CONCESSION ARRANGEMENTS RIGHTS
12 Months Ended
Dec. 31, 2025
Disclosure of detailed information about service concession arrangements [abstract]  
CONCESSION ARRANGEMENTS RIGHTS

NOTE 16 – CONCESSION ARRANGEMENTS RIGHTS

The following is the balance of the assets in concession arrangements registered in the Group as of December 31, 2025 and 2024:

​

​

​

​

​

​

​

​

  ​ ​ ​

December 31, 2025

  ​ ​ ​

December 31, 2024

Financial assets at fair value (1)

 

Ps.

2,635,437

  ​

Ps.

4,181,835

Financial asset at amortized cost net (2)

 

  ​

14,431,265

  ​

​

15,078,406

Total financial assets in concession arrangements rights (3)

​

Ps.

17,066,702

​

Ps.

19,260,241

Intangible assets (1)

 

  ​

13,495,108

  ​

​

14,314,560

Total assets in concession arrangements rights

 

Ps

30,561,810

  ​

Ps.

33,574,801

(1)The variation corresponds to the termination of the concession agreement for the Ballena–Cartagena gas pipeline section, operated by Promigas, in compliance with the contractual and regulatory conditions applicable to the natural gas transportation system. As a result, the asset is reclassified as property, plant, and equipment, with Promigas remaining as its operator. See note 12.1, “Assets under concession agreements” and 16.2 “Financial assets in concession arrangements”.
(2)As of December 31, 2025 and 2024, the balance of the financial asset at amortized cost includes an impairment expense of Ps. 648 and Ps. (709) respectively, see note 16.1.
(3)See note 12.1, “Assets under concession agreements”.

​

​

16.1     Financial Assets in Concession Arrangements

​

The following table shows the changes in financial assets in concession arrangements registered in Grupo Aval’s subsidiaries for the years ended on December 31, 2025, 2024 and 2023:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

  ​ ​ ​

Energy and Gas

​

​

​

​

Infrastructure

​

​

​

​

​

At fair value

​

At amortized cost

​

Total

​

At amortized cost

  ​ ​ ​

Total

Balance as of January 1, 2023

 

Ps.

3,507,231

​

Ps.

4,824

​

Ps.

3,512,055

​

Ps.

12,640,961

​

Ps.

16,153,016

Additions or new concession arrangements

​

​

—

​

​

118,109

​

​

118,109

​

​

877,884

​

​

995,993

Collections during the year

 

  ​

—

​

  ​

—

​

  ​

—

​

  ​

(1,144,396)

​

  ​

(1,144,396)

Adjustment to fair value

 

  ​

323,685

​

  ​

—

​

  ​

323,685

​

  ​

—

​

  ​

323,685

Accrued interest

 

  ​

—

​

  ​

—

​

  ​

—

​

  ​

1,493,115

​

  ​

1,493,115

Year impairment charge

 

  ​

—

​

​

—

​

  ​

—

​

  ​

(223)

​

  ​

(223)

Effect of movements in exchange rates

​

​

—

​

​

(8,370)

​

​

(8,370)

​

​

—

​

​

(8,370)

Balance as of December 31, 2023

 

Ps.

3,830,916

​

Ps.

114,563

​

Ps.

3,945,479

​

Ps.

13,867,341

​

Ps.

17,812,820

Additions or new concession arrangements

​

​

—

​

  ​

76,572

​

​

76,572

​

​

1,100,702

​

​

1,177,274

Collections during the year

 

  ​

—

​

  ​

(74,231)

​

  ​

(74,231)

​

  ​

(897,403)

​

  ​

(971,634)

Adjustment to fair value

 

  ​

350,919

​

  ​

—

​

  ​

350,919

​

  ​

—

​

  ​

350,919

Accrued interest

 

  ​

—

​

  ​

—

​

  ​

—

​

  ​

861,175

​

  ​

861,175

Year impairment charge

​

​

—

​

​

—

​

​

—

​

​

(709)

​

​

(709)

Effect of movements in exchange rates

​

​

—

​

  ​

30,396

​

​

30,396

​

​

—

​

​

30,396

Balance as of December 31, 2024

 

Ps.

4,181,835

​

Ps.

147,300

​

Ps.

4,329,135

​

Ps.

14,931,106

​

Ps.

19,260,241

Additions or new concession arrangements

 

  ​

—

​

​

19,451

​

  ​

19,451

​

  ​

543,610

​

  ​

563,061

Net effect from concession termination (1)

​

​

(2,169,561)

​

​

—

​

​

(2,169,561)

​

​

—

​

​

(2,169,561)

Collections during the year (2)

 

  ​

—

​

​

(155,978)

​

  ​

(155,978)

​

  ​

(1,947,215)

​

  ​

(2,103,193)

Adjustment to fair value

 

  ​

623,163

​

​

—

​

  ​

623,163

​

  ​

—

​

  ​

623,163

Accrued interest

 

  ​

—

​

​

—

​

  ​

—

​

  ​

879,130

​

  ​

879,130

Year impairment charge

​

​

—

​

​

—

​

​

—

​

​

648

​

​

648

Effect of movements in exchange rates

 

  ​

—

​

​

13,213

​

  ​

13,213

​

  ​

—

​

  ​

13,213

Balance as of December 31, 2025

 

Ps.

2,635,437

​

Ps.

23,986

​

Ps.

2,659,423

​

Ps.

14,407,279

​

Ps.

17,066,702

(1)As of December 31, 2025, the Company recognizes the termination of the concession contract related to the Ballena–Cartagena gas pipeline segment, operated by Promigas.
(2)As of December 31, 2025, advances received under Infrastructure relate to Concesionaria Vial del Oriente S.A.S. for Ps. (547,452) and Concesionaria Vial del Pacífico S.A.S. for Ps. (1,399,763). As of December 31, 2024, advances received under Infrastructure relate to Concesionaria Panamericana S.A. for Ps. (27,795), Concesionaria Vial del Oriente S.A.S. for Ps. (848,947), and Concesionaria Vial del Pacífico S.A.S. for Ps. (20,661).

 

​

16.2     Intangible Assets in Concession Arrangements

​

The following table shows the movements of the main concession arrangements in Grupo Aval’s subsidiaries under intangible assets during years ended at December 31, 2025, 2024 and 2023:

​

​

​

​

​

​

​

​

​

​

​

Cost

  ​ ​ ​

Energy and Gas

​

Infrastructure

​

Total

Balance as of January 1, 2023

 

Ps.

7,238,835

  ​

Ps.

7,521,341

 

Ps.

14,760,176

Additions (1)

 

  ​

588,454

​

​

714,489

 

  ​

1,302,943

Transfers to PPE

 

  ​

229

​

​

4,041

 

  ​

4,270

Withdrawals

 

  ​

(6,489)

​

​

—

 

  ​

(6,489)

Effect of movements in exchange rates (2)

​

​

(712,856)

​

​

—

 

  ​

(712,856)

Balance as of December 31, 2023

 

Ps.

7,108,173

  ​

Ps.

8,239,871

 

Ps.

15,348,044

Additions (1)

 

  ​

741,423

​

​

708

 

  ​

742,131

Transfers to PPE

 

  ​

244

​

​

—

 

  ​

244

Transfer to non-current assets held for sale

​

​

(33,400)

​

​

—

​

​

(33,400)

Withdrawals

 

  ​

(21,794)

​

​

—

 

  ​

(21,794)

Effect of movements in exchange rates (2)

 

  ​

472,522

​

​

—

 

  ​

472,522

Balance as of December 31, 2024

 

Ps.

8,267,168

  ​

Ps.

8,240,579

 

Ps.

16,507,747

Additions (1)

 

  ​

726,404

​

​

—

 

  ​

726,404

Transfers to Other Intangible Assets (3)

​

​

(31,347)

​

​

—

​

​

(31,347)

Transfers to / from PPE (3)

 

  ​

(722,070)

​

​

—

 

  ​

(722,070)

Transfers to / from other accounts receivable for concession contracts (3)(4)

​

​

(639,347)

​

​

62,940

​

​

(576,407)

Withdrawals

 

  ​

(9,760)

​

​

—

 

  ​

(9,760)

Effect of movements in exchange rates (2)

 

  ​

(571,471)

​

​

—

 

  ​

(571,471)

Balance as of December 31, 2025

 

Ps.

7,019,577

  ​

Ps.

8,303,519

 

Ps.

15,323,096

​

​

​

​

​

​

​

​

​

​

Cost

  ​ ​ ​

Energy and Gas

​

Infrastructure

​

Total

​

​

​

​

​

​

​

​

​

​

Accumulated Amortization

 

Energy and Gas

​

Infrastructure

​

Total

Balance as of January 1, 2023

 

Ps.

(1,339,183)

  ​

Ps.

(165,863)

 

Ps.

(1,505,046)

Amortization of the year

 

  ​

(277,702)

​

​

(39,385)

 

  ​

(317,087)

Transfers to PPE

​

​

—

​

​

(2,184)

​

​

(2,184)

Withdrawals

 

  ​

289

​

​

—

 

  ​

289

Effect of movements in exchange rates (2)

 

  ​

41,062

​

​

—

 

  ​

41,062

Balance as of December 31, 2023

 

Ps.

(1,575,534)

  ​

Ps.

(207,432)

 

Ps.

(1,782,966)

Amortization of the year

 

  ​

(303,951)

​

​

(93,095)

 

  ​

(397,046)

Transfers to PPE

​

​

18

​

​

—

​

​

18

Transfer to non-current assets held for sale

 

  ​

26,426

​

​

—

 

  ​

26,426

Withdrawals

 

  ​

6,997

​

​

—

 

  ​

6,997

Effect of movements in exchange rates (2)

 

  ​

(37,931)

​

​

—

 

  ​

(37,931)

Balance as of December 31, 2024

 

Ps.

(1,883,975)

  ​

Ps.

(300,527)

 

Ps.

(2,184,502)

Amortization of the year

 

  ​

(319,923)

​

​

(86,002)

 

  ​

(405,925)

Transfers to Other Intangible Assets (3)

​

​

3,609

​

​

—

​

​

3,609

Transfers to / from PPE (3)

​

​

551,313

​

​

—

​

​

551,313

Transfers to other accounts receivable for concession contracts (3)

​

​

160,830

​

​

—

​

​

160,830

Withdrawals

 

  ​

3,136

​

​

—

 

  ​

3,136

Effect of movements in exchange rates (2)

 

  ​

44,576

​

​

—

 

  ​

44,576

Balance as of December 31, 2025

 

Ps.

(1,440,434)

  ​

Ps.

(386,529)

 

Ps.

(1,826,963)

​

​

​

​

​

​

​

​

​

​

Impairment loss

​

Energy and Gas

​

Infrastructure

​

Total

Balance as of January 1, 2023

​

Ps.

(7,811)

​

Ps.

(4,613)

​

Ps.

(12,424)

Period impairment charge

​

​

—

​

​

4,613

​

​

4,613

Balance as of December 31, 2023

​

Ps.

(7,811)

​

Ps.

—

​

Ps.

(7,811)

Period impairment charge

​

​

(874)

​

​

—

​

​

(874)

Balance as of December 31, 2024

​

Ps.

(8,685)

​

Ps.

—

​

Ps.

(8,685)

Transfers to / from PPE (3)

​

​

2,535

​

​

—

​

​

2,535

Withdrawals

​

​

5,125

​

​

—

​

​

5,125

Balance as of December 31, 2025

​

Ps.

(1,025)

​

Ps.

—

​

Ps.

(1,025)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Total Intangible Assets

 

Energy and Gas

​

Infrastructure

​

Total

Balance as of January 1, 2023

 

Ps.

5,891,841

  ​

Ps.

7,350,865

 

Ps.

13,242,706

Cost

 

  ​

(130,662)

  ​

​

718,530

 

  ​

587,868

Amortization

 

  ​

(236,351)

  ​

​

(41,569)

 

  ​

(277,920)

Impairment loss

​

​

—

​

​

4,613

​

​

4,613

Balance as of December 31, 2023 (5)

 

Ps.

5,524,828

  ​

Ps.

8,032,439

 

Ps.

13,557,267

Cost

 

  ​

1,158,995

  ​

​

708

 

  ​

1,159,703

Amortization

 

  ​

(308,441)

  ​

​

(93,095)

 

  ​

(401,536)

Impairment loss

​

​

(874)

​

​

—

​

​

(874)

Balance as of December 31, 2024 (5)

 

Ps.

6,374,508

  ​

Ps.

7,940,052

 

Ps.

14,314,560

Cost

 

  ​

(1,247,591)

  ​

​

62,940

 

  ​

(1,184,651)

Amortization

 

  ​

443,541

  ​

​

(86,002)

 

  ​

357,539

Impairment loss

​

​

7,660

​

​

—

​

​

7,660

Balance as of December 31, 2025 (3)(5)

 

Ps.

5,578,118

  ​

Ps.

7,916,990

 

Ps.

13,495,108

(1)Gas and Energy, includes borrowing costs capitalized for Ps. 44,136 as of December 31, 2025; Ps. 39,433 as of December 31, 2024 and Ps. 31,672 as of December 31, 2023.
(2)Corresponds to the variation in the TRM between January and December: Ps. (652.07) per U.S. dollar in 2025, Ps. 587.1 in 2024, and Ps. (988.15) in 2023.
(3)For energy and gas, corresponds to the transfer of the value assigned to the residual control of the assets associated with the Ballena-Cartagena contract, in compliance with the contractual and regulatory conditions applicable to the natural gas transportation system. See note 12.1, “Assets in concession contracts.” See note 15, “Tangible assets.” See note 18, “Other intangible assets”.
(4)For infrastructure, corresponds to the recognition for tariff differential in accordance with Resolution No. 20253040030445 of August 4, 2025, which authorizes the increase of tolls to apply the collections that were not made during the years 2023 and 2024.
(5)As of December 31, 2025, includes intangible assets arising from concession contracts under construction in the Energy and Gas segment amounting to Ps. 190,673. As of December 31, 2024, includes intangible assets arising from concession contracts under construction in the Energy and Gas segment amounting to Ps. 209,535.

​

The following is a summary of the main concession contracts granted to Grupo Aval’s subsidiaries as of December 31, 2025:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Year of

​

​

​

​

Concession

​

​

​

​

​

​

​

​

​

Contract

​

construction

​

% Work

​

Concession

Owner

  ​ ​ ​

Recognition

  ​ ​ ​

Business and country

  ​ ​ ​

Objective

  ​ ​ ​

Current stage

  ​ ​ ​

date

  ​ ​ ​

start

  ​ ​ ​

Progress

  ​ ​ ​

end date

Gas and Energy

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Surtigas S.A. E.S.P.

​

Fair value / Intangible assets

​

Energy and Gas Colombia

​

Purchase, storage, packaging and distribution of gases derived from hydrocarbons.

​

Operation

​

03/1984 to 04/1994

​

1984

​

100

%  

2034 to 2045

Transmetano E.S.P. S.A.

​

Fair value / Intangible assets

​

Energy and Gas Colombia

​

Construction, operation and maintenance of gas transportation systems.

​

Operation

​

08/1994

​

1996

​

100

%  

2044

Promigas S.A. E.S.P.

​

Fair value / Intangible assets

​

Energy and Gas Colombia

​

Purchase, sale, transportation, distribution, exploitation and exploration of natural gas, oil and hydrocarbons in general.

​

Operation

​

05/1976 to 11/1994

​

1976

​

100

%  

2026 to 2044

Promioriente S.A. E.S.P.

​

Fair value / Intangible assets

​

Energy and Gas Colombia

​

Construction, operation and maintenance of gas pipelines.

​

Operation

​

09/1995

​

1995

​

100

%  

2045

Gases de Occidente S.A. E.S.P.

​

Fair value / Intangible assets

​

Energy and Gas Colombia

​

Transportation and distribution of liquefied petroleum gas and natural gas.

​

Operation

​

08/1998

​

1998

​

100

%  

2047

Compañía Energética de Occidente S.A. E.S.P. (1)

​

Intangible assets

​

Energy and Gas Colombia

​

Administrative, operational, technical and commercial management for the provision of electrical energy.

​

Operation and construction

​

01/2010

​

2010

​

100

%  

2035

Sociedad Portuaria El Cayao S.A. E.S.P.

​

Intangible assets

​

Energy and Gas Colombia

​

Construction, maintenance and administration of ports.

​

Operation

​

07/2015

​

2015

​

100

%  

2035

Gases del Pacífico S.A.C.

​

Amortized cost / Intangible assets

​

Energy and Gas Perú

​

Purchase, sale, production, commercialization of energy in any of its forms.

​

Operation

​

10/2013

​

2015

​

100

%  

2034

Gases del Norte del Perú S.A.C.

​

Amortized cost / Intangible assets

​

Energy and Gas Perú

​

Construction and distribution service of natural gas.

​

Operation and construction

​

11/2019

​

2020

​

100

%  

2051

Infrastructure

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Proyectos de Infraestructura S.A.

​

Intangible assets

​

Infrastructure Colombia

​

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

​

Operation

​

12/1993

​

1994

​

100

%  

2033

Concesionaria Panamericana S.A.S.

​

Amortized cost / Intangible assets

​

Infrastructure Colombia

​

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

​

Operation and maintenance

​

12/1997

​

2009

​

100

%  

2035

Concesionaria Vial del Pacífico S.A.S.

​

Amortized cost

​

Infrastructure Colombia

​

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

​

Construction

​

09/2014

​

2018

​

97

%  

2043

Concesionaria Nueva Vía del Mar S.A.S.

​

Amortized cost

​

Infrastructure Colombia

​

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

​

Preconstruction

​

01/2015

​

2027

​

4.11

%  

2044

Concesionaria Vial Andina S.A.S.

​

Intangible assets

​

Infrastructure Colombia

​

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

​

Operation and maintenance

​

06/2015

​

2016

​

100

%  

2054

Concesionaria Vial Del Oriente S.A.S.

​

Amortized cost

​

Infrastructure Colombia

​

Design, construction, equipment, conservation, operation and maintenance of road infrastructure.

​

Construction

​

07/2015

​

2018

​

98.32

%  

2043

(1)  The concession has an investment commitment for the expansion, replacement and improvement of the infrastructure which as of December 2025 has an advance of 62.34%.