tailings for environmental testwork. The overall test flotation flowsheet is presented in Figure 13-2.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 69

 

Figure 13-2. Test Flotation Flowsheet

 

 

 

SGS concluded that, based on the supplied sample, the material responded well to a conventional, sequential copper/zinc flotation flowsheet. Under the conditions established in open circuit flotation tests, copper recoveries of 90-95% can be expected for a concentrate grade of approximately 30% Cu can be expected, along with a zinc recovery of 50-55% for a concentrate grade of 45-50% Zn. Zinc “loss” to the copper concentrate was approximately 30%.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 70

 

14 MINERAL RESOURCE ESTIMATE

 

14.1 Data Collation

 

The mineral resource estimation for this report was based on all available drill hole data. A summary of the current drill hole database is shown below. Plans and 3D views of the data are shown in Figure 14-1 to Figure 14-5.

 

Table 14-1. Summary of Drill hole Database

 

Region   Holes Length Average Samples
  Length/ Hole  
Name Code   m m  
Rupsi/Dypet RD 260 50,277 193 1,908
Hankabakken II H2 254 18,429 73 1,380
Sagmo SM 87 9,438 108 440
Total   601 78,144 130 3,728

 

Figure 14-1. 3D View of All Drill holes, Looking North-West

 

 

 

Figure 14-2. Plan Plot of Drill holes

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 71

 

Figure 14-3. 3D View of RD Drill holes – Looking North-West

 

 

 

Figure 14-4. 3D View of H2 Drill holes – Looking North-West

 

 

 

Figure 14-5. 3D View of SM Drill holes – Looking North-West

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 72

 

14.2 Interpretation

 

The interpretations of most of the VMS mineralization was made using the following procedure:

 

1.Identification of possible intersections, based on a cut-off of 0.36% Cu over length of 1 m, as well as marked lithological differences.
2.Interpretation of strings connecting VMS mineralization composite centres, with similar orientations and geometries to those shown on supplied geological profiles.
3.Assignment of a ZONE, to discriminate the different VMS mineralization.
4.Generation of DTMs describing VMS mineralization centrelines.

 

The Author noted the following difficulties with the interpretation:

 

·Erratic and sporadic layout of holes.
·Few specific geological characteristics to assist with vein identification.
·Many underground holes have very poor intersection angles.

 

Plans and 3D views of the vein centre DTMs are shown in Figure 14-6 to Figure 14-7 as well as Figure 14-10 to Figure 14-13. In the Rupsi-Dypet (“RD”) deposits, there are 8 separate zones have been interpreted, 3 zones in each the Hankabakken II (H2) deposit, and another 3 zones in Sagmo deposit (“SM”). Most of the boundaries of mineralization are extremely sharp, with much lower grades or unsampled core outside of the flagged intersections.

 

The lithology log data was used to create LeapFrog Geo (version 5.0.3) models of the principal lithologies. Example sections of the RD zone, for the interpreted mineralised zones with respect to local geology, are shown in Figure 14-8 and Figure 14-9.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 73

 

Figure 14-6. RD – Plan of Interpreted Veins

 

 

 

Figure 14-7. 3D View of RD Interpreted Veins, Looking South-West

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 74

 

Figure 14-8. Overall S-N Section Through RD Region

 

 

 

Figure 14-9. S-N Section Through RD Mineralised Zones

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 75

 

Figure 14-10. Plan of H2 Interpreted Zones

 

 

 

Figure 14-11. 3D View of H2 Interpreted Zones, Looking South-West

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 76

 

Figure 14-12. Plan of SM Interpreted Zones

 

 

 

Figure 14-13. WE Long-Section of SM Interpreted Zones

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 77

 

 

 

14.3 Exploratory Data Analysis

 

A statistical summary of the mineralized samples, captured within the interpretation limits of the wireframes, is shown in Table 14-2. Log-probability plots of these captured samples, for each deposit, are shown in Figure 14-14 to Figure 14-15, for Cu and Zn, respectively. Most of these are showing close to log-normal distributions.

 

Table 14-2. Statistical Summaries – Interpreted Samples

  FIELD ZONE NUMBER MIN MAX MEAN VARIANCE STANDDEV COVARTN% PCTL10 PCTL50 PCTL90
  Cu_pct 2 71 0.14 16.82 1.01 1.87 1.37 135.5 0.30 0.67 3.85
  Cu_pct 3 26 0.19 4.24 0.84 0.34 0.58 69.3 0.28 0.62 1.47
  Cu_pct 5 78 0.00 3.76 0.68 0.41 0.64 93.8 0.09 0.52 1.48
  Cu_pct 6 99 0.14 11.45 2.18 4.99 2.23 102.5 0.35 1.47 4.67
  Cu_pct 7 37 0.07 17.49 1.14 2.02 1.42 125.0 0.21 0.88 4.32
  Cu_pct 8 26 0.03 15.66 1.48 4.00 2.00 135.0 0.32 0.86 5.24
  Cu_pct 9 24 0.02 5.41 1.08 1.15 1.07 98.9 0.17 0.78 3.23
  Cu_pct 10 53 0.27 14.18 2.07 3.63 1.91 92.3 0.34 1.56 5.57
RD Cu_pct All 414 0.00 17.49 1.56 3.36 1.83 117.2 0.27 0.86 4.18
  Zn_pct 2 68 0.01 1.81 0.29 0.09 0.30 103.0 0.06 0.22 0.63
  Zn_pct 3 17 0.01 2.35 0.35 0.33 0.57 166.0 0.03 0.20 1.62
  Zn_pct 5 78 0.03 2.19 0.25 0.19 0.43 173.0 0.04 0.12 0.40
  Zn_pct 6 90 0.01 2.20 0.37 0.19 0.43 115.2 0.08 0.22 1.24
  Zn_pct 7 29 0.03 1.47 0.23 0.05 0.23 100.2 0.05 0.22 0.79
  Zn_pct 8 26 0.01 2.81 0.23 0.32 0.56 244.9 0.02 0.06 0.89
  Zn_pct 9 16 0.00 5.57 0.17 0.22 0.47 272.1 0.00 0.09 1.21
  Zn_pct 10 18 0.01 2.57 0.58 0.48 0.69 120.1 0.04 0.44 1.88
  Zn_pct All 342 0.00 5.57 0.32 0.20 0.45 143.6 0.04 0.18 0.95

 

  FIELD ZONE NUMBER MIN MAX MEAN VARIANCE STANDDEV COVARTN% PCTL10 PCTL50 PCTL90
  Cu_pct 2 564 0 7.75 0.88 0.60 0.77 87.6 0.27 0.65 1.88
  Cu_pct 3 212 0 3.77 0.82 0.38 0.62 75.7 0.19 0.55 1.45
  Cu_pct 5 83 0.2 8.60 1.03 1.34 1.16 113.0 0.27 0.66 1.74
H2 Cu_pct All 859 0 8.60 0.88 0.61 0.78 89.2 0.25 0.62 1.80
  Zn_pct 2 111 0 0.68 0.08 0.01 0.11 131.0 0.01 0.04 0.22
  Zn_pct 3 63 0 7.00 0.24 1.00 1.00 414.7 0.02 0.07 0.28
  Zn_pct 5 13 0 0.36 0.12 0.01 0.09 81.5 0.04 0.10 0.31
  Zn_pct All 187 0 7.00 0.14 0.39 0.62 432.1 0.01 0.05 0.28

 

  FIELD ZONE NUMBER MIN MAX MEAN VARIANCE STANDDEV COVARTN% PCTL10 PCTL50 PCTL90
  Cu_pct 2 169 0.08 13.10 0.95 1.31 1.14 119.9 0.34 0.79 1.62
  Cu_pct 3 17 0.64 3.12 1.65 0.60 0.77 46.8 0.68 1.51 2.45
  Cu_pct 5 182 0.10 3.20 1.00 0.34 0.58 58.3 0.46 0.85 1.79
SM Cu_pct All 368 0.08 13.10 1.01 0.80 0.89 88.9 0.39 0.81 1.78
  Zn_pct 2 169 0.01 0.47 0.15 0.01 0.10 66.4 0.04 0.15 0.29
  Zn_pct 3 9 0.15 0.28 0.22 0.00 0.04 18.6 0.14 0.23 0.27
  Zn_pct 5 182 0.02 0.40 0.15 0.01 0.08 50.4 0.07 0.15 0.25
  Zn_pct All 360 0.01 0.47 0.15 0.01 0.09 57.2 0.05 0.15 0.27

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 78

 

Figure 14-14. Log-Probability Plots of Cu Samples Within Interpreted Zones

 

 

 

Figure 14-15. Log-Probability Plots of Zn Samples Within Interpreted Zones

 

 

 

Point plots of Cu vs Zn assays, on logarithmic scales, are shown in Figure 14-16. These show generally a positive correlation, with higher grades of Cu generally being accompanied by higher grades of Zn, particularly for RD and SM.

 

Figure 14-16. Point Plots of Cu vs Zn Grades

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 79

 

For each of the drill hole intersections, the true thickness was calculated, based on the average dip and dip direction of each zone. These derived true thickness values are plotted as histograms in Figure 14-17. All these distributions are skewed, with most of the thicknesses being below 5m, also with additional high thickness values. This reflects the sporadic thickening of the zones.

 

Figure 14-17. Histograms of Vein True Thickness Values

 

 

 

Histograms reflecting the different sample lengths used for each zone are show in Figure 14-18. For SM, fewer samples greater than 3m long were used in SM, with most of the samples being 0.5, 1m or 2m. For RD and H2, most of the samples taken were either 0.5m or 1m. It is evident that in general samples were broken on lithological breaks. Within consistent lithologies, it is not clear how the basic sample length was decided. But it must be remembered that the drill hole database covers a long historic interval of 36 years, which many changes in geological personnel.

 

Figure 14-18. Sample Length Histograms by Zone

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 80

 

14.4 Compositing

 

Samples within the interpreted zones were examined for outlier grades, using log-probability plots and decile analyses. This process enabled reasonable outlier levels to be determined, as summarised in Table 14-3. The results were applied as capping levels to the identified zone samples, prior to creating composites. In the case of RD and H2, 5 m downhole composites were created. The composite lengths were slightly variable to be the same lengths across each intersection. This is because parts of these zones are thicker than 5 m, so cross-mineralization composites would not provide enough detail for grade estimation into the mineral resource. For SM, only cross-mineralization composites were created, as the apparent true thickness is seldom above 10m.

 

Table 14-3. Top-Cut Levels
REGION Cu % Zn %
RD 10 2
H2 4 0.7
SM 3.5 -

 

After the composites were created, an apparent true thicknesses for mineralization were determined, based on the drill hole orientation and the general orientation of each zone. The zone orientations are summarised in Table 14-4Table 14-5.

 

Table 14-4. Zone Orientations
REGION ZONE Dip Direction Dip
  2 20 16
  3 20 17
  5 20 18
  6 20 24
RD 7 20 50
  8 20 25
  9 20 27
  10 10 30
  2 353 35
H2 3 354 36
  5 348 34
  2 276 9
SM 3 291 11
  5 234 4

 

A summary of the compositing parameters is shown in Table 14-5.

 

Table 14-5. Compositing Parameters
  Minimum Minmum
REGION Gap Composite Length
  m m
RD 0.1 5
H2 0.1 5
SM 0.1 Intersection

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 81

 

14.5 Geostatistics

 

Statistics from the generated composites are shown in Table 14-6 to Table 14-8. Log-probability plots of the composite grades are shown in Figure 14-19 and Figure 14-20. Cu variograms for the RD and H2 composite data are shown in Figure 14-21 and Figure 14-22. The experimental variograms indicate a range of approximately 100m.

 

Figure 14-19. Log-Probability Plots for Composites - Cu

 

 

 

Figure 14-20. Log-Probability Plots for Composites – Zn

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 82

 

Table 14-6. Statistical Summary– RD Composites
[ TRUETHK = True Thickness in m]
FIELD ZONE NUMBER MIN MAX MEAN VARIANCE STANDDEV   COVARTN%   PCTL10 PCTL50 PCTL90
Cu_pct 2 17 0.31 6.82 1.10 1.60 1.26 115.33 0.39 0.74 2.77
Cu_pct 3 8 0.30 1.40 0.83 0.12 0.34 41.57 0.26 0.67 1.18
Cu_pct 5 5 0.42 1.05 0.68 0.06 0.23 34.38 0.36 0.71 1.00
Cu_pct 6 23 0.41 8.00 1.84 1.07 1.03 56.12 0.47 1.95 3.50
Cu_pct 7 9 0.39 3.09 1.03 0.42 0.65 63.32 0.35 1.96 2.26
Cu_pct 8 8 0.36 5.26 1.19 0.98 0.99 82.95 0.31 1.95 4.50
Cu_pct 9 11 0.37 5.10 1.02 1.08 1.04 101.89 0.38 0.73 3.19
Cu_pct 10 8 0.32 5.12 2.12 1.95 1.40 65.87 0.32 1.56 4.81
Cu_pct All 89 0.30 8.00 1.14 1.03 1.02 89.02 0.42 1.16 3.59
Zn_pct 2 16 0.01 1.42 0.30 0.06 0.24 78.61 0.02 0.23 0.71
Zn_pct 3 6 0.01 1.54 0.29 0.18 0.43 149.72 - 0.17 0.73
Zn_pct 5 4 0.03 0.64 0.25 0.05 0.23 90.42 0.01 0.10 0.44
Zn_pct 6 20 0.01 1.51 0.27 0.04 0.21 77.24 0.02 0.28 0.75
Zn_pct 7 5 0.09 0.72 0.21 0.02 0.15 74.06 0.03 0.38 0.55
Zn_pct 8 8 0.02 2.81 0.15 0.17 0.42 271.89 0.02 0.22 0.95
Zn_pct 9 7 0.00 1.03 0.18 0.11 0.33 190.33 0.00 0.06 0.96
Zn_pct 10 4 0.01 1.07 0.53 0.12 0.35 65.49 - 0.50 0.92
Zn_pct All 70 0.00 2.81 0.26 0.09 0.29 113.16 0.02 0.22 0.92
TRUETHK 2 17 0.96 14.58 5.85 17.52 4.19 71.51 0.97 3.92 11.13
TRUETHK 3 8 0.95 9.39 5.38 9.55 3.09 57.48 0.77 5.27 8.79
TRUETHK 5 5 1.76 47.12 15.43 289.48 17.01 110.25 0.71 5.10 33.23
TRUETHK 6 23 0.15 9.67 3.10 4.19 2.05 66.06 0.40 2.95 5.21
TRUETHK 7 9 0.02 7.23 2.37 7.35 2.71 114.19 0.02 1.08 6.97
TRUETHK 8 8 0.71 18.67 5.08 42.68 6.53 128.56 0.69 1.31 14.55
TRUETHK 9 11 0.33 6.04 2.33 3.22 1.79 76.90 0.36 1.48 5.20
TRUETHK 10 8 0.10 3.18 0.87 1.07 1.04 119.24 0.10 0.22 1.92
TRUETHK All 89 0.02 47.12 4.33 36.49 6.04 139.43 0.26 2.95 9.62

 

Table 14-7. Statistical Summary– H2 Composites
FIELD ZONE NUMBER MINIMUM MAXIMUM MEAN VARIANCE STANDDEV COVARTN% PCTL10 PCTL50 PCTL90
Cu_pct 2 119 0.31 4.00 0.91 0.19 0.44 48.6 0.39 0.76 1.47
Cu_pct 3 54 0.31 2.70 0.87 0.25 0.50 57.5 0.39 0.80 1.60
Cu_pct 5 12 0.31 1.74 0.93 0.18 0.43 45.8 0.34 0.99 1.22
Cu_pct All 185 0.31 4.00 0.90 0.21 0.45 50.2 0.39 0.77 1.57
Zn_pct 2 34 0.00 0.36 0.07 0.003 0.05 73.8 0.01 0.06 0.16
Zn_pct 3 15 0.01 0.41 0.13 0.010 0.10 78.5 0.02 0.12 0.31
Zn_pct 5 4 0.05 0.30 0.09 0.002 0.05 53.2 0.03 0.12 0.23
Zn_pct All 53 0.00 0.41 0.09 0.006 0.07 82.0 0.01 0.08 0.24
TRUETHK 2 119 0.02 17.7 4.3 13.3 3.6 84.0 0.4 3.5 9.0
TRUETHK 3 55 0.46 15.5 3.1 11.4 3.4 107.3 0.5 2.0 8.4
TRUETHK 5 12 0.72 20.0 7.9 40.9 6.4 81.3 0.7 7.8 15.1
TRUETHK All 186 0.02 20.0 4.2 15.7 4.0 94.1 0.6 2.3 9.7

 

Table 14-8. Statistical Summary– SM Composites
FIELD ZONE NUMBER MIN MAX MEAN VARIANCE STANDDEV COVARTN% PCTL10 PCTL50 PCTL90
Cu_pct 2 42 0.31 1.62 0.92 0.17 0.41 44.94 0.41 0.79 1.32
Cu_pct 3 3 1.60 1.72 1.66 0.00 0.04 2.67 1.54 1.69 1.71
Cu_pct 5 32 0.34 1.81 0.99 0.08 0.29 29.13 0.48 0.93 1.31
Cu_pct All 77 0.31 1.81 1.00 0.15 0.38 38.30 0.46 0.90 1.44
Zn_pct 2 42 0.01 0.39 0.15 0.01 0.08 55.65 0.03 0.12 0.25
Zn_pct 3 2 0.22 0.23 0.22 0.00 0.00 0.56 0.22 0.23 0.23
Zn_pct 5 32 0.03 0.28 0.15 0.00 0.05 33.57 0.09 0.15 0.23
Zn_pct All 76 0.01 0.39 0.16 0.00 0.07 44.34 0.04 0.15 0.24
TRUETHK 2 42 0.00 15.84 2.65 10.08 3.17 119.99 0.15 1.31 6.43
TRUETHK 3 3 1.75 9.43 5.71 9.86 3.14 54.95   5.97 8.39
TRUETHK 5 32 0.30 13.55 4.03 11.73 3.43 85.04 0.97 2.31 8.44
TRUETHK All 77 0.00 15.84 3.34 11.44 3.38 101.26 0.31 1.80 7.96

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 83

 

Figure 14-21. RD – Cu Experimental Isotropic Variograms

 

 

 

Figure 14-22. H2 - Cu Experimental Isotropic Variograms

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 84

 

14.7 Volumetric Modelling

 

Separate volumetric block models were set up for each of the SD, H2 and RD deposits using the following procedure:

 

1.DTM Creation. A DTM was generated, based on the centre of each intersection. Some additional control strings were used to limit define the extent of each DTM.

 

2.Prototype. A model prototype was set up, using 10m x 10m blocks laterally, and columnar (variable height blocks in the Z direction) for SM and 5m high parent blocks for RD and H2.

 

3.Initial Zone Modelling. Based on the DTMs, zone blocks were generated with an artificially set 2m sub-cell height.

 

4.Thickness Estimation. Composite apparent true thickness values were estimated into zone sub-blocks, using inverse-distance weighting. The sub-cell heights were then set to the estimated thickness values.

 

A summary of the model prototypes is shown in Table 14-9, which are depicted in plan in Figure 14-23. Prior to estimation, blocks were split vertically into 5m high sub-cells.

 

Table 14-9. Summary of Model Prototypes
RD   Minumum Maximum Size Number Extent
X   543,500 547,000 5 700 3,500
Y   7,448,100 7,450,000 5 380 1,900
Z - 500 350 850 1 850

 

H2   Minumum Maximum Size Number Extent
X   547,120 549,100 5 396 1,980
Y   7,447,060 7,448,600 5 308 1,540
Z - 400 600 1,000 1 1,000

 

SM   Minumum Maximum Size Number Extent
X   542,000 543,000 10 100 1,000
Y   7,444,800 7,445,900 10 110 1,100
Z   250 450 200 1 200

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 85

 

Figure 14-23. Plan of Model Prototypes

[Blue = Drill holes in current database; Green = 10m surface contours]

 

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 86

 

14.8 Grade Estimation

 

Cu and Zn grade values were estimated into the zone sub-blocks, using inverse-distance weighting. Alternative values were also estimated using nearest-neighbour estimation, for validation purposes. The estimation parameters applied are summarised in Table 14-10.

 

Table 14-10. Grade Estimation Parameters
    Distances (m):          
              Max. Minimum
Field Search Along- Down- Cross- Minimum Maximum Comps Per No. of
  Volume Strike Dip Strike Composites Composites Drillhole Drillholes
  1 50 50 10 3 15 2 2
Cu/Zn 2 100 100 20 3 15 2 2
  3 200 200 40 1 7 2 1

 

Notes

. Main grades estimated using ID^2

. Grades also estimated NN, for validation purposes

. Density value 3t/m3 assumed

. Blocks for estimation in RD and H2 sized 10m x 10m x 5m

. Blocks for estimation in SM sized 10m x 10m x Columnar

 

A global density of 3t/m3 was assumed, as discussed in Section 12.6. Example cross-sections of the estimated grade models are shown in Figure 14-24 to Figure 14-26. A complete set of grade sections for RD, SM and H2 deposits are shown in Appendices B, C and D respectively.

 

Figure 14-24. Example Cross-Section – RD

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 87

 

Figure 14-25. Example Cross-Section – H2

 

 

 

Figure 14-26. Example Cross-Section – SM

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 88

 

14.9 Resource Classification

 

Definitions for resource categories used in this report are consistent with CIM (2014) definitions incorporated by reference into NI 43-101. In the CIM classification, a Mineral Resource is defined as “a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity, and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific geological evidence and knowledge, including sampling. Mineral Resources are classified into Measured, Indicated, and Inferred categories. A Mineral Reserve is defined as the “economically mineable part of a Measured and/or Indicated Mineral Resource” demonstrated by studies at pre-feasibility or feasibility level as appropriate. Mineral Reserves are classified into Proven and Probable categories.

 

All mineral resources estimated in this study have been classified as Inferred category. The rationale for this decision includes the following:

 

·A complete lack of QAQC samples in the available data sets. However, it is believed prior operators conducted their work in accordance with the best practices of the period. This is supported by the continued existence of core and related inventory data at Lokken.

 

·Extremely limited density data sets available.

 

·Limited underground geological mapping information.

 

·Dependence on some drill holes with very poor intersection angles.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 89

 

14.10 Model Validation

 

For the mineral resource estimation, model validation included the following steps:

 

14.10.1       Cross-Sections

 

Cross-sections were prepared for each deposit and for each of their respective zones, then compared with the downhole composite data.

 

14.10.2       Global Comparison of Grades

 

The overall average sample and composite metal grades were compared with global average grades from each block model, as interpolated by inverse-distance weighting and nearest neighbour. These results are summarised below in Table 14-11, showing reasonably good correspondence.

 

Table 14-11. Global Comparison of Average Grades
FIELD ZONE Samples Composites Model ID Model NN
Cu_pct 2 0.88 0.91 0.78 0.74
Cu_pct 3 0.82 0.87 0.80 0.76
Cu_pct 5 1.03 0.93 0.97 0.94
Zn_pct 2 0.08 0.07 0.07 0.07
Zn_pct 3 0.24 0.13 0.13 0.15
Zn_pct 5 0.12 0.09 0.12 0.13

 

14.10.3       Local Comparison of Grades

 

Average grades along vertical columnar (50 m thick) block model slices were determined, derived from the inverse-distance and nearest neighbour grades. These were shown, along with the average composites’ grades and total tonnages on the same slices, in comparative swath plots for Cu, as shown in Figure 14-27. These graphs show that the average block model grades compare reasonably well with the corresponding average composite grades.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 90

 

Figure 14-27. Swath Plots – Cu

 

 

 

 

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 91

 

14.11 Resource Evaluation

 

For reporting purposes for a mineral resource estimate connected with a potential future underground mining operation, to comply with ‘reasonable prospects of eventual economic extraction’ guidelines, the following steps were completed:

 

1)Cut-Off. An economic cut-off grade was determined, applicable to underground mining at Sulitjelma deposit, as summarised in Table 14-13. This also shows the parameters used to determine a copper-equivalent (Cu_Eq) grade values, derived from both Cu and Zn. The assumed recovery values come from the 2020 testwork. The Cu_Eq parameters stem from price, recovery and payability values. The cut-off applied for resource evaluation was 0.6% CuEq.

 

2)Constraining Volumes. A mineable shape optimisation (“MSO”) was run (Datamine process MSO), to generate reasonably practical constraining wireframe volumes for a mineral resource estimate. The parameters used in this optimisation are summarised in Table 14-12 This applied selectivity means that a small amount of sub-0.6%Cu_Eq material is taken within the estimation process (‘must-take’) and some +0.6%Cu_Eq material is excluded.

 

3)Evaluation. The estimation of Inferred mineral resources was broken down by zone and deposit, and they are summarised in Table 14-18, showing grades of Cu and Zn, as well as average apparent true thickness values. Grade-tonnage tables of the different regions, as well as overall, are shown in Table 14-14 to Table 14-17.

 

Table 14-12. MSO Parameters
Factor Unit Value
Cut-Off %Cu_Eq 0.6
Minimum height m 2.2
Minimum length along strike m 10
Minimum length down-dip m 10
Minimum waste pillar thickness m 7

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 92

 

Table 14-13. Cut-Off Grade and Cu_Eq Parameters

     
  Values  
Cu Metal Price 4.2 $/lb
  9,259 $/t
Cu Processing    
Processing Recovery 92.0%  
Concentrate Grade 29.5% % Cu
Assumed Feed Grade 0.83% % Cu
     
Cu Smelter Terms    
TC/RC 65 $/t conc
  220 $/t Cu product
Freight Charge 70 $/t conc
  237 $/t Cu product
Payability 96.5%  
     
Operating Costs    
Mining 35 $/t
G&A + infra + closure + royalty 5 $/t
Processing 10 $/t
Total = mining, G&A, processing 50  
     
Breakeven Cu Cut-Off 0.6% %Cu
     
Zn Contribution to Cu_Equivalent    
Zn metal price 1.25 $/lb
  2,756 $/t
Zn processing recovery 57%  
Zn Concentrate Grade 51% %Zn
Zn payability 86%  
CuEq Coefficient 0.16 %CuEq/%Zn
     

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 93

 

Table 14-14. Grade-Tonnage Table – RD Region, Inferred Resources Only

 

 

 

Table 14-15. Grade-Tonnage Table – H2 Region, Inferred Resources Only

 

 

 

Table 14-16. Grade-Tonnage Table – SM Region, Inferred Resources Only

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 94

 

Table 14-17. Grade-Tonnage Table – RD, H2 and SM Regions, Inferred Resources Only

 

 

 

Table 14-18. Constrained Mineral Resource Estimate Statement

Effective Date: 20th February 2025
      Inferred Resources By Zone     Sub-Totals  
Region Zone Tonnes Cu Zn Cu_Eq Thickness Tonnes Cu Zn Cu_Eq
    Kt % % % m Kt % % %
  2 4,188 1.45 0.35 1.50 5.2        
Rupsi 3 1,499 0.95 0.19 0.98 5.5        
  5 2,188 0.82 0.37 0.88 15.7 7,874 1.18 0.33 1.23
  6 410 1.40 0.24 1.43 3.6        
  7 126 0.77 0.15 0.79 2.4        
Dypet 8 484 0.89 0.11 0.91 6.8        
  9 163 2.01 0.25 2.05 2.5        
  10 201 1.39 0.36 1.45 2.9 1,384 1.23 0.20 1.27
  2 3,031 0.88 0.07 0.89 4.2        
Hankabakken II 3 1,471 0.86 0.05 0.86 3.1        
  5 453 1.00 0.02 1.00 9.1 4,955 0.88 0.06 0.89
  2 455 1.15 0.19 1.18 3.6        
Sagmo 3 193 1.56 0.14 1.58 6.4        
  5 2,205 0.89 0.15 0.91 4.1 2,853 0.98 0.16 1.00
Total   17,066 1.06 0.21 1.10 6.1        

 

Notes:

1.CIM definitions were followed for MRE.
2.All resources reported are categorised Inferred; no Measured or Indicated resources.
3.Thickness reported above shows the average Apparent True Thickness values.
4.A minimum mining thickness of 2.2 m was applied in making the MRE constraint wireframes.
5.The MRE constraint wireframes were generated using a preliminary MSO, based on a cut-off grade of 0.60% Cu_Eq, related to potential underground mining.
6.Assumed parameters for the cut-off grade and Cu-equivalent (Cu_Eq) calculations included:
   Prices: USD 4.20/lb Cu, USD 1.25/lb Zn
  Processing recoveries: 92% Cu, 57% Zn
  Payabilities: 96.5% Cu, 86% Zn
7.For the cut-off grade calculation, the assumed total operating cost was $50/t of ore.
8.A global density value of 3 t/m3 was assumed.
9.Rounding may result in apparent summation differences between tonnes, grades and metal content; not considered material.
10.Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 95

 

15 MINERAL RESERVE ESTIMATES

 

Not applicable

 

16 MINING METHODS

 

Not applicable

 

17 RECOVERY METHODS

 

Not applicable

 

18 PROJECT INFRASTRUCTURE

 

Not applicable

 

19 MARKET STUDIES AND CONTRACTS

 

Not applicable

 

20 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL IMPACT

 

Not applicable

 

21 CAPITAL AND OPERATING COSTS

 

Not applicable

 

22 ECONOMIC ANALYSIS

 

Not applicable

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 96

 

23 ADJACENT PROPERTIES

 

There are two other Exploration companies with exploration licenses in or close to Sulitjelma:

 

Sulis Green Future has exploration licenses immediately to the north of NSG’s licenses (Figure 23-1).

 

VMS Exploration have exploration licenses to the north as well as overlying NSG’s licenses. They do not have any Mining licenses in the Sulitjelma area (Figure 23-2).

 

This information is publicly disclosed and the source of this information is from the Norwegian Mapping Authorities web site (Kartverket).

 

The Author has not visited these other properties and is therefore unable to verify information pertaining to the presence of mineralization on the adjacent properties. These properties are not necessarily indicative of the mineralization associated with the Sulitjelma project that is the subject of this report. The information provided in this section is simply intended to provide examples of other properties that exist in the region. The Author is not aware of any historical estimates of mineral resources or mineral reserves relating to these adjacent properties.

 

Figure 23-1. Plan of Sulis Green Future License Areas

[Sulis Green Future licenses in Blue; Sulitjelma licenses in Black]

 

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 97

 

Figure 23-2. Plan of VMS Exploration License Areas

[VMS Exploration licenses in Blue; Sulitjelma licenses in Black]

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 98

 

24 OTHER RELEVANT INFORMATION

 

Not applicable.

 

25 INTERPRETATION AND CONCLUSIONS

 

25.1 Risks and Uncertainties

 

There are several risks and uncertainties associated with the Sulitjelma project that should be considered; however, there are also several generic risks that are associated with nearly all exploration and mining project, including but not limited to the following:

 

·Sensitivity of the mineral resource to metal pricing
·Supply chain cost escalation for contractors and service providers
·Possible exploration permitting difficulties, related costs, and resulting delays

 

The project specific risks and uncertainties that the Author has identified are discussed in this section of the report.

 

25.1.1 Drill holes

 

There are some errors associated with elevation of surface drill hole collars. These errors can be mitigated with check measurements of surface drill hole collars using a differential GPS. It would also be recommended to have a LiDAR survey flown over the Sulitjelma Project area for cross checking with the differential GPS survey. Similarly, if and where possible, check surveys should also be made of available underground drill hole collars.

 

25.1.2 Density Measurements.

 

There is a considerable lack of available density data for samples collected from drill core associated with any of the deposits. This lack of density data creates a corresponding risk with respect to the tonnage estimation. The risk can be mitigated in the future by collecting more density measurements of available drill core, as well as proactively taking density measurements from drill core during any new diamond drilling.

 

25.1.3 Historic QA/QC Procedures.

 

There is almost no information available on historical QAQC. To help mitigate the risks associated with use of the historical drill hole data, a twin drilling program would be required. A full QAQC program would need to be followed for the sampling associated with such updated drilling. The twin holes need to duplicate a small proportion of the original drill holes for each deposit or at least end up with new mineralised intersections that are similar to the original, historical intersections. Statistical results between the twinned drill holes would need to demonstrate a good correspondence between the current and historical assay data.

 

Without such a verification exercise, it is unlikely that the historical drilling data would be acceptable to use for the categorisation of Indicated resources.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 99

 

25.1.4 Mined-Out Areas

 

The extent of historic mined-out areas has been taken from old plans but should be validated. There is a risk that inaccuracies of this data of the historical mined-out areas could affect the estimation of currently available resources. This risk could be mitigated by updated volumetric surveys of mined out areas. Although access might be difficult in some areas, modern survey equipment, including the use of drones, could help with this analysis.

 

25.2 Results and Interpretations

 

There are several opportunities to improve the current results, that should be investigated further as part of the ongoing development of the Sulitjelma project.

 

Most of the regions evaluated in this study have some parts which are relatively densely sampled, in areas in or close to the old underground workings. Going down-dip, the drill hole spacings are generally much wider, with more reliance on much longer underground drill holes, often with very poor intersection angles, or on relatively few surface drill holes.

 

Further drilling campaigns could therefore have a significant effect on the development of the project, in terms of:

 

·The use of twin holes to help verify all or part of the historical drilling data.
·Increased Inferred resource quantities with more closely spaced drilling down-dip and along-strike, as well as extension of the mineralised resources.
·Estimation of some Indicated resources with even more closely spaced drilling. To achieve Indicated resource categorisation using any of the historical drill hole data, the results from twin drilling would have to help verify the use of all or part of the historical drill hole database.

 

Additional drilling should be designed to enable a significant proportion of the deposit to be reclassified into a higher category of confidence, such as Indicated category, as well as provide a more accurate interpretation of geology and mineralised zones. Stakeholders should be cautioned that additional drilling is not a guarantee for upgrading the confidence of an existing resource category.

 

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 100

 

25.3 Conclusions

 

The updated mineral resource estimate with an effective date of February 20th, 2025, has these conclusions from the Author and are as follows:

 

·The geological setting and character of the massive and semi-massive sulphide mineralisation, hosted within a chlorite-biotite breccia, as well as the Cu and Zn production history, are of sufficient merit to justify additional exploration expenditures.
·Most historic drill holes in the current database related to the mineral resources at Sulitjelma are located in 3 different regions, totalling 601 core drill holes a total meterage of 78,144 metres. The regions being evaluated are on the periphery of older mined-out areas.
·Historic drilling has identified strata-bound zones that are generally extensions of previously mined areas above, are well mineralized and remain open to depth.
·The Author has reviewed the available sample data, and although the there is a lack of QAQC information available, the Author is of the opinion that the database for the mineral resource is of sufficient quality to estimate mineral resources for an Inferred category.
·Mineral resources were estimated using a 0.6% copper-equivalent cut-off value for potential underground extraction. This cut-off level would also need to be studied further in the future.
·The mineral resource estimate for the Sulitjelma deposit is presented in Table 25.1 below.
·There is general support for the project, at the current stage of mineral resource development, from the affected communities in the area, as those communities will benefit from local employment. There is a good dialogue with people from the local reindeer district.

 

Table 25.1. Mineral Resource Estimate Summary for the Sulitjelma deposit

Effective Date: 20th February 2025
    Inferred Resources  
Region Tonnes Cu Zn Cu_Eq
  Kt % % %
Rupsi/ Dypet 9,258 1.19 0.31 1.24
Hankabakken II 4,955 0.88 0.06 0.89
Sagmo 2,853 0.98 0.16 1.00
Total 17,066 1.06 0.21 1.10

 

Notes:

1.CIM definitions were followed for MRE.
2.All resources reported are categorised Inferred; there are no Measured or Indicated resources.
3.A minimum mining thickness of 2.2 m was applied in making the MRE constraint wireframes.
4.The MRE constraint wireframes were generated using a preliminary MSO, based on a cut-off grade of 0.6% Cu_Eq, related to potential underground mining.
5.Assumed parameters for the cut-off grade and Cu-equivalent (Cu_Eq) calculations included:

   Prices: USD 4.20/lb Cu, USD 1.25/lb Zn
  Processing recoveries: 92% Cu, 57% Zn
  Payabilities: 96.5% Cu, 86% Zn
6.For the cut-off grade calculation, the assumed total operating cost was $50/t of ore.
 7.  A global density value of 3 t/m3 was assumed.
8.Rounding may result in apparent summation differences between tonnes, grades and metal content; not considered material.
9.Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 101

 

26 RECOMMENDATIONS

 

26.1 Sample Preparation, Analyses, and Security

 

·QAQC Program. Develop rigorous quality control and quality assurance (“QAQC”) policy for standards, blanks and duplicate samples for all on-going drilling and sampling work that meets or exceeds all industry best practice standards.
·CRMs. The QAQC program will also need to include the selection of certified reference material (“CRM”) that are sourced from a similar deposit type and possess metal values close to the typical grades of the Sulitjelma Project for copper and zinc. It is noted that when both gold and silver are better characterized, it might be needed to adjust the CRMs to accommodate the precious metal content.
·Laboratories. As well as using an ISO certified primary laboratory, the QAQC program will also require an umpire or secondary independent laboratory, which should also be ISO certified. A percentage of the new samples should be emitted using select analysis methodologies that are like the primary laboratory. This comparison will provide assurances that any variation of metal grades seen in the analytical certificates are valid and respected.
·Core Shack. A secure premises will be required for drill core logging that can also provide storage for the drill core and all returned pulps and reject materials from the analytical facilities.
·Density Measurement. Equipment needs to be put into place and procedures established for density measurement from the drill core of any new work program, as well as collect check density measurements from historical core at Lokken.
·Point Load Testing (“PLT”). To enhance any geomechanical measurements, a PLT needs to be acquired and used in the core shack on drill core from any new work program. These measurements compliment the collection of RQD and RMR during the core logging process, and can be used by engineers in the future for helping refine the ground support requirements.

 

26.2 Data Verification

 

·Relogging of Drill Core. A relogging program should be completed of Sulitjelma Project historical drill core stored at Lokken. This work would be more extensive than any previous relogging exercise; noting that relogging will be difficult, as much of the core is extremely dirty. If possible, some check sampling should also be completed while relogging is ongoing, although in most cases there is little, or no drill core left in the core boxes from the originally sampled intersections. As well, additional sampling of previously unsampled drill core should be done, noting that at current cut-off levels for the mineral resource estimate, there are potentially extended or new mineralised intersections that could warrant follow-up.
·Drilling Database. The current database needs to be enhanced so that YEAR identification data is recorded for each drill hole. This is very important, as in on-going verification and estimation work, it may be necessary to filter the historic data with relation to the date of age of the data available.
·Twin Drilling. A twin drilling program should be completed during the next work program, to help verify all or part of the historical drilling data for each deposit. NSG have already planned the extension of an existing underground adit, the Rupsi tunnel, for the purpose of providing drilling access. A suggested starting proportion of twinning could be 5%, with respect to historic drill holes for each deposit. When the assay results are returned from the laboratory and analysed, it can be determined if and where further twin drilling would be required.

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 102

 

·Drill Hole Collars. During summer, historic surface drill hole collars should be found and resurveyed, where possible. Depending on the extent of underground access, the location and resurveying of underground drill hole collars should also be attempted.
·Mined-Out Extents. Again, depending on underground access, surveys should be made of mined-out areas adjacent to the evaluated resources. Modern equipment, including the use of drones, could help with this check survey process.
·Metallurgical Program. A full metallurgical audit should be undertaken regarding the production recoveries and any reports on file. Once there is new material available from drilling that is representative of the deposits, a new metallurgical program should be planned to encompass flotation test work, variability analysis, and lock cycle testing to ensure process design in the plant is setup for maximizing metal recovery.

 

26.3 Exploration Program and Budget

 

For further development of the project, the Author recommends the exploration program already outlined by NSG. This work covers extension of the existing Rupsi tunnel by 1,000 m, and then using of this new tunnel to complete approximately 10,000 m of diamond drilling from underground. The intent of the drilling is to potentially upgrade confidence for the resources in the Rupsi deposit from Inferred category to Indicated category and allow some geomechanical modelling.

 

A summary breakdown of this work program is presented below, along with associated estimated costs expected to total approximately 4.6 M USD (Table 26-1).

 

Table 26-1. Proposed Budget
Work Planned Cost
  M USD
Extension of Rupsi Tunnel (1 km) 3.4
Diamond drilling (~10,000 m) 1.2
Total 4.6

 

Adam WheelerSeptember 2025

Technical Report on the Mineral Resources of the Sulitjelma Project 
 103

 

27 REFERENCES

 

Cook, Halls and Kaspersen, 1990. The Geology of the Sulitjelma Ore Field, Northern Norway-- Some New Interpretations. Economic Geology, Vol 85, pp 1720-1737.

 

Drake Resources, 2015. Quarterly Activities Report, September 2015.

 

Geis, H, 1978. Structural Control of Stratiform Sulfide Deposits, with A New Example from Sulitjelma. Economic Geology, Vol 73, pp. 1161-1177.

 

Nordrum, F.S., 1999. Minerals from the Sulitjelma Copper Mines, North Norway.

 

Outotec, 2013. Preliminary Feasibility Study, Nye Sulitjelma AS.

 

Promin, 2021. Lokken Fieldwork Report – Relogging of Old Drill Cores.

 

Sarb Consulting, 2020. Environmental Geochemical Assessment of Tailings Disposal in Langvatnet, Nye Sulitjelma Mines.

 

SGS Canada, 2020. An Investigation into The Flotation of Sample from Sulitjelma Mine.

 

Report prepared for Sarb Consulting.

 

Wilson, M.R.. 1973. The Geological Setting of the Sulitjelma Ore Bodies, Central Norwegian Caledonides. Economic Geology, Vol 68, pp. 307-316.

 

Adam WheelerSeptember 2025